建造与入级规范 海上移动钻井平台
2012
通知与总信息
美国船级社
根据纽约州立法机构的法规,创建于1862年
版本 2011 美国船级社 美国TX 77060
休斯顿16855北蔡氏马路 ABS 广场
目 录
通知和总信息 ............................................................................................................................ 1
介绍 .................................................................................................................................... 1
表1 2012版规范中手册的适用版本 ............................................................................ 1 表 2 规范的分割和编号 ............................................................................................... 1 规范变更通知 (2012) .......................................................................................................... 2
表3 2008版规范变更汇总 .......................................................................................... 2 表4 2008版和2012版规范编号系统对比 ................................................................ 25
ii ABS海上移动平台入级与建造规范·2012
通知与总信息
通知和总信息
介绍
1.2012版的海上移动钻井平台建造和入级规范是由表1中的9本小册子组成。该规范被重新编制
过,增加了第六部分设备和机械鉴定。前面版本的第六部分目前与建造和测试中的测量共同归入第七部分。交叉参考表4显示了2008规范和2012规范编号的关系。
ABS规范第一部分-海上平台和结构的入级用于反映第一部分的扩展,作为分级的综合要求适用于
各种类型的海上平台,管道,立管,及其他海上结构,如在前面第一部分所指定的。
ABS规范第二部分-材料和焊接用于强调普遍的使用于ABS入级的船只、其他海上结构和相关的机构。由此组成第二部分,适用于ABS的各种规范和指南。 2.本规范适用的编号系统如表2
3.2008版的主要变更如表3所列。除非特别注明,指定的规则生效日期为2012年1月1日。
4.自1993年以来每个技术变更的生效日期在每一段尾部的括号中显示。除非有一个特定的日期和月份显示,括号内年均指有效日期;
(2000) 2000年1月1日后 (以及后续年) (1996) 1996年5月9日 (1999) 1999年5月12日 (1995) 1995年5月15日 (1998) 1998年5月13日 (1994) 1994年5月9日 (1997) 1997年5月19日 (1993) 1993年5月11日
5.除非下一版的海上移动钻井平台的建造和入级规范出版了,规范变更和/或勘误,如果有必要的话,只会发布在ABS网页– www. eagle.org –上,并可免费下载。现存的规范和指南将来的变更通知或者勘误不会以硬拷贝的形式发布。整理过的海上移动钻井平台的监造和入级规范包含的变更通知或者勘误将会使用不一样的颜色便于识别,当变更通知或者勘误出版后将会在ABS网站发布。
6.分级符号的清单可访问ABS网站www.eagle.org 进行下载
表1 2012版规范中手册的适用版本
海上平台和结构的入级条件规范(1)
入级条件(作为ABS海上平台和结构的入级条件规范的补充)(1)
第二部分: 材料和焊接规范 2012(2) 第三部分: 船体结构和设备 2012 第四部分: 机械设备和系统 2012 第五部分: 消防和安全-措施和特点 2012 第六部分: 设备和机械的认证规范 2012 第七部分: 检验 2012 *注意:1入级条件的要求包含在分开的同类ABS的入级条件规范内(第一部分)。另外指定的要求包含在这些规范的第一部分
2 本规则的最新版本将会被提及。2012年以后,本规则可以从ABS网站www.eagle.org下载,规则和指南,下载或可单独在www.eagle.org这个网站在ABS出版物网上目录上订购 通知和总信息 第一部分: 第一部分:
2012 2012(2) 2012
表 2 规范的分割和编号
分割
编号
ABS海上移动平台入级与建造规范·2012 1
通知与总信息
部分 第一部分 章 第一部分,第一章
节 1-1-1节 段(见注意点 1) 1-1-1/1 段落(见注意点 1) 1-1-1/1.1 小段 1-1-1/1.1.1
1-1-1/1.1.1(a) 条
分条 1-1-1/1.1.1(a)i) 附录 附录 1-1-A1 或者 附录 1-A1-1
注意: 规范中的编号系统使用奇数编号系统(1, 3, 5, etc.)。目的是允许将来插入偶数段落(2, 4, 6, etc.)用于避免对现存编号的重新编号以及相关的对照。可适用于规范以及相关的过程说明、检查表等。
规范变更通知 (2012) 表3 2008版规范变更汇总
生效日期2009年1月1日-显示为(2009)
部分/段落号 标题/主题 状态/备注
第一部分 海上平台和结构的入级条件规范 1-1-3/1.5.1 船式钻井平台
为了阐明接受该符号的钻井装置的类型,需要修改
从Drilling Unit到Drillship的船式钻井平台(纳入第一号通知到第一部分)
生效日期2009年6月31日-显示为(2009年7月31日)
部分/段落号 标题/主题 状态/备注
第一部分 海上平台和结构的入级条件规范 1-1-5/1 的以及其它的法规
1-1-5/5 法规
要符合有关“船舶检查和测量组织的共同准则和标
准”的第391/2009号规则的第8(1)和9号条款(纳入第二号通知到第一部分)
要符合有关“船舶检查和测量组织的共同准则和标准”的第391/2009号规则的第8(1)和9号条款(纳入第二号通知到第一部分)
生效日期2010年1月1日-显示为(2010)
部分/段落号 标题/主题 状态/备注
第一部分 海上平台和结构的入级条件规范 1-1-A2/5.9 对于产品类型认证和协议
要求的条款和条件
澄清型号认证的条款和条件(纳入第三号通知到第一部分)
生效日期2010年4月1日-显示为(2010年4月1日)
部分/段落号 标题/主题
第一部分 海上平台和结构的入级条件规范 第1-1-6节 国际船级社协会审核 1-1-8/3
通知和适用性检验
状态/备注
确保要求和国际船级社协会质量体系认证计划一
致(纳入第四号通知到第一部分)
确保要求和国际船级社协会质量体系认证计划一致(纳入第四号通知到第一部分)
生效日期2011年1月1日-显示为(2011)
部分/段落号 标题/主题
第一部分 海上平台和结构的入级条件规则
状态/备注
2 ABS海上移动平台入级与建造规范·2012
通知与总信息
1-1-3/1.9 临时系泊设备符号 定义海上移动钻井平台的临时系泊和定位系泊以澄清标志○E,○M,○P的应用,(纳入第五号通知到第一部分)
定义海上移动钻井平台的临时系泊和定位系泊以澄清标志○E,○M,○P的应用,(纳入第五号通知到第一部分)
澄清在海上平台船级符号为Restricted Service的平台的使用,基于它们的操作特性,并且核实海上移动式钻井平台规范中指定的无限航区航运的条件(纳入第五号通知到第一部分)
参考自推进式以及非自推进式装置的定义。(纳入第五号通知到第一部分)
确保计划意见书的要求和目前ABS的实际情况一致。(纳入第五号通知到第一部分)
1-1-3/1.11 定位系泊设备和系统
1-1-3/5 运营
1-1-3/25 1-1-7/7
推进机械 意见书
有效日期2011年1月1日-显示为(2011年1月1日)
部分/段落号 标题/主题
第一部分 海上平台和结构的入级条件规范 1-1-3/25 推进机械
状态/备注
提供给非自动推动式海上移动钻井平台标志:
AMS。(纳入第六号通知到第一部分)
有效日期2011年8月1日-显示为(2011年8月1日)
部分/段落号
1-1-1/5 1-1-3/1 1-1-4/9.7.5iii)
标题/主题 分级描述
检验条件下钻井平台的建造
批准的产品类型的合理使用
ABS类型批准的产品商标使用的条款和条件
状态/备注
删除可能被解释为提供保证的措辞(纳入第七号通知到第一部分)
删除可能被解释为提供保证的措辞(纳入第七号通知到第一部分)
包括按照一个ABS类型批准的制造过程制造的组件或产品的状况,并在生产场地已获得组件证书(纳入第七号通知到第一部分)
提供接受产品设计评估(PDA)的产品商标,但制造商没有产品评估(MA)。(纳入第七号通知到第一部分)
1-1-4/9.7.7
生效日期2011年9月1日-显示为(2011年9月1日)
部分/段落号 1-1-8/1.3 1-1-8/1.5 (新)
标题/主题 维修 入级中止
状态/备注
确保海上平台和结构的入级条件规范和船舶入级条件规范一致。(纳入第八号通知到第一部分) 确保海上平台和结构的入级条件规范和船舶入级条件规范一致。(纳入第八号通知到第一部分)
生效日期2012年1月1日-显示为(2012年1月1日)
部分/段落号 标题/主题
第一部分 海上平台和结构的入级条件规则 1-1-3/1.9 锚泊(临时系泊)设备 1-1-3/1.11 1-1-3/9
定位系泊设备和系统 海上设施
状态/备注
澄清锚泊(临时系泊)设备的要求和标志○E 澄清定位系泊设备和系统的要求和标志○M和○P 详细说明海上设施具有令人满意的设计评估和调
查,并且在业主指定的操作地点安装
ABS海上移动平台入级与建造规范·2012 3
通知与总信息
1-1-3/11 浮式生产装置
1-1-3/19.1 1-1-3/31 浮动设施 钻井系统
详细说明浮式装置具有令人满意的设计评估和调查,并且在业主指定的操作地点安装,并提供一个浮式装置标志,在此ABS不要求对顶部生产设备进行分级。
详细说明适用于顶部设备的标志 包括标志★CDS(N)
生效日期2009年1月1日-显示为(2009) (基于制造商和业主之间的新的建筑合同的日期)
部分/段落号 第三部分 3-1-3/5.7
状态/备注
反应厚度范围和相关缺口的扩展对普通和高强度船体钢要求的影响,在ABS材料和焊接规范的2-1-2/表格4和2-1-3/表格4。(纳入第一号通知)
缺口要求 反应厚度范围和相关缺口的扩展对普通和高强度船体
钢要求的影响,在ABS材料和焊接规范的2-1-2/表格4和2-1-3/表格4。(纳入第一号通知)
ABS普通钢和高强度钢反应厚度范围和相关缺口的扩展对普通和高强度船体材料选择标准 钢要求的影响,在ABS材料和焊接规范的2-1-2/表
格4和2-1-3/表格4。要删除过时的材料等级CS和DS。(纳入第一号通知) 机械设备和系统
无限航区航运的环境温度 根据具体指定最低的空气和海水温度确定机械所
使用的材料。(纳入第一号通知)
软管 提供在固定的氧—乙炔系统中调整软管使用的要
求。(纳入第一号通知)
非自推进式装置 澄清非自推进式装置的启动通风要求。(纳入第一
号通知)
发电机的容量 澄清应急发电机开启后(发生停电后),为了启动
推进机械必须有其它机械协同剩余的主发电机一起工作。(纳入第一号通知)
从瘫船状态开始(黑启动) 澄清一些电源假定不能获取,并且要求应该也适
用于装有应急电池的船舶(没有应急发电机)。(纳入第一号通知)
应急电源 澄清要求。(纳入第一号通知) 临时电源 确保临时电源提供的最低的应急服务要求与国际
海事组织海上移动钻井平台规则中的5.3.10一致。(纳入第一号通知)
应急柴油发动机的报警和提供钢制船只规范中4-3-2/表格1中的要求和4-保护装置 2-1/7.2中的要求的澄清。(纳入第一号通知) 谐波 确保要求与IEC612-1 中4.9.2.2一致。(纳入
第一号通知)
系统要求 澄清对两条的馈电线的要求,当任何一个馈
电线的功率耗损时需要一个报警器,当提供一个馈线电池时,应澄清一个合适的替代安排。(纳入第一号通知)
其它辅助设备 确保要求与IMO MODU中9.10.2章节一致。(纳
入第一号通知)
终端设备 确保要求与现行实践一致。(纳入第一号通知) 消防和安全-措施和特点 连接点 确保这些要求与IMO MODU规则中9.4.15章节
以及ABS实践一致。(纳入第一号通知) 标题/主题
船体结构和设备
ABS钢材等级选择标准
3-1-3/5.9.2
3-1-3/表1
第四部分 4-1-1/表格2 4-2-6/5.5.1(e) (新的) 4-2-6/9.3.3 (新的) 4-3-2/3.1.2
4-3-2/3.1.4
4-3-2/5.3 4-3-2/5.7
4-3-2/表格1 4-3-2/7.9 4-3-2/17.1.2
4-3-2/19.1.2 4-3-4/7.9.7 第五部分 5-2-2/1.3.6 (新的)
4 ABS海上移动平台入级与建造规范·2012
通知与总信息
5-2-3/1 5-3-1/9.3
固定消防系统 其它辅助设备
澄清在规则要求的范围以外安装的固定消防系统的适用标准。(纳入第一号通知)
确保这些要求与IMO MODU规则中9.10.2章节一致。(纳入第一号通知)
生效日期2009年7月1日-显示为(2009年7月1日) (基于制造商和业主之间的新的建筑合同的日期)
部分/段落号 标题/主题
第四部分 机械设备和系统 4-2-2/7.9 塑胶管的制造 4-2-2/19 4-3-3/5.17.3 (新的) 5-2-4/5.11 5-2-4/表格1
液压动力油缸 应急消防泵电缆线 固定的高膨胀泡沫系统 手提与半手提式灭火器的分类
状态/备注
允许考虑认可的塑胶管制造标准中的要求。(纳入第二号通知)
澄清这些要求,并确保它们与钢制船只规范一致。(纳入第二号通知)
确保这些要求与IMO MSC通知1120一致。(纳入第二号通知)
用于反映利用内部空气的高膨胀泡沫系统的MSC.1/Circ.1271的使用。(纳入第二号通知) 确保这些要求与IMO FSS规则中的第四章3.1.1.1一致,并删除卤化物灭火器的使用。(纳入第二号通知)
确保这些要求与IMO FSS规则中的第四章3.1.1.1一致。(纳入第二号通知)
5-2-4/表格2 手提与半手提式灭火器系统
生效日期2010年1月1日-显示为(2010) (基于制造商和业主之间的新的建造合同的日期)
部分/段落号
第三部分 3-1-1/3.1
标题/主题
船体结构和设备 自升式钻井平台
状态/备注
澄清与IMO MODU规则相一致的自升式钻井平台的定义,规则1.3.3和IACS UR D2。(纳入第三号通知)
澄清与IMO MODU规则相一致的自升式钻井平台的定义,规则1.3.4和IACS UR D2。(纳入第三号通知)
澄清这些要求仅仅适用于改善状态下的自升式钻井平台。(纳入第三号通知)
澄清深水波浪理论的附录3-1-A2的应用不局限于超过300英尺的深水,应用线形波浪理论的最小水深也依赖于波浪的高度和周期。(纳入第三号通知) 确保这些要求与IMO MODU规则中2.6.14一致。(纳入第三号通知)
澄清单根柱底部的立足点和柱子的损害程度相同,并确保这些要求与IMO MODU规则中3.5.2一致。(纳入第三号通知)
确保这些要求与国际载重线公约的规则20一致。(纳入第三号通知)
确保这些要求与国际载重线公约的规则20和IACS UILL36一致。(纳入第三号通知)
将对通风管出口关闭装置的要求纳入IACS UR P3。(纳入第三号通知)
3-1-1/3.3 柱稳式钻井平台
3-1-2/1.5.4 3-1-A2
第一段 3-2-4/5.11.5 3-3-1/7.3
波浪影响动态响应 无主题
水密撑杆 柱稳式钻井平台
第四部分 4-2-3/1.1 4-2-3/1.5 4-2-3/1.9.5
机械设备和系统
液舱通风和溢流—通则 通风管的高度和厚度 通风管出口关闭装置
ABS海上移动平台入级与建造规范·2012 5
通知与总信息
4-2-5/11 (新的) 4-2-5/13 (新的)
4-2-6/5.5.1(b)
油污染的其它的预防措施 船级符号—POT 管道材料
4-3-1/表格4 4-3-1/表格5 4-3-3/3.1.1(b)
首要基本设施 次要基本设施
设备周围有局部定压喷水消防系统或局部水雾消防系统保护的设备
需要提交的图纸和数据 应用 应用
4-3-4/1 4-3-4/3.1.1 4-3-4/7.1.1
4-3-4/13.1.1 4-3-4/表格11 (新的)
通则
附加服务需要按第4-3-4节的要求设计、建造以及检测的电气设备
消防和安全-措施和特点 无主题
设计图与技术条件—通则
将燃油舱柜的防护要求纳入MARPOL 73/78附件I规则12A的修正案中。(纳入第三号通知)
确认加强的防污规范符合海上移动钻井平台的要求。(纳入第三号通知)
确保这些要求与NFPA51,USCG 标题46 CFR56.50-103和BS 29593/ISO 9539一致。(纳入第三号通知)
纳入ABS认证的附加服务。(纳入第三号通知) 纳入ABS认证的附加服务。(纳入第三号通知) 澄清当被定压喷水消防系统或局部水雾消防系统的排放量影响时,不超过IP44的保护等级的要求,仅仅适用于满足基本设施的电设备和电子设备。(纳入第三号通知)
澄清对100kw及以上的基本机械的要求。(纳入第三号通知)
文件证明在4-3-4/表格11中指明的旋转机械的服务需要ABS证书。(纳入第三号通知)
文件证明在4-3-4/表格11中指明的电机控制器以及电机控制中心的服务需要ABS证书。(纳入第三号通知)
澄清在危险区设计使用的电缆衬垫的要求。(纳入第三号通知)
纳入ABS认证的附加服务。(纳入第三号通知)
第五部分
5-1-1/5.9 5-2-1/3.1
确保这些要求与IMO MODU规则的9.2.5一致。(纳入第三号通知)
确保应急消防泵有充足的举升能力(NPSHR vs. NPSHA)以及在有限的抽汲条件下的绩效,并且要核实在船舶的设计初期符合这些要求。(纳入第三号通知)
生效日期2011年1月1日- 显示为(2011) (基于制造商和业主之间的新的建造合同的日期)
部分/段落号 标题/主题 状态/备注
第一部分 入级条件(海上平台和结构的入级条件规范的补充) 1-1-4/1 船体和设计数据 确保提交的计划要求与当前的ABS实际一致。(纳
入第四号通知)
1-1-4/9 提交 确保提交的计划要求与当前的ABS实际一致。(纳
入第四号通知)
1-1-5/1 无主题 澄清在MODU规则中指定无限航区航运的条件,第一段落 以及使用航区细节的要求,合适的话,写入操
作手册中。要删除有Limited Service符号的参考。(纳入第四号通知)
1-1-5/1.3vi) 无主题 要删除有Limited Service符号的参考。(纳入第四
号通知) 第三部分 船体结构和设备
3-1-1/1.5 自航式平台 澄清自航式平台的定义以及澄清证实平台是自航式
或非自航式的程序。(纳入第四号通知)
3-1-1/1.7 非自航式平台 澄清自航式平台的定义以及澄清证实平台是自航式
6 ABS海上移动平台入级与建造规范·2012
通知与总信息
3-2-1/1.17 3-2-2/13 (新) 3-2-3/9 3-2-4/15 (新) 3-2-A3 (新) 3-4-1/3.3.5
疲劳分析 高强度材料
平台与桩腿的相接结构 高强度材料
局部高压区的许用应力指南 平台与桩腿的相接结构
第四部分 4-1-1/9 4-1-1/15
机械设备和系统
需要提交的图纸和数据 环境温度
4-1-1/17 包含石棉的原料
4-1-3节 4-2-2/3.1
升降和相关系统 一般要求
4-2-2/21.3 4-2-3/1.1 4-2-4/1.1 4-2-4/1.5 4-2-4/1.7
4-2-4/13.7.1(b) 4-2-5/1.1.1
连接外壳的阀门 通则 通则
舱底水直接吸口 舱底水应急吸口 控件和指示设备 舱柜
4-2-5/图1
在A类机械空间内可接受的燃油舱柜布置 溢出物
4-2-5/1.1.2
4-2-5/3.9 油舱柜的阀门
4-2-6/1.1 通则
或非自航式的程序。(纳入第四号通知) 增加水面式平台的疲劳分析。(纳入第四号通知) 引入在水密舱壁和水密平台以及液舱舱壁和液舱平台中的加强筋、横梁、纵梁以及骨架肋板中使用的高压结构钢的材料换算系数。(纳入第四号通知) 引入对桩腿导架的摩擦力影响的段落,并确保与4-1-3节一致。(纳入第四号通知)
引入在柱稳式钻井平台中的上部结构横梁和纵梁中使用的高压结构钢的材料换算系数。(纳入第四号通知)
澄清用于在结构间断点局部高压区域的有限元分析的精细网格尺寸的许用应力。(纳入第四号通知) 提供以在API RP2 SK中指定的静态方法和动态方法为基础的安全系数比率的动态分析方法的安全系数。(纳入第四号通知)
确保提交图纸的要求与目前的ABS实际一致。(纳入第四号通知)
澄清,对于无作业范围设备,海上平台应按照环境温度为0℃(32℉)或更低的情况设计。(纳入第四号通知)
确保这些要求与IMO Res.MSC.282(86)一致,采用SOLAS Reg II-1/3-5.2,2011年1月1日后禁止在所有的船和平台(包括新建和现有船)上使用含石棉的原料。(纳入第四号通知)
更新升降系统的要求,每一个升降系统特设小组由ABS和工业代表组成。(纳入第四号通知)
在固定水基或等价的情况下使用的泵,局部使用的灭火系统和洒水系统泵,都需要在制造商工厂的验船师认证。(纳入第四号通知) 确保这些要求与ABS规范一致。(纳入第四号通知)
澄清在排气管中关于关闭阀门或关闭装置的要求。(纳入第四号通知)
确保水面式平台中的小舱室可替换的船底要求与钢制船只规范一致。(纳入第四号通知) 要求舱底水直接吸口配有截止止回阀。(纳入第四号通知)
澄清对舱底水应急吸口的要求。(纳入第四号通知)对集中式镇流器控制站要求的控件和指示设备做一个全面的清单。(纳入第四号通知)
纳入IMO MSC.1/Circ.1322的要求,要求燃油舱柜的边界区域与A类机械空间共同保持在最低限度。(纳入第四号通知)
纳入IMO MSC.1/Circ.1322的要求,要求燃油舱柜的边界区域与A类机械空间共同保持在最低限度。(纳入第四号通知)
纳入IMO MSC.1/Circ.1322的要求,要求燃油舱柜的边界区域与A类机械空间共同保持在最低限度。(纳入第四号通知)
澄清保持阀门直接处于打开状态的电动、液压或气动系统的使用对提供基本或紧急设施的柴油发动机供应燃油的舱柜是不合适的。(纳入第四号通知) 删除通常处于关闭状态的阀门的远程关闭的必需品。
ABS海上移动平台入级与建造规范·2012 7
通知与总信息
4-2-6/5.5.1(a) 4-2-6/9.5 4-3-2/9.1.4
通则
启动空气保护装置 备用保护
4-3-2/9.13.5 欠压保护和欠压释放
4-3-2/15.5.4 第五部分 5-1-1/1.5
升降系统
消防和安全-措施和特点 包含石棉的原料
5-1-1/3.15 5-1-1/3.19
无主题 无主题
5-1-1/图1
管道通过A级分隔管道通过A级分隔管道通过A级分隔 无主题
管道通过B级分隔 无主题
通风管通过A级分隔 无主题
5-1-1/3.21 5-1-1/图2 (新) 5-1-1/5.23 5-1-1/图3 (新) 5-1-1/5.25
5-1-1/5.29 5-1-1/图4 (新) 5-1-1/5.41 (新) 5-2-3/9 5-3-1/9.1
无主题
通风管通过B级分隔 无主题
直升机甲板和加油设施的保护
通风机和开口
(纳入第四号通知)
澄清仅仅高压氧气和乙炔管道将会被认证为组I管道。(纳入第四号通知)
澄清气动空气电源保护装置的要求适用于启动空气直接注入气缸的情况。(纳入第四号通知)
澄清备用保险丝布置的特定要求和分级保护,并确保MODU规范与钢制船只规范一致。(纳入第四号通知)
澄清在由于低电压状况引发故障或电压故障以后,拥有欠电压保护的发动机在电压恢复正常时不能自动重启。澄清发动机要求有欠压释放的功能(纳入第四号通知)
在升降控制站和自升式平台每个桩腿的一个部位之间需要一个语音通信系统。(纳入第四号通知)
确保这些要求与IMO Res.MSC.282(86)一致,采用SOLAS Reg II-1/3-5.2,2011年1月1日后禁止在所有的船和平台(包括新建和现有船)上使用含石棉的原料。(纳入第四号通知)
澄清水密门的消防结构要求,并纳入IACS统一解释的(UI)SC156第四节中。(纳入第四号通知) 纳入SOLAS第二章-2/规则 9.3.1和9.3.3关于管道通过A级分隔管道通过A级分隔的要求中。(纳入第四号通知)
纳入SOLAS第二章-2/规则 9.3.1和9.3.3关于管道通过A级分隔管道通过A级分隔管道通过A级分隔的要求中。(纳入第四号通知)
纳入SOLAS第二章-2,规则9.3.2关于管道通过B级分隔的要求中。(纳入第四号通知)
纳入SOLAS第二章-2,规则9.3.2关于管道通过B级分隔的要求中。(纳入第四号通知)
纳入SOLAS第二章-2/规则 9.7.3的要求中。(纳入第四号通知)
纳入SOLAS第二章-2/规则 9.7.3的要求中。(纳入第四号通知)
确保这些要求与SOLAS第二章-2/9.7.2.1(以及IMO MODU规则9.3.15的草稿)一致。增加船上的厨房通风系统也可以作为备餐间服务的情况。(纳入第四号通知)
纳入SOLAS第二章-2规则 9.7.3.2的要求中。(纳入第四号通知)
纳入SOLAS第二章-2规则 9.7.3.2的要求中。(纳入第四号通知)
澄清符合IACS统一解释的SC119的空气平衡管装置的使用。(纳入第四号通知)
确保这些要求与2001年加强版本IMO MODU规则‘98中的9.11一致。(纳入第四号通知)
在发生火灾时,应该安排允许烟雾从A级火灾机舱区释放出来。纳入SOLAS 规则 II-2/8.3。(纳入第四号通知)
生效日期2012年1月1日-显示为(2012)
8 ABS海上移动平台入级与建造规范·2012
通知与总信息
(基于制造商和业主之间的新的建造合同的日期)
部分/段落号 标题/主题 状态/备注
第一部分 入级条件(作为海上平台和结构的入级条件规范的补充) 1-1-4节 需要提交的图纸和数据 1-1-5/1 无主题 1-1-5/1.3i) 无主题 第三部分 船体结构和设备
3-1-1/3.1 自升式钻井平台 3-1-1/25 作业温度 (新) 3-1-1/27 风速率和速度 (新) 3-1-1/29 关键结构区 (新) 3-1-2节 需要提交的图纸和数据 (新) 3-1-2/1 无主题 最后两个插塞
3-1-3/1.1 通则 3-1-4/1.1 通则 3-1-4/1.9 作业温度 (新) 3-1-4/5.1 通则 3-1-4/5.3 材料应用范畴 (新) 3-1-4/5.5 ABS钢材等级选择标准 3-1-4/5.7.1 通则 3-2-1/3.1 通则 3-2-2/1.3 尺寸 3-2-2/1.5 钢结构保护 3-2-2/7.1 通则 3-2-2/7.7.2 加强筋 3-2-2/7.11开口 (新) 3-2-2/11.3 救生艇平台 3-2-3/3 材料和尺寸的一般要求 3-2-3/图1 自升式钻井平台的典型等级(新) 3-2-4/1.7 材料选取 3-2-4/图1 柱稳式钻井平台的典型等级(新) 3-2-5/3 材料选取 ABS海上移动平台入级与建造规范·2012 9
移动图纸与数据清单到第3和4部分。澄清其它附
加船级符号规则和指南要求的应用。
澄清操作手册要有英文版。 澄清有关温度的术语。
确保本内容与2009IMO MODU规则中1.3.47的内
容一致。
澄清术语“作业温度”,包括一个解释图形。 澄清术语“风速率”。 澄清术语“关键结构区”。 移动提交的船体图纸和数据要求到第三部分。 要求关键结构区的维护/检验工作的基本信息,澄清温度方面的术语。 澄清在设计中使用的指定环境条件应记录在操作手
册中。
澄清这些要求并删除结构断面中提到的机械材料。 澄清用于无作业范围设备的最大作业温度 包括水面式钻井平台的材料等级的选择,澄清作业
温度的术语。
定义MODU规范中应用的三种材料的应用范围。 澄清温度方面的术语 澄清温度方面的术语 涉及水面式钻井平台的钻井船指南 增加参考到钻井船指南 澄清只有硬涂层可以保护盐水压载水舱,并建议符
合拥有可选符号CPS的船舶专用海水压载舱和散货船双舷侧处所保护涂层性能标准
增加参考到钻井船指南 澄清SM方程式的使用 为解决水密门开口的水密舱壁的强度,符合钢制船只规范3-2-9/9.9 澄清在救生船的直接载荷路径中的支撑结构的强度
要求
澄清结构组件被认为是特殊的,基本的和次要的应
用
澄清结构组件被认为是特殊的,基本的和次要的应用 澄清结构组件被认为是特殊的,基本的和次要的应
用
澄清结构组件被认为是特殊的,基本的和次要的应用 澄清结构组件被认为是特殊的,基本的和次要的应
用
通知与总信息
3-2-5/图1 (新) 3-2-5/5.1 (新) 3-2-5/5.3 (新的) 3-3-5/5.5 (新) 3-2-5/5.7 (新) 3-2-5/5.9 (新) 3-2-5/5.11 (新) 3-2-5/7 (新) 3-2-5/9 3-2-5/11 3-2-A1/1.1 3-2-A1/表格1
3-2-A1/7 3-2-A1/表格3
3-2-A1/11.3 3-2-A1/13.3 3-2-A3/1 3-3-1/3 3-3-2/1.1 3-3-2/1.3.4 3-3-2/3.1 3-3-2/3.3.1 3-3-2/3.5.1 3-3-2/3.5.2 3-3-2/3.5.3 3-3-2/3.7 3-3-2/3.9 3-3-2/5.3.1 3-3-A2/1.3 3-3-A2/7.1 3-3-A2/9 3-3-A2/表1
10 ABS表面式钻井平台的典型等级 船体尺寸和局部支撑结构 船体纵桁强度 船体结构设计和分析 疲劳分析 局部结构设计载荷
上层建筑、甲板舱和直升机甲板
动态加载方法 井筒 舱口
柱稳式平台
柱稳式钻井平台的冰区等级的选择指南 间隙 冰压力因子 设计总体冰载荷 局部尺寸
板结构 倾斜试验 通则
对空舱处理方式的备选方案 通则
完整稳性标准 自升式平台 柱稳式平台 表面型平台 倾覆力矩 风洞试验
漂浮状态下用做通道的内部开口 设计 计算程序 容许偏差 容许偏差
澄清结构组件被认为是特殊的,基本的和次要的应用
澄清船体结构设计的基本原则 澄清对纵向强度的要求 定义船体结构设计和分析的方法 澄清水面式钻井平台的疲劳分析要求
定义在分析中将用到的对船体前半部分和甲板负荷的作用载荷
澄清对上层建筑、甲板舱、直升机甲板和其它船体结构的设计要求
澄清水面式钻井平台动态加载方法的应用
澄清关于井筒船壳板的尺寸和删除井筒周围围堰条件的当前实际情况
澄清对在露天的前甲板上的小舱口的要求的应用 确保冰区等级要求与钢制船只规范中第六部分第一章的修改案一致
确保冰区等级要求与钢制船只规范中第六部分第一章的修改案一致
确保冰区等级要求与钢制船只规范中第六部分第一章的修改案一致
确保冰区等级要求与钢制船只规范中第六部分第一章的修改案一致
确保冰区等级要求与钢制船只规范中第六部分第一章的修改案一致
确保冰区等级要求与钢制船只规范中第六部分第一章的修改案一致
澄清高张力强度钢的许用应力,鉴于他们的等级 澄清如何表述倾斜试验以及空载重量检验的结果 澄清定倾中心高度的程序要求
定义参考系统,并在操作手册中增加需要解决排水的空隙
澄清给出的实例 澄清要求和应用
根据2009 IMO MODU规则3.5.6中的内容,定义有效的水密舱壁间可能被损坏的最小距离
基于有效的水密舱壁间可能被破坏的最小距离,定义对于圆柱的水平伤害程度的替代方案
根据2009 IMO MODU规则3.5.2中的内容,定义有效的水密舱壁间可能被损坏的最小距离 更新平台特定类型的术语和对应的要求
澄清测试范围和要提交的用于检测的测试程序的要求
确保这些要求与2009 IMO MODU规则3.6.5.2一致
用出自ABS规范的标准术语
用出自ABS规范的标准术语并澄清一些条款 用出自ABS规范的标准术语并澄清一些条款 更新在MODU稳定性中使用的条款
海上移动平台入级与建造规范·2012
通知与总信息
3-4-1/1 通则 对于自航式海上移动钻井平台的分级状态,要求有标志○
E 3-4-1/3 临时系泊设备 纳入并适应对于有标志○E的钢制船只规范3-5-1中的要求
3-4-1/5 定位系泊设备 参考有标志○M平台新的检验要求
3-4-1/9 锚泊和系泊设备
纳入并适应钢制船只规范3-5-1中的要求。修订以(新) 便包括关于单锚布置的段落,该布置是针对于拥有用于深水操作的DPS-2或DPS-3标志的平台 3-4-1/11 设备的质量和尺寸 纳入并适应钢制船只规范3-5-1中的要求 (新)
3-4-1/表1Cs值 纳入并适应钢制船只规范3-5-1中的要求 (新) 3-4-1/13 测试 纳入并适应钢制船只规范3-5-1中的要求 (新) 3-4-1/15 锚类型
纳入并适应钢制船只规范3-5-1中的要求 (新) 3-4-1/17 锚机支撑结构和锚链制动器 纳入并适应钢制船只规范3-5-1中的要求 (新)
3-4-1/图1 外力以及重力的方向 纳入并适应钢制船只规范3-5-1中的要求 (新) 3-4-1/图2 符号法则 纳入并适应钢制船只规范3-5-1中的要求 (新) 3-4-1/19 锚链孔管道 纳入并适应钢制船只规范3-5-1中的要求 (新) 3-4-1/表2 自航式远洋平台设备 纳入并适应钢制船只规范3-5-1中的要求
(新) 第四部分 机械设备和系统
4-1-1/1 入级要求 定义关于设备,机械设备和系统的海上移动钻井平(新) 台的几个部分的范围
4-1-1/1.1.1 通则
详细的说明一般钻井设备的设计和结构不受船级要(新) 求的,如果它们符合公认的标准
4-1-1/1.1.2 平台安全的基本系统 确定安全系统和设备被审查和检验,如果它们位于(新) 钻井区域或是与钻井系统和设备有关区域
4-1-1/1.1.3 参考文献 提供参考到其它适用的要求或与钻井系统和设备相(新) 关的要求
4-1-1/3 定义 包括在第四部分中使用术语的定义
(新) 4-1-1/5 机构计划
增加根据钢制船只规范和其它ABS规范和指南的(新) 机构计划提交的基本资料 4-1-1/7.1 倾斜角度
澄清对倾斜角度要求的应用 4-1-1/表2 无作业范围平台上机澄清温度术语
械,设备和装置的环境温度 4-1-1/7.13 井口测试系统 澄清安装在海上移动钻井船上的临时和永久井口测(新) 试系统要求的应用 4-1-1/表3 首要基本设施 澄清温度术语
4-1-1/表4 次要基本设施 确保首要和次要基本设施与4-1-1/3.5中介绍的新的定义一致
4-1-2/1 原动机 澄清根据4-3-4/3和钢制船只规范中原动机认证的(新) 要求
4-1-2/3 无主题
详细说明对于没有CDS标志的钻井平台,只用于第一段落
钻井操作的内燃机不需要认可的标志,同时也不需要在制造厂进行检查
ABS海上移动平台入级与建造规范·2012 11
通知与总信息
4-1-2/3.9 4-1-2/9 (新) 4-1-2/11 (新) 4-2-1/3 (新) 4-2-1/5 4-2-1/7.1 4-2-1/11.7.1 4-2-1/11.7.2(b) 4-2-1/11.7.3
4-2-1/11.9 (新) 4-2-1/11.11 (新)
4-2-1/11.13 (新)
4-2-1/11.29
4-2-1/11.33.2 4-2-2/3 (新) 4-2-2/5.1 4-2-2/5.7.1
4-2-2/5.9 4-2-2/表1 4-2-2/7.5.1 4-2-2/7.5.4 4-2-2/7.7.1 4-2-2/7.9 4-2-2/7.13.4(b) 4-2-2/7.15.4(b) 4-2-2/9.3
4-2-2/11.1 12 ABS调速器控制 电气机械和设备 机械设备的认证 定义 管道系统级别 计划 循环水系统 无主题 防火性能测试
金属波纹型伸缩接头
管接头 机械接头 软管
锅炉底板 管道组件认证 钢管
设计压力和最小厚度
设计压力和厚度-供选择的事项
管系许用应力值 S 内部压力 温度 撑杆
塑胶管的制造 无主题 无主题 结构
通则
参考在6-1-3节中对原动机发电机调速器的操作要求
澄清对电气机械和设备的位置要求 澄清对机械设备的认证的位置要求
增加适用于管道系统的定义,并协调压力和温度的定义与更新的整个内容
更新组I和II管系为其它ABS规范中使用的I、II和III级管道
更新组I和II管系为其它ABS规范中使用的I、II和III级管道
澄清根据钢制船只规范,模塑的伸缩接头只有在III级海水管道系统中允许使用
澄清最大的工作压力而不是最大的允许工作压力,要比爆破试验决定的伸缩接头的设计压力要小
澄清最大的作业压力意味着系统最大的工作压力,且ISO 150和151可以用于该测试,如果标准相同的话
增加对金属波纹型伸缩接头的要求,根据钢制船只规范
增加对管接头的要求,根据钢制船只规范 增加对机械接头的要求,根据钢制船只规范 确保这些要求与钢制船只规范一致,并澄清ISO 150和ISO 151可以用于该测试,如果标准相同的话
当IACS不再使用有关(UR F35.2.1.4.2)的原始IACS要求时,确保这些要求与工厂实际一致 澄清管道组件认证的位置要求
更新组I和II管系为其它ABS规范中使用的I、II和III级管道
澄清方程决定了在4-2-1/3.7中定义的设计压力,以及实际的工作压力是在4-2-1/3.19中定义的实际最大工作压力
澄清方程决定4-2-1/3.17中定义的设计压力 澄清温度术语
使用在4-2-1/3.19中规定的术语 澄清温度术语 澄清温度术语
使用在4-2-1/3.17中规定的术语 使用在4-2-1/3.17中规定的术语 使用在4-2-1/3.17中规定的术语
更新组I和II管系为其它ABS规范中使用的I、II和III级管道,并澄清最大压力是最大工作压力的意思
更新组I和II管系为其它ABS规范中使用的I、II和III级管道,并澄清压力和温度术语
海上移动平台入级与建造规范·2012
通知与总信息
4-2-2/15 法兰
4-2-2/19.1 通则
4-2-2/19.3 不符合公认的标准 4-2-2/19.11 免除
4-2-2/21.3 外壳的阀门连接
4-2-3/1.9.3 燃油舱柜和润滑舱柜的防护 4-2-4/1.1 通则
4-2-4/5.5 集合管、旋塞和阀门 4-2-4/9.1.2 分支管路 4-2-3/13.5.2 泵的性能 4-2-3/13.7.1控制和指示设备 (b)
4-2-3/13.7.3拆分
(c)
4-2-3/13.7.4 阀门位置指示系统 4-2-5/1.1.4 服务和沉淀舱柜 4-2-5/9.1.3 无主题 4-2-6/3.1
通则
4-2-6/3.17 高压液压机构的分离 4-2-6/5.5.1 通则
4-2-6/5.5.2 压力安全装置
4-2-6/25 改善状态下自升式平台的原(新) 水系统
4-3-1/5 需要提交的图纸和数据 4-3-2/5.1.1 基本要求 4-2-3/5.1.2 边界 4-3-2/5.3 应急供电 第一段落 4-3-无主题 2/5.3.1(f) 4-3-无主题 2/5.3.1(h) 4-3-2/5.3.3 海上结构物标志 4-3-2/5.5.1
通则
4-3-2/5.5.2 发电机
4-3-3/1.5 危险区域电器装置 4-3-3/3.5.4 甲板下电动机 4-3-3/9.1.1 通则 4-3-3/9.1.2
电器装置
ABS海上移动平台入级与建造规范·2012 13
更新组I和II管系为其它ABS规范中使用的I、II和III级管道
使用在4-2-1/3.17中规定的术语 使用在4-2-1/3.17中规定的术语
当液压动力油缸不在分级范围内时,澄清符合规范要求的免除, 澄清要求
确保这些要求与2009 IMO MODU规则4.8.5一致 澄清相对较小舱室的定义
确保这些要求与2009 IMO MODU规则一致 调整相对较小舱室的相关要求
确保这些要求与2009 IMO MODU规则4.10.4一致
确保这些要求与2009 IMO MODU规则4.10.4一致
确保这些要求与2009 IMO MODU规则一致,避免混淆泵或泵送控制系统是否要与电力系统断开
确保这些要求与2009 IMO MODU规则4.10.17一致
确保这些要求与2009 IMO MODU规则4.8.6一致 定义在原动机的紧急服务中,低闪点燃油的使用条件
更新组I和II管系为其它ABS规范中使用的I、II和III级管道,并澄清对于符合液压系统规范的免除,该系统不在分级范围内
使用在4-2-1/3.17中定义的术语
更新组I和II管系为其它ABS规范中使用的I、II和III级管道
使用在4-2-1/3.17中定义的术语
增加改善状态下自升式平台的原水系统的要求,以目前的ABS实际为基础
增加参考到危险区域的新段落
澄清对于应急发电机辅助系统的安排
确保这些要求与2009 IMO MODU规则5.4.3一致 确保这些要求与钢制船只规范4-8-2/5.5一致 确保这些要求与2009 IMO MODU规则5.4.6.1.8一致
确保这些要求与2009 IMO MODU规则5.4.6.1.8一致
确保这些要求与2009 IMO MODU规则5.4.6.3一致
澄清在这一段落中涉及的倾斜角度是处于静止条件下,并在4-1-1/7.1中定义的最小倾斜角也适用于这种情况
澄清对应急发电机辅助系统的安排以及对低闪点燃料的使用
增加参考到危险区定义
澄清安装在甲板之下的电动机位置的适应性需要现场的验船师验证
确保这些要求与2009 IMO MODU规则6.6.1和6.6.2一致
除了认证的电器装置,确保这些要求与2009 IMO
通知与总信息
4-3-3/9.1.3 (新)
4-3-3/表格1 4-3-4/5 (新)
4-3-5/3.17.3 (新) 4-3-5/7.1.1 (新) 4-3-6/1.1 4-3-6/5.1 4-3-6/5.3vi) (新) 4-3-6/5.5vi) 4-3-6/7.1i) 4-3-6/7.5i) 4-3-6/7.7 (新) 4-3-6/7.9 (新) 4-3-6/9.3 4-3-6/11
分组和温度等级 最低防护等级 系统的计算机 机械和设备的冷却系统 与动力定位系统相关的机械设备 危险区域
包括0类危险区域 无主题
MODU规则6.6.3和6.6.4一致,而不是4-3-3/9.1.2(b)中列举的类型,需要特殊的考虑
确保这些要求与2009 IMO MODU规则6.6.5、6.6.6和6.6.7一致
澄清远程关闭要求的防护程度和水密门的检测,当电器装置在最坏的损坏线以下时
确保这些要求与钢制船只规范4-8-3/15一致 参考6-1-7节中的冷却系统要求
确保这些要求与2009 IMO MODU规则6.5.2一致 确保这些要求与2009 IMO MODU规则6.1一致 确保这些要求与2009 IMO MODU规则6.2.2一致 确保这些要求与2009 IMO MODU规则6.2.3一致
无主题 无主题 无主题 排风警报 制动装置 危险区域通风 危险区的机械设备
确保这些要求与2009 IMO MODU规则6.2.4一致 确保这些要求与2009 IMO MODU规则6.3.1.1一致
确保这些要求与2009 IMO MODU规则6.3.1.3一致
澄清基于IEC 60092-502的和危险区域相关的排风警报的要求
确保这些要求与2009 IMO MODU规则6.3.3一致 确保这些要求与2009 IMO MODU规则6.4.1一致 澄清这些要求。增加对在危险区的电器装置和线路要求的参考。增加要求安全设施的段落,以防止由于通过通风口吸入可燃气体而使内燃机超速转。基于API RP 505确定的大量气体的潜在释放距离为15米(50英尺),相当于装载终端的情况
提供接受新颖设计的备用方法,符合2009 IMO MODU规则9.1的内容
参考FTP规则和SOLAS公约,符合2009 IMO MODU规则9.2.3的内容
确保这些要求与2009 IMO MODU规则中表格9-1和9-2一致。在5-1-1/表格1中的注解3扩展到同类和同目的相邻空间之间的舱+壁的情况
确保这些要求与2009 IMO MODU规则中表格9-1和9-2一致
确保这些要求与2009 IMO MODU规则中9.2.7一致
确保这些要求与2009 IMO MODU规则中9.2.10和9.3.5一致
确保这些要求与2009 IMO MODU规则中9.3.1一致
确保这些要求与2009 IMO MODU规则中9.3.2一致
确保这些要求与2009 IMO MODU规则中9.3.3一
第五部分 5-1-1/1.7 (新) 5-1-1/3.5 (新) 5-1-1/表1
消防和安全-措施和特点 备用设计和布置
结构的详细信息、材料和方法
船舱壁分隔相邻空间的整体防火
甲板分隔相邻空间的整体防火
无主题 无主题
5-1-1/表2 5-1-1/3.13 5-1-1/3.17vi) (新) 5-1-1/5.1 (新) 5-1-1/5.3 (新) 5-1-1/5.5
无主题 无主题 无主题
14 ABS海上移动平台入级与建造规范·2012
通知与总信息
5-1-1/5.7 无主题 5-1-1/5.9 无主题 5-1-1/5.11 无主题 5-1-1/5.19 无主题 5-1-1/5.21 无主题 5-1-1/5.23 无主题 5-1-1/5.27ii) 无主题 5-1-1/5.27 无主题
最后一段 5-1-1/图3 通风管通过A级分隔 5-1-1/5.29 无主题 5-1-1/5.29.1 无主题 5-1-1/5.37 无主题 5-1-1/5.47 无主题 5-2-2/1.1.1 泵的数量 5-2-2/1.5.2 软管 5-2-4/1.1
灭火器
5-2-4/3.1 编号 5-2-4/3.3ii) 无主题 5-2-4/3.5 气缸的充气
(新) 5-2-4/表1
手提与半手提式灭火器的分类
5-2-4/表2
手提式灭火器与半手提式灭火系统
5-2-5/1.1 探火和报警系统 5-2-5/3.1 硫化氢探测和报警 (新) 5-3-1/1.1.4 无主题 (新) 5-3-1/1.3.1 无主题 5-3-1/1.3.2 无主题 5-3-1/1.11 无主题
(新)
ABS海上移动平台入级与建造规范·2012 15
致
澄清梯级的材料要求
确保这些要求与2009 IMO MODU规则中9.2.10和9.3.5一致
澄清封闭式气腔不能在一个甲板和下一个甲板之间自由连接
确保这些要求与2009 IMO MODU规则9.3.10一致
确保这些要求与2009 IMO MODU规则9.3.11一致确保这些要求与2009 IMO MODU规则9.3.12一致
确保这些要求与2009 IMO MODU规则9.3.14.2一致
澄清钢板套管的最小厚度和符合甲板的布置 澄清手动气阀可能是代替必备自动气阀的一个选择 确保这些要求与2009 IMO MODU规则9.3.15一致
澄清除了船上储藏室,与船上厨房相关的其它空间,应符合相同的要求
这些要求应用于所有的船上厨房排气通风管道,并澄清防火闸的布置要求以便准备的消防工具有效 澄清空气平衡管道的可接受状态
自升式钻井平台中的原水系统的新要求也适用于消防水管系统
确保软管的长度要求与钢制船只规范一致
澄清对手提式灭火器的要求,作为入级的最低标准,由于船旗主管机构的特殊要求或船上的火灾危险区,使其可能不符合IMO MODU规则
确保这些要求与2009 IMO MODU规则中9.13.3一致
确保这些要求与2009 IMO MODU规则中9.13.2一致
确保这些要求与2009 IMO MODU规则中9.14一致
确保这些要与2009 IMO MODU规则中表格9-3和2009版的IMO MODU规则中9.9.1所指的MSC.1/Circ.1275的内容一致
确保这些要与 2009 IMO MODU规则中表格9-3以及2009 IMO MODU规则中9.9.1所指的MSC.1/Circ.1275的内容一致
确保这些要求与2009 IMO MODU规则9.10.1一致
确保这些要求与2009 IMO MODU规则9.12一致 确保这些要求与2009 IMO MODU规则9.4.1.4一致
确保这些要求与2009 IMO MODU规则9.4.2.1一致
确保这些要求与2009 IMO MODU规则9.4.2.2一致
根据FSS规则中的13.3中的内容,定义对楼梯和走廊作为逃生路线的要求
通知与总信息
5-3-1/1.13 (新) 5-3-1/3
附录5-3-A1 (新) 第六部分 6-1-1/1.3.1 6-1-1/1.3.2 6-1-1/3.1 6-1-1/3.3 (新) 6-1-1/3.5 (新) 6-1-1/3.7 (新) 6-1-1/3.9 (新) 6-1-1/5 (新) 6-1-1/7 (新) 6-1-11/9 (新) 6-1-1/11 (新) 6-1-2/1 (新) 6-1-2/3.1 (新) 6-1-2/3.3 (新)
6-1-2/3.5 (新)
6-1-2/5 (新) 6-1-2/7 (新) 6-1-2/9.1 (新) 6-1-2/9.3 (新) 6-1-2/9.5 (新) 6-1-3/3.1.3 (新)
16 ABS无主题
入口和出口方法
纤维增强塑料(FRP)格栅 材料,船用设备和机械认证 CDS标志(可选) 没有CDS标志的钻井平台 基本要求 指定要求 倾斜角度 环境温度 环境温度
设备和机械的设计审查和检验
原型试验 型式批准程序 制造商的保证 通则 船壳板和形钢
用作自升式钻井平台桩腿的专门或主要应用结构的无缝钢管和新型铸铁节点 用作自升式钻井平台桩腿的次要应用结构的无缝钢管
基础结构材料 直升甲板结构 通则 滑动水密门 坚固水密门 热表面
澄清逃生路线和召集站材料的要求 澄清要求
提供纤维增强塑料(FRP)格栅接受的要求
在拥有CDS标志的平台中的钻井设备和系统的CDS认证指南
澄清没有CDS标志的平台中的钻井系统中设备和组件的检验
改编该文本使其仅适用于生产平台的认证,并澄清基于目前实际情况的要求
列举第六部分第一章以及相关章节包含的产品 突出在4-1-1/7.1中显示的倾斜角度的要求也适用于供应商的机械设备。
突出在4-1-1/7.7中显示的环境温度的要求也适用于供应商的机械设备。
介绍产品垫木的认证要求,与浮式生产装置的要求类似
介绍产品认证的一般要求,特别是澄清平台设备认证检验要求的一般范围 介绍并澄清原型试验的要求
提供补充批准程序管理过程的最少信息 澄清制造商的责任
介绍并澄清材料认证的要求对第二部分的补充 强调结构壳板和型钢要由ABS批准的工厂生产,并在验船师参与该生产的情况下进行认证
澄清用作自升式塔钻的桩腿结构的主要部分(格架桩腿外部管状组件)的无缝钢管组件将会被等同于一个结构板,并需要ABS批准的工厂生产和现场验船师的认证
澄清用作自升式塔钻的桩腿结构的次要部分(格架桩腿外部管状组件)的无缝钢管组件将会被等同于一个结构板,并需要ABS批准的工厂生产和现场验船师的认证
澄清基础结构材料的验收要求 澄清直升甲板结构材料的验收要求
确保水密门的要求与钢制船只规范的3-2-9/9.11和2009 IMO MODU规则3.6.3一致
澄清滑动水密门的认证要求,并确保这些要求与3-2-1/9.11一致
澄清坚固水密门的认证要求
纳入关于高压输油线的新要求,并符合2009 IMO MODU规则4.8.7.2和4.8.7.3中的内容
海上移动平台入级与建造规范·2012
通知与总信息
6-1-3/3.9 参考文献 提供关于内燃机在这些规则中其他章节对于主要要(新) 求的参考
6-1-3/5 检验和证书 对检验和证书的要求进行说明 (新) 6-1-4/5 检验和证书 对检验和证书的要求进行说明 (新) 6-1-5/1.1 应用
澄清符合钢制船只规则要求的应用 (新) 6-1-5/1.3 锅炉和压力容器的分组 根据钢制船只规范在表格中使用的指定分组 (新) 6-1-5/3 组I的锅炉、加热器、压力提供参考到关于材料测试的第二部分 (新) 容器和热交换器的材料 6-1-5/5 检验和证书 提供检验和证书要求的解释
(新) 6-1-6/3 管道
根据钢制船只规范和当前实际情况,对管道提供详(新) 细的要求
6-1-6/5 管道组件而不是管道 根据钢制船只规范和当前实际情况,对管道组件而(新) 不是管道提供详细的要求
6-1-6/7 检验和证书
对检验和证书要求提供一个解释
(新) 6-1-7/3.1 100KW及以上的旋转机械 删除4-3-4/表格11以后,参考关于附加可选符号的服务
6-1-7/3.3 配电盘、配电箱、控制器等 删除4-3-4/表格11以后,参考关于附加可选符号的服务
6-1-7/5.1.1 应用 删除4-3-4/表格11以后,参考关于附加可选符号的服务
6-1-7/5.9.1
额定温度
把“日常”改成“额定”,作为一个工厂更常用的术语。澄清绝缘材料温度上升到180℃(356℉)以上的要求
6-1-7/5.13 润滑油
涉及船型平台润滑油的要求 6-1-7/5.15 原动力发电机的操作和限速涉及原动力发电机的限速要求
(新) 器 6-1-7/9.1.1 应用 删除4-3-4/表格11以后,参考关于附加可选符号的服务
6-1-接地 增加有关三线制双电压直流系统接地要求的参考 7/9.1.2(f) 6-1-7/11.3 额定温度
澄清绝缘材料温度上升到180℃(356℉)以上使的要求
6-1-7/17.3.5 推进系统的半导体转换器 增加半导体转换器电路保护的参考 6-1-7/19 检验和证书
提供检验和证书要求的解释
(新) 6-1-8节 消防和安全——设备和系统 提供消防和安全设备和系统的认证要求
(新) 6-1-9/3.11 特定的作业温度 澄清温度术语
轴承
澄清温度术语 6-1-9/13.5 柔性冲击垫 澄清温度术语
6-1-9/25 检验和证书
巩固所有的有关检验和测试的要求,并澄清验船师的参加情况
6-1-10节 锚泊系统——标志提供锚泊系统的认证要求
(新)
○E
标题后圆括号内的参考日期代表要求生效日期[例如6-2-1/3 “定义” (2010)适用于在2010年1月1日后的船只测量]
ABS海上移动平台入级与建造规范·2012 17
通知与总信息
生效日期2010年1月1日-显示为(2010)
部分/段落号 第六部分 6-1-1 (新) 6-1-2/9.1 6-1-2/23.1
6-2-1/1
(新) 6-2-1/3 6-2-1/13 6-2-1/15 6-2-2 (新)
6-2-3/1 6-2-4/1.1.9 (新) 6-2-4/1.3 6-2-4/1.5 6-2-4/3 6-2-4/3.5 (新) 6-2-4/3.7 (新) 6-2-4/3.9 (新) 6-2-4/5 (新) 6-2-5/1.1.9 6-2-5/1.5.6 6-2-5/3.5
6-2-5/5 6-2-5/7 (新的)
18 ABS标题/主题 检验 通则
应用 应用
应用 定义
不完工检验 搁置与恢复使用 检验间隔
特殊检验 无主题
腐蚀控制系统
负荷线的变更和位置
年度检验——机械和电气系统
预防维护技术 大修中的检查 短时间间隔的检查 推进器和动力定位系统 无主题 无主题 半潜式平台
特殊周期检验——机械 特殊周期检验——电气设备
状态/备注
在供应商的工厂和建造商的工厂的施工/建造过程中,为原始船级改善大纲ABS中对检验的一般要求。(纳入第三号通知)
用文件说明在4-3-4/表格11中所指的旋转机械的作业需要ABS认证。(纳入第三号通知)
用文件说明在4-3-4/表格11中所指的配电盘、电机控制器和电机控制中心的作业需要ABS认证。(纳入第三号通知)
确保MODU规则与钢制船只规范一致。(纳入第三号通知)
澄清这些定义。(纳入第三号通知)
确保MODU规则与钢制船只规范一致。(纳入第三号通知)
确保MODU规则与钢制船只规范一致。(纳入第三号通知)
确保MODU规则与钢制船只规范一致,澄清这个间隔适用于无作业范围的海上移动钻**台的入级,与在五大湖作业的海上移动钻**台的操作不同。(纳入第三号通知)
澄清计划的文件需要现场验船师的审查,而不是ABS总公司。(纳入第三号通知)
提供关于在船体年度检验期间如何处理“严重腐蚀”的特殊要求。(纳入第三号通知) 澄清年度检验的强制要求。(纳入第三号通知) 澄清年度检验的强制要求。(纳入第三号通知) 澄清对机械和电气系统年度检验的强制要求。(纳入第三号通知)
纳入预防维护技术的要求。(纳入第三号通知) 纳入大修中的检查的要求。(纳入第三号通知) 纳入短时间间隔的检查的要求。(纳入第三号通知)
纳入推进器和动力定位系统的要求。(纳入第三号通知)
提供关于在特殊周期检验——船体期间如何处理“严重腐蚀”的特殊要求。(纳入第三号通知) 澄清罐/垫需要内部和外部的检查。(纳入第三号通知)
澄清在SPS期间需要密切的外观检查和无损检测,不是每一个DD/UWILL,并且对于使用年限(> SPS的#3)超过15年的钻探设备的无损检测要求应该进行更广泛的密切的外观检查和无损检测。要澄清,保持记录是强制的,但是使用手册不是。(纳入第三号通知) 澄清机械SPS的强制要求。(纳入第三号通知) 澄清电气设备SPS的强制要求。(纳入第三号通
海上移动平台入级与建造规范·2012
通知与总信息
知)
6-2-5/9 特殊周期检验——特殊功能澄清特殊功能SPS的强制要求。(纳入第三号通(所有类型)
知)
6-2-5/11 推进器和动态定位系统 澄清推进器和动态定位系统的要求。(纳入第三号通知)
6-2-5/13 拥有可收回推进器的平台 澄清ABS同意免除可收回的推进器的内部检查。(纳入第三号通知)
6-2-6/1.3
自升式平台
澄清在UWILD期间进行密切的外观检查和无损检测的条款,并且引进一个新的通知,该通知陈述推迟水下检验到下一次钻井船移位的条件。(纳入第三号通知)
6-2-6/1.9.3 推进装置的外部部分 澄清推进装置的外部部分的检验适用于所有平台。(纳入第三号通知) 6-2-无主题 包括对风雨密门的验证。(纳入第三号通知) A1/3.3.2v) 6-2-无主题
删除对无线电设备的要求,并包括对直升机甲板的A1/3.3.2x)
验证。(纳入第三号通知)
生效日期2011年1月1日-显示为(2011)
部分/段落号
标题/主题 状态/备注 第六部分 调查
6-2-5/9.15
自升式钻井平台——桩腿升澄清升降系统的强制性检验要求。(纳入第四号通降系统
知)
生效日期2012年1月1日-显示为(2012)
部分/段落号 标题/主题 状态/备注 第七部分 检验
7-1-1/1 通则
强调将做的令验船师满意的后续章节的要求 7-1-1/5 证书与船级
解释钻井平台原始船级证书的发布及其有效性
7-1-2/3 船体结构和配备的检验 解释船体结构和配备所要求的主要检验和检测项目 7-1-2/5 材料
再次强调,材料的可追溯性和选择性需要验船师的(新) 验证,并且第三部分用于对各种类型的钻井平台的不同结构类别应用情况的参照 7-1-2/11 无损检测(NDT) 包括新定义的无损检测要求
7-1-2/11 无损检测(NDT)
澄清无损检测计划需要验船师的验证,而不是ABS第二段落 技术处,必须在无损检测开始之前被接受,并且,(新) 如果认为必要的话,验船师可以目睹无损检测
7-1-2/11.5 水面式钻井平台的无损检测
包括钻井船和对进行测量的区域相匹配的0.6L以(新) 内特殊无损检测的要求,当船建造完以后进行调查时
7-1-1/11.9 无损检测人员和记录 澄清无损检测部门的目标,无损检测人员的最低无(新) 损检测资格,以及记录的维护
7-1-2/表1 钢结构焊缝的无损检测定义每一种结构类型的组件所需要的无损检测范围(新) (NDT)
和类型
7-1-2/13.1 保护涂层性能标准解释在可选船级服务和与在钻井平台上的压载水舱(PSPC) 有关的新IMO的要求的不同 7-1-2/15 载重线检验
介绍获得载重线认证的步骤 7-1-2/17.1 自升式平台的损坏条件
定义自升式平台承担假定损害
(新)
ABS海上移动平台入级与建造规范·2012 19
通知与总信息
7-1-2/图1 (新) 7-1-2/17.3 (新) 7-1-2/图2 (新) 7-1-2/17.5 (新) 7-1-2/图3 (新) 7-1-2/23.3 7-1-2/23.9 7-1-2/23.11 7-1-2/23.13 7-1-2/27 (新) 7-1-3/3 (新) 7-1-3/5.1 (新) 7-1-3/5.5 (新) 7-1-3/5.7 (新) 7-1-3/7 (新) 7-1-3/9 (新) 7-1-3/11 (新) 7-1-3/13 (新) 7-1-3/15 (新) 7-1-3/17 (新) 7-1-3/19 (新) 7-1-3/21 (新) 7-1-3/23 第一段落 7-1-3/25 第一段落 (新) 7-1-3/27 第一段落 (新) 7-1-3/29 第一段落 (新) 7-1-4/3 (新)
20 ABS自升式平台的损坏条件 半潜式平台的损坏条件 半潜式平台的损坏条件 水面式钻井平台 水面式平台的损害条件 水密边界,油罐和滑动门检测
气密试验
软管测试 注水试验
船体检查和保养程序(HIMP)(可选择的)
机械,管道,压力容器和其他舾装件的检验 材料测试和检测 机械最小倾角 机械环境温度 内燃机 管道 管道安装细节 金属和塑料管道 阀门 管道配件 法兰 液压缸
海水进水阀及排出阀 水面式和自升式钻井平台的排水孔和排水管 船体外部的冷却装置
通过水密边界的渗透 平台升降和相关系统
定义自升式平台承担假定损害 定义半潜式平台承担假定损害 定义半潜式平台承担假定损害 定义水面式平台承担假定损害 定义水面式平台承担假定损害
澄清水密滑动门的检测如何进行测试和验收 澄清如何进行气密试验的程序,并保持试验期间的安全,同时替代的试验必须经验船师同意 澄清在什么位置可以允许使用替代的测试程序 澄清在哪里需要进行注水试验和替换试验 突出ABS的船体检查和维护程序的存在
要求建造者有一个包括建造、检测以及实验的所有阶段的质量控制方案
澄清材料测试和检测的参考文献 提醒验船师对倾角的 提醒验船师对环境温度的
突出符合这些规则第六部分的经认证的发动机安装以后,主项目被验证
突出符合主项目的安装在船上的管道
提供在管道系统检验过程中需要验证的项目清单 描述符合4-2-2/5和4-2-2/7验证的检验要求 描述符合4-2-2/9的验船师的验证 描述符合4-2-2/11的验船师的验证 描述符合4-2-2/15的验船师的验证 描述符合4-2-2/19的验船师的验证 澄清所有的进水阀及排出阀都要进行检测 澄清在船体下水之前最好进行试验
澄清冷却装置需要进行试验
澄清水密边界需要进行试验
澄清经验证的平台升降系统需要在安装和投入平台升降实验之前进行检验
海上移动平台入级与建造规范·2012
通知与总信息
7-1-4/5 液舱通风和溢流 (新) 7-1-4/5.1
累进进水需要注意的事项
7-1-4/7 测深 (新) 7-1-4/9 舱底系统 (新) 7-1-4/11 压载系统 (新) 7-1-4/13 燃油系统 (新) 7-1-4/15 低燃点燃油 (新) 7-1-4/17 润滑油系统 (新)
7-1-4/41.1.6 高压工业管道 (新)
7-1-4/41.1.7
所有管道系统
7-1-5/5.13 甲板和舱壁穿透 7-1-6/3 主要动力源 7-1-6/9 电路保护系统 (新) 7-1-6/11 自航式平台上舵机系统 (新) 7-1-6/13 照明系统和导航灯系统
第一段落 (新) 7-1-6/13.5 障碍灯系统 (新) 7-1-6/15 内部通信系统
第一段落 (新) 7-1-6/17 手动操作报警
第一段落 (新) 7-1-6/19 消防措施和火灾探测系统
第一段落 (新) 7-1-6/21 电气系统测试
第一段落 (新)
7-1-6/21.13 扩音(PA)&一般警报(新)
(GA)系统
7-1-6/21.15 火灾和气体(F&G)探测系(新)
统
7-1-6/21.17 危险区的电气设备
(新)
7-1-6/21.19 危险区的门、通风设备和报(新)
警器
ABS海上移动平台入级与建造规范·2012 21
澄清,当检测液舱合格时,所有液舱通风和溢流都要进行检验和试验
当它们被特别的配备有通风和溢流后,在液舱/舱室的检验期间,强调验证抵抗累进进水措施的重要性,
澄清测深管需要进行是试验和试验,当检查试验液舱合格时
澄清污水系统应该进行检验和测试 澄清压载系统应该进行检验和测试 澄清燃油系统应该进行检验和测试
澄清如果使用低燃点燃油,需要证实其符合本规范4-2-5/9的内容
澄清润滑油系统应该进行检验和测试
澄清高压工业管道是入级需求而不是CDS要求 当验证钻井平台机械是正常操作时,指明在海上试航期间可以对正常运行条件下的管道进行验证
澄清电缆的穿透应该进行检验和测试
澄清所有动力源在安装后需要进行检验和测试
澄清验船师将会对本规范第四部分涉及的电路保护系统感到满意
澄清在海试开始之前,操舵装置需要一起(在坞边)进行测试
澄清在海试开始之前,所有的照明灯都要进行操作验证
澄清所有安装在井架和起重机顶部的障碍灯都要进行验证
澄清在海试开始之前,通信系统处于正常令人满意的操作状态
澄清在海试开始之前,所有的报警系统都处于令人满意的工作状态
澄清所有的消防工作都在海试开始之前已经完成,并且所有的火灾探测系统应该在海试时进行操作 澄清对整个电气系统的坞边测试应该在海试开始之前已经完成
澄清该系统在海试开始之前已经进行操作 澄清该系统在海试开始之前已经进行操作 澄清在危险区域的整个电气设备应该进行检验 澄清危险区的检验,包括危险区的门、通风设备和相关报警器的检验
通知与总信息
7-1-6/21.21 (新)
7-1-6/21.23 (新)
7-1-6/21.25 (新)
7-1-6/21.27 (新)
7-1-6/21.29 (新) 7-1-8/1.1 (新)
7-1-8/3 (新) 7-1-8/5.1.1 7-1-8/5.1.2 7-1-8/5.1.3 (新) 7-1-8/5.1.4 7-1-8/5.1.5 (新) 7-1-8/5.1.6 7-1-8/5.3 (新) 7-1-8/7.1 (新) 7-1-8/7.3 (新) 7-1-8/7.5 (新) 7-1-8/7.7 (新) 7-1-8/9.1 (新) 7-1-8/9.3 (新) 7-1-8/9.5 (新) 7-1-8/9.7 (新) 7-1-8/9.9 (新) 7-1-8/11.1 (新) 7-1-8/11.3 (新) 7-1-8/13.1 (新) 7-1-8/15.1 (新)
22 ABS泥浆池液位报警器 排风扇和开口的紧急停机 紧急停机系统 直升机甲板照明 导航和障碍灯 管理认证
消防和安全功能检验 结构材料
船舱壁与甲板的整体防火 舱壁与甲板的防火
在交叉口、接头和穿透部位的结构防火细节 视窗和侧舷窗
防火门
起居舱室,工作室及控制站的防火 防火方案 消防泵 消防水管
消防栓,水龙带,喷嘴以及国际海岸的通用接口 气体封闭系统 泡沫系统
固定的高压喷水系统 机舱内的防火 滤油器的隔离
手提式灭火器及防火砂 消防员装备 报警系统试验
硫化氢(H2S)探测和报警系统
澄清泥浆池液位报警器是入级的(而不是CDS),并且应该进行测试
澄清通风系统的紧急停车应该进行测试 澄清紧急停机系统(ESD)应该进行测试 澄清直升机照明系统应该进行证实和测试 澄清障碍灯应该进行证实和测试
澄清应该直接由船旗主管机构批准被动消防,该机构将发布海上移动钻井平台规则的安全认证,以及在这种情况下,根据本规则的第五小节,ABS验船师不要求进行消防检验
澄清对平台消防和安全功能检验的一般要求 澄清按照本规则钢必须认证,并且除了钢以外的材料需要制造商的宣誓书/认证书
澄清在装置安装前,所有的舱壁与甲板必须进行检查
补充本规则5-1-1/3.19中的设计审核要求 补充本规则5-1-1/3.13中的设计审核要求 补充本规则5-1-1/3.15中的设计审核要求 补充本规则5-1-1/3.17中的设计审核要求 补充本规则5-1-1/5中的设计审核要求 澄清怎样处理船上的防火方案
补充本规则5-2-2/1.1中的设计审核要求 补充本规则5-2-2/1.3中的设计审核要求 补充本规则5-2-2/1.5中的设计审核要求 补充本规则5-2-3/3中的设计审核要求 补充本规则5-2-3/5中的设计审核要求 补充本规则5-2-3/7中的设计审核要求 补充本规则5-2-3/9中的设计审核要求 补充本规则5-2-3/11中的设计审核要求 补充本规则5-2-4/1中的设计审核要求 补充本规则5-2-4/3中的设计审核要求 补充本规则5-2-5/1.1中的设计审核要求 补充本规则5-2-5/1.1中的设计审核要求
海上移动平台入级与建造规范·2012
通知与总信息
7-1-8/17.1 逃生方法 (新) 7-1-8/17.3 入口和出口方法 (新) 7-1-8/17.5 防护和扶手 (新) 7-1-8/17.7 紧急控制站 (新) 7-1-8/17.9 机舱内的布置 (新)
7-1-8/17.11 滤油器的隔离 (新)
7-1-8/17.13 机舱内的火灾预警 (新) 7-1-8/19.1 布置和服务 (新) 7-1-9/1 通则 (新) 7-1-9/3 稳定性试验 (新) 7-1-9/5 安全 (新) 7-1-9/7 船体结构测试 (新) 7-1-9/9.1 最初的顶升测试
(新) 7-1-9/9.3 移动式悬臂以及滑动良的测试
7-1-9/11.11 消防系统 (新)
7-1-9/11.13 主电源 (新)
7-1-9/11.15 应急电源 7-1-9/11.17 配电系统 (新)
7-1-9/11.19 电路保护系统
(新)
7-1-9/11.21 照明系统和导航灯系统 (新)
7-1-9/11.23 扩音(PA)&一般警报(新)
(GA)系统
7-1-9/11.25 消防措施和火灾探测系统 (新)
7-1-9/11.27 气体探测系统 (新) 7-1-9/15.1 锚泊/系泊系统根据 (新) 7-1-9/17 动力定位系统(DPS) (新)
附录7-1-A1 系泊设备和系统
(新)
附录7-1-A2 船载计算机稳性计算的检验 (新) 7-2-1/1.1 第二章第一节到第十节
7-2-1/3.13
检验
ABS海上移动平台入级与建造规范·2012 23
补充本规则5-2-3/1中的设计审核要求,并澄清在逃生路线中光栅的使用
补充本规则5-2-3/3中的设计审核要求 补充本规则5-2-3/5中的设计审核要求 补充本规则5-2-3/7中的设计审核要求 补充本规则5-2-3/9中的设计审核要求 补充本规则5-2-3/11中的设计审核要求 补充本规则5-2-3/15中的设计审核要求 补充本规则5-2-3/17中的设计审核要求 澄清验船师监督海试的目的
澄清按照ABS船级建造的新钻井平台都需要接受载重量检验和倾斜试验
澄清在验船师同意登上船舶监督海试以前,验船师必须确定船舶的安全性
澄清根据海试和它的验收标准进行船体测试 澄清最初的顶升测试以后的要求 澄清测试条件
澄清在海试期间,对令人满意的操作系统进行核实 澄清在海试期间,对令人满意的操作系统进行核实 澄清在海试期间,对令人满意的操作系统进行核实 澄清在海试期间,对令人满意的操作系统进行核实 澄清在海试期间,对令人满意的操作系统进行核实 澄清在海试期间,对令人满意的操作系统进行核实 澄清在海试期间,对令人满意的操作系统进行核实 澄清在海试期间,对令人满意的操作系统进行核实 澄清在海试期间,对令人满意的操作系统进行核实 包括测试锚泊/系泊系统的要求
澄清在新建工程中动力定位试验的要求
根据要求的标志,确定证实的系泊系统的最小ABS要求
提供对于按照船载计算机稳性计算执行的检验和试验要求
澄清规范/指南的应用
增加机械术语“密切外观检查(CVI)”和“一般外
通知与总信息
观检查(GVI)” 7-2-1/3.21.1 (新) 7-2-1/7.7 (新) 7-2-1/9.1 (新) 7-2-1/15.3
7-2-1/17 (新) 7-2-2/1.9.1 (新) 7-2-2/3
7-2-3/1.1 (新) 7-2-3/1.3 (新) 7-2-3/1.5.1 7-2-4/1.1.10(a) (新)
7-2-4/1.1.14 (新) 7-2-4/1.3 7-2-4/1.5 7-2-4/1.7 7-2-5/1.1.6 7-2-5/1.9 (新) 7-2-5/3.3 7-2-5/3.3iii) 7-2-5/3.3iv) 7-2-5/3.3.1
7-2-5/3.5 7-2-5/3.5.1
7-2-5/3.9 (新) 7-2-5/表1 7-2-5/表2 7-2-5/表3 7-2-5/5.3.4
24 ABS飞溅区(对自升式和半潜式平台)
规范的应用
规范的应用 在淡水中运行的平台
船上的图纸和手册
自升式钻井平台——入干坞检验间隔超过36个月 在淡水中运行的平台
UWLID计划
对水外的入干坞和特殊周期检验的计划 关键结构区
保护涂层性能标准(PSPC)
HIMP标志(可选) 水面式平台 自升式平台 半潜式平台
锚泊和系泊系统的船体附件 船载计算机稳性计算 自升式平台上的近观检验和无损检测
无主题 无主题
特殊检验3号以及后续的特殊检验
在半潜式平台上的近观检验和无损检测
特殊检验3号以及后续的特殊检验
厚度测量(计量)
水面式平台厚度测量要求 自升式平台厚度测量要求 半潜式平台厚度测量要求 舱底和压载系统,以及其他
增加飞溅区的定义
当只是对钻井平台进行维修而没有修改其设计时,澄清本规范的应用
澄清主要或次要修改,以及各自规范的应用 澄清这些要求适用于钻井平台,不是在开放的“无作业范围”海水中运行,但是在湖中或封闭水域中“有限作业范围”运行的钻井平台 澄清船上需要的文件
澄清在自升式钻井平台上进行的行为,此平台上两次入干坞的间隔超过规范要求的间隔
澄清这些要求适用于钻井平台,不是在开放的“无作业范围”海水中运行,但是在湖中或封闭水域中“有限作业范围”运行的钻井平台 澄清由谁审核UWILD计划,等
澄清由谁审核入干坞和特殊周期检验计划
澄清船上显示关键结构区域的图纸的要求,将会在前期规划会议期间作参考
强调腐蚀控制系统的要求,并要提及保护涂层性能标准
在年度检验——船体期间,要求对HIMP进行确认 澄清这是除了一般要求以外,列举在7-2-4/1.1中 澄清这是除了一般要求以外,列举在7-2-4/1.1中 澄清这是除了一般要求以外,列举在7-2-4/1.1中 正确条款要进行检查 将会与年度检验相一致
澄清要求进行100%CVI以及广泛的NDT,并且除非ABS另有要求,并不总是要求进行疲劳分析 澄清这些部位为什么要进行检查并进行无损检测 提醒桩腿——垫连接接头是“特殊”的,除非修改的设计已经导致疲劳敏感区已移动另一个位置
使这些要求在第三次特殊定期检验时而不是第三次特殊定期检验以后生效,并要澄清除非ABS另有要求,并不总是要求进行疲劳分析
澄清要求进行100%CVI以及广泛的NDT
使这些要求在第三次特殊定期检验时而不是第三次特殊定期检验以后生效,并要澄清除非ABS另有要求,并不总是要求进行疲劳分析 解释计量、耗损等的要求
确保测量要求与特殊的、主要的、次要的应用结构定义一致
增加“飞溅区”的定义 增加“飞溅区”的定义
澄清在每一个特殊的定期检验——机械中,都要对
海上移动平台入级与建造规范·2012
通知与总信息
(新) 7-2-5/5.3.5
7-2-5/7.3.6 (新) 7-2-6/1.3iii) 7-2-6/1.3iv) 7-2-6/3.7 (新) 7-2-6/3.9 (新) 7-2-7/1 7-2-7/3 (新)
附录7-2-A2 (新)
附录7-2-A3 (新)
系统
机械设备底座 蓄电池组 无主题 无主题
所有的舱底污水和压载系统进行操作测试
澄清并不是每一个机械设备底座都被ABS所关心,除非它是可疑的
确保这些要求与钢制船只规范一致
澄清这些区域为什么要进行检查并进行无损检测 提醒桩腿——垫连接接头是“特殊”的,除非修改的设计已经导致疲劳敏感区已移动另一个位置
澄清在自升式钻井平台上不完全的UWILD将被验船师如何处理
在没有完成桩靴/沉垫检查的自升式钻井平台上信任UWILD
超过五年的不完全UWILD - 当位于一个场所(没有任何钻井船移位)的自升式自升式钻井平台 钻井平台的UWILD不能在五年以内完成时,将要
求什么
海洋运输湿拖航 澄清这些要求 海洋运输干拖航 澄清对于海洋运输干拖航的要求 临时模块化装置的检验 自升式钻井平台变成特定场地的固定海上装置的修改
解释对于临时的模块化的装置,需要进行什么样的调查
澄清对改造成特定场地固定海上装置的平台,需要进行的最小数量检验
表4 2008版和2012版规范编号系统对比
标题
入级条件
在此份清单下方,参考ABS海上平台和设备的入级条件规
整部分 范(第一部分)给出“CC 1-1-X/Y.Y.Y”,而相应参考的
MODU规范的第一部分给出的是“1-1-X/Y.Y.Y”
第一部分 入级条件规则(新的第一部分) 第一部分 入级条件 第一章 范围和条件 第一节 入级 CC 1-1-1 入级 CC 1-1-1/1 程序 CC 1-1-1/1a) --- CC1-1-1/1b) --- CC1-1-1/1c) --- CC1-1-1/1d) --- CC1-1-1/3 证书和报告 CC1-1-1/3.1 --- CC1-1-1/3.3 --- CC1-1-1/3.5 --- CC1-1-1/3.7 --- CC1-1-1/5 入级陈述 CC1-1-1/7 入级范围 第一部分 入级条件 第一章 范围和条件 第二节 暂停和取消入级 CC1-1-2 暂停和取消入级 CC1-1-2/1 总则
CC1-1-2/1.1 --- CC1-1-2/1.3 --- CC1-1-2/3 检验通知 CC1-1-2/5 特殊符号 MODU 2008 第一部分
MODU 2012
第一部分和新的第一部分
CC 1-1-1 CC 1-1-1/1 CC 1-1-1/1a) CC 1-1-1/1b) CC 1-1-1/1c) CC 1-1-1/1d) CC 1-1-1/3 CC 1-1-1/3.1 CC 1-1-1/3.3 CC 1-1-1/3.5 CC 1-1-1/3.7 CC 1-1-1/5 CC 1-1-1/7
CC 1-1-2 CC 1-1-2/1
CC1-1-2/1.1 CC1-1-2/1.3 CC 1-1-2/3 CC 1-1-2/5
ABS海上移动平台入级与建造规范·2012 25
通知与总信息
CC1-1-2/7 暂停分级 CC1-1-2/7.1 --- CC1-1-2/7.3 ---
CC1-1-2/7.5 CC1-1-2/7.5i) CC1-1-2/7.5ii) CC1-1-2/7.5iii) CC1-1-2/7.7 CC1-1-2/7.9 CC1-1-2/7.11 CC1-1-2/7.11i) CC1-1-2/7.11ii) CC1-1-2/7.11iii)
CC1-1-2/7.13 CC1-1-2/7.15 CC1-1-2/7.15i) CC1-1-2/7.15ii) CC1-1-2/7.15iii) CC1-1-2/9 解除暂停 CC1-1-2/9.1 CC1-1-2/9.3 CC1-1-2/9.5 CC1-1-2/11 取消分级 CC1-1-2/11.1 CC1-1-2/11.3 CC1-1-2/11.5 CC1-1-2/13 可选程序 第一部分 入级条件 第一章 范围和条件 第三节 入级符号 CC1-1-3 入级符号 CC1-1-3/1 钻井平台的检验 CC 1-1-3/1.1 自升式钻井平台 CC1-1-3/1.3 柱稳式平台 CC1-1-3/1.5 水面式钻井平台 CC1-1-3/1.5.1 船式平台 CC1-1-3/1.5.2 驳船式钻井平台 CC1-1-3/1.7 其他类型钻井平台 CC1-1-3/1.9 临时锚泊设备符号 CC1-1-3/1.11 定位锚泊设备和系统 CC1-1-3/1.11.1 符号M CC1-1-3/1.11.2 CC1-1-3/3 CC1-1-3/5 CC1-1-3/7 CC1-1-3/9 CC1-1-3/11 CC1-1-3/13 CC1-1-3/15 CC1-1-3/17 CC1-1-3/19 CC1-1-3/19.1 CC1-1-3/19.3 CC1-1-3/21
CC 1-1-2/7 CC 1-1-2/7.1 CC 1-1-2/7.3
CC1-1-2/7.5 CC 1-1-2/7.5i) CC 1-1-2/7.5ii) CC 1-1-2/7.5iii) CC 1-1-2/7.7 CC 1-1-2/7.9 CC 1-1-2/7.11 CC 1-1-2/7.11i) CC 1-1-2/7.11ii) CC 1-1-2/7.11iii) CC1-1-2/7.3 CC1-1-2/7.15 CC1-1-2/7.15i) CC1-1-2/7.15ii) CC1-1-2/7.15iii) CC 1-1-2/9 CC 1-1-2/9.1 CC 1-1-2/9.3 CC 1-1-2/9.5 CC 1-1-2/11 CC 1-1-2/11.1 CC 1-1-2/11.3 CC 1-1-2/11.5 CC 1-1-2/13
○符号○P
CC 1-1-3
CC 1-1-3/1 CC 1-1-3/1.1 CC 1-1-3/1.3 CC 1-1-3/1.5 CC 1-1-3/1.5.1 CC 1-1-3/1.5.2 CC 1-1-3/1.7 CC1-1-3/1.9 CC1-1-3/1.11 CC1-1-3/1.11.1 CC1-1-3/1.11.2 CC 1-1-3/3 CC 1-1-3/5 CC 1-1-3/7 CC 1-1-3/9 CC 1-1-3/11 CC 1-1-3/13 CC 1-1-3/15 CC 1-1-3/17 CC 1-1-3/19 CC1-1-3/19.1 CC1-1-3/19.3 CC 1-1-3/21
特殊用途平台 服务
不检的平台建造 海上装置 浮式生产装置 救生艇
海底管道系统 海底立管系统 海上装置设施 浮动装置 固定装置 单点系泊
26 ABS海上移动平台入级与建造规范·2012
通知与总信息
CC1-1-3/23 海上液化石油气终端 CC1-1-3/25 推进机械 CC1-1-3/27 推进器 CC1-1-3/29 动力定位系统 CC1-1-3/31 钻井系统 CC1-1-3/33 抗冰加强 第一部分 入级条件 第一章 范围和条件 第四节 入级规范
入级规范 CC1-1-4
CC1-1-4/1 规范的应用 CC1-1-4/1.1 总则 CC1-1-4/1.3 应用 CC1-1-4/3 规范变更生效日期 CC1-1-4/3.1 生效日期 CC1-1-4/3.3 规范变更的执行 CC1-1-4/3.3.1 总则 CC1-1-4/3.3.2 合同建造日期 CC1-1-4/3.3.3 平台系列和可选平台 CC1-1-4/3.3.3i) CC1-1-4/3.3.3ii) CC1-1-4/3.3.4 其他的可选平台 CC1-1-4/5 其他条件 CC1-1-4/7 规范未涵盖到的安装 CC1-1-4/9 可选项 CC1-1-4/9.1 总则 CC1-1-4/9.3 国家标准 CC1-1-4/9.5 其他规范 CC1-1-4/9.7 ABS的型式批准程序 CC1-1-4/9.7.1 型式批准 CC1-1-4/9.7.2 平台证书 CC1-1-4/9.7.2i) CC1-1-4/9.7.2ii) CC1-1-4/9.7.2iii) CC1-1-4/9.7.2iv) CC1-1-4/9.7.2v) CC1-1-4/9.7.3 产品型式批准 CC1-1-4/9.7.4 管理部门批准 CC1-1-4/9.7.5 型式批准产品的应用 CC1-1-4/9.7.5) CC1-1-4/9.7.5i) CC1-1-4/9.7.5ii)
CC1-1-4/9.7.5iii) CC1-1-4/9.7.6 定义 CC1-1-4/9.7.7 使用ABS产品型式认证标志的条款和条件 CC1-1-4/9.7.7i) CC1-1-4/9.7.7ii) CC1-1-4/9.7.7iii) CC1-1-4/9.7.7iv) CC1-1-4/9.7.7v) CC1-1-4/9.7.7vi) CC1-1-4/9.7.7vii) CC1-1-4/9.7.7viii) CC1-1-4/9.7.7ix) CC1-1-4/11 新特点
CC1-1-3/23
CC1-1-3/25 CC1-1-3/27 CC1-1-3/29 CC1-1-3/31 CC1-1-3/33
CC 1-1-4 CC1-1-4/1 CC1-1-4/1.1 CC1-1-4/1.3 CC 1-1-4/3 CC 1-1-4/3.1 CC 1-1-4/3.3 CC 1-1-4/3.3.1 CC 1-1-4/3.3.2 CC 1-1-4/3.3.3 CC 1-1-4/3.3.3i) CC 1-1-4/3.3.3ii) CC 1-1-4/3.3.4 CC 1-1-4/5 CC 1-1-4/7 CC 1-1-4/9 CC 1-1-4/9.1 CC 1-1-4/9.3 CC 1-1-4/9.5 CC 1-1-4/9.7 CC 1-1-4/9.7.1 CC 1-1-4/9.7.2 CC 1-1-4/9.7.2i) CC 1-1-4/9.7.2ii) CC 1-1-4/9.7.2iii) CC 1-1-4/9.7.2iv) CC 1-1-4/9.7.2v) CC 1-1-4/9.7.3 CC 1-1-4/9.7.4 CC 1-1-4/9.7.5 CC 1-1-4/9.7.5) CC 1-1-4/9.7.5i) CC 1-1-4/9.7.5ii) CC 1-1-4/9.7.5iii) CC 1-1-4/9.7.6 CC 1-1-4/9.7.7 CC 1-1-4/9.7.7i) CC 1-1-4/9.7.7ii) CC 1-1-4/9.7.7iii) CC 1-1-4/9.7.7iv) CC 1-1-4/9.7.7v) CC 1-1-4/9.7.7vi) CC 1-1-4/9.7.7vii) CC 1-1-4/9.7.7viii) CC 1-1-4/9.7.7ix) CC 1-1-4/11
ABS海上移动平台入级与建造规范·2012 27
通知与总信息
CC1-1-4/13 第一部分 第一章 第五节 CC1-1-5 CC1-1-5/1 CC1-1-5/3 CC1-1-5/5 CC1-1-5/5.1 CC1-1-5/5.3 第一部分 第一章 第六节 CC1-1-6 第一部分 第一章 第七节 CC1-1-7 CC1-1-7/1 CC1-1-7/3 CC1-1-7/5 CC1-1-7/7 CC1-1-7/9 第一部分 第一章 第八节 CC1-1-8 CC1-1-8/1 CC1-1-8/1.1 CC1-1-8/1.3 CC1-1-8/1.5 CC1-1-8/1.7 CC1-1-8/3 CC1-1-8/5 CC1-1-8/7 第一部分 第一章 第九节 CC1-1-9 第一部分 第一章 第十节 CC1-1-10 CC1-1-10/1 CC1-1-10/3 第一部分 第一章 第十一节 CC1-1-11 第一部分 第一章 第十二节 CC1-1-12
对替代布置和新特性的风险评估 入级条件 范围和条件 其他规范 其他规范
的和其他的规范 其他国际组织的规范 的规范 授权 欧洲委员会 入级条件 范围和条件 IACS审计 IACS审计 入级条件 范围和条件
需提交的计划和数据 需提交的计划和数据 船体和设计数据 机构计划 计算
额外的计划 提交 入级条件 范围和条件 建造后检验条件 建造后检验条件
损坏,故障以及修补 检验和修补
修补
CC1-1-4/13
CC 1-1-5 CC 1-1-5/1 CC 1-1-5/3 CC 1-1-5/5 CC1-1-5/5.1 CC1-1-5/5.3CC
CC 1-1-6
CC1-1-7 CC1-1-7/1 CC1-1-7/3 CC1-1-7/5 CC1-1-7/7 CC1-1-7/9
船级的暂停 代表
检验的通知和有效性 港口国的参与要求 安全管理体系 入级条件 范围和条件 费用 费用
入级条件 范围和条件 不同意见 不同意见 规范 检验员 入级条件 范围和条件 责任 责任 入级条件 范围和条件
免于承担法律责任 免于承担法律责任
1-1-8 1-1-8/1 1-1-8/1.1 1-1-8/1.3 1-1-8/1.5 1-1-8/1.7 1-1-8/3 1-1-8/5 1-1-8/7
CC1-1-9
CC 1-1-10 CC 1-1-10/1 CC 1-1-10/3
CC 1-1-11
CC 1-1-12
28 ABS海上移动平台入级与建造规范·2012
通知与总信息
第一部分 入级条件 第一章 范围和条件 第十三节 诉讼时限 CC1-1-13 诉讼时限 第一部分 入级条件 第一章 范围和条件 第十四节 仲裁 CC1-1-14 仲裁 第一部分 入级条件 第一章 范围和条件 附录1 入级符号 CC1-1-A1 入级符号 第一部分 入级条件 第一章 范围和条件
ABS型式认证计划 附录2
CC1-1-A2 ABS型式认证计划 CC1-1-A2/1 通则 CC1-1-A2/3 条件 CC1-1-A2/5 程序 CC1-1-A2/5.1 设计评估 CC1-1-A2/5.1.1 设计评价 CC1-1-A2/5.1.2 原型或生产平台的检验和/或测试 CC1-1-A2/5.1.3 设计评估证书 CC1-1-A2 /5.1.4 产品的设计评估, CC1-1-A2/5.1.4i) CC1-1-A2/5.1.4ii) CC1-1-A2/5.3 生产评估(MA) CC1-1-A2/5.3.1 质量保证标准
CC1-1-A2/5.3.1(a) 质量认证标准(AQS) CC1-1-A2/5.3.1(b) 公认的质量标准(RQS) CC1-1-A2/5.3.1(c) 质量手册 CC1-1-A2/5.3.2 质量控制 CC1-1-A2/5.3.3 制造评估证书(MA) CC1-1-A2/5.3.3i) CC1-1-A2/5.3.3ii) CC1-1-A2/5.3.3iii) CC1-1-A2/5.3.4 型式批准确认(CTA) CC1-1-A2/5.5 产品质量保证认证(PQA) CC1-1-A2/5.7 证书 CC1-1-A2/5.7.1 装置-认证
CC1-1-A2/5.7.1(a) 产品质量保证涵盖的产品(1-1-A2/5.5) CC1-1-A2/5.7.1(b) 产品制造评估涵盖的产品(1-1-A2/5.3) CC1-1-A2/5.7.2 证明书的签发和更新 CC1-1-A2/5.7.2(a) 颁发证书
CC1-1-A2/5.7.2(b) 除了ABS规范以外,设计、程序和规则的变更 CC1-1-A2/5.7.2(c) ABS规范的变化 CC1-1-A2/5.7.2(d) 网站入口 CC1-1-A2/5.7.3 型式认可产品的可接受性 CC1-1-A2/5.7.4 重建 CC1-1-A2/5.7.4i) CC1-1-A2/5.7.4ii) CC1-1-A2/5.7.4iii)
CC 1-1-13
CC 1-1-14
CC 1-1-A1
CC1-1-A2 CC1-1-A2/1 CC1-1-A2/3 CC1-1-A2/5 CC1-1-A2/5.1 CC1-1-A2/5.1.1 CC1-1-A2/5.1.2 CC1-1-A2/5.1.3 CC1-1-A2 /5.1.4 CC1-1-A2/5.1.4i) CC1-1-A2/5.1.4ii) CC1-1-A2/5.3 CC1-1-A2/5.3.1 CC1-1-A2/5.3.1(a)CC1-1-A2/5.3.1(b)CC1-1-A2/5.3.1(c)CC1-1-A2/5.3.2 CC1-1-A2/5.3.3 CC1-1-A2/5.3.3i) CC1-1-A2/5.3.3ii) CC1-1-A2/5.3.3iii)CC1-1-A2/5.3.4 CC1-1-A2/5.5 CC1-1-A2/5.7 CC1-1-A2/5.7.1 CC1-1-A2/5.7.1(a)CC1-1-A2/5.7.1(b)CC1-1-A2/5.7.2 CC1-1-A2/5.7.2(a)CC1-1-A2/5.7.2(b)CC1-1-A2/5.7.2(c)CC1-1-A2/5.7.2(d)CC1-1-A2/5.7.3 CC1-1-A2/5.7.4 CC1-1-A2/5.7.4i) CC1-1-A2/5.7.4ii) CC1-1-A2/5.7.4iii)
ABS海上移动平台入级与建造规范·2012 29
通知与总信息
CC1-1-A2/5.7.5 CC1-1-A2/5.9 CC1-1-A2/5.9.1 CC1-1-A2/5.9.2 CC1-1-A2/5.9.3 CC1-1-A2/5.9.4 CC1-1-A2/5.9.5 CC1-1-A2/5.9.6 CC1-1-A2/5.9.7 CC1-1-A2/5.9.8 CC1-1-A2/5.9.9 CC1-1-A2/5.9.10 CC1-1-A2/5.9.11 CC1-1-A2/图1
第一部分 第一部分 第一章 第一节 1-1-1 第一部分 第一章 第二节 1-1-2 第一部分 第一章 第三节 1-1-3 1-1-3/1 1-1-3/1.1 1-1-3/1.3 第一部分 第一章 第四节 1-1-4 1-1-4/1
CC1-1-A2/5.7.5 逾期未审核
CC1-1-A2/5.9 产品型式认可和协议要求的条款和条件
CC1-1-A2/5.9.1 协议
CC1-1-A2/5.9.2 产品型式认可的代表
CC1-1-A2/5.9.3 证书的暂停
CC1-1-A2/5.9.4 有效性
CC1-1-A2/5.9.5 不同意见
CC1-1-A2/5.9.6
CC1-1-A2/5.9.7 赔偿限额
CC1-1-A2/5.9.8 仲裁
CC1-1-A2/5.9.9 诉讼时限
CC1-1-A2/5.9.10 责任
CC1-1-A2/5.9.11 认证范围
型式认可程序的过程 CC1-1-A2/图1 入级条件 入级条件 范围和条件 入级 入级
入级条件 范围和条件
入级的标志和符号 入级的标志和符号 入级条件 范围和条件 入级规则 入级规则 规则的应用 总则 应用
入级条件 范围和条件
需要提交的图纸和数据 需要提交的图纸和数据 船体和设计数据
1-1-1
1-1-2
1-1-3 1-1-3/1 1-1-3/1.1 1-1-3/1.3
1-1-4/3 机械图纸 1-1-4/5 计算 1-1-4/7 额外的图纸 1-1-4/9 提交 第一部分 入级条件 第一章 范围和条件 第五节 操作手册 1-1-5 操作手册
1-1-5/1 1-1-5/1.1 1-1-5/1.3 1-1-5/1.3i) 1-1-5/1.3ii) 1-1-5/1.3iii) 1-1-5/1. 3i v) 1-1-5/1.3v)
1-1-4
1-1-4/1 3-1-2/1 1-1-4/3 3-1-2/3 1-1-4/5 1-1-4/7
1-1-5
1-1-5/1 1-1-5/1.1 1-1-5/1.3 1-1-5/1.3i) 1-1-5/1.3ii) 1-1-5/1.3iii) 1-1-5/1.3iv) 1-1-5/1.3v
30 ABS海上移动平台入级与建造规范·2012
通知与总信息
1-1-5/1.3vi) 1-1-5/1.5 1-1-5/1.5i) 1-1-5/1.5ii) 1-1-5/1.5iii) 1-1-5/1.5iv) 1-1-5/1.5v) 1-1-5/1.5vi) 1-1-5/1.5vii) 1-1-5/1.5viii) 1-1-5/1.5ix) 1-1-5/1.5x) 1-1-5/1.5xi) 1-1-5/1.5xii) 1-1-5/1.7 1-1-5/1.9 1-1-5/1.11 1-1-5/1.13 1-1-5/1.15 第一部分 第一章 第六节 1-1-6 第二部分 整部分 第三部分 第一章 第一节 3-1-1 3-1-1/1 3-1-1/1.1 3-1-1/1.3 3-1-1/1.5 3-1-1/1.7 3-1-1/3 3-1-1/3.1 3-1-1/3.3 3-1-1/3.3.1 3-1-1/3.3.2 3-1-1/3.5 3-1-1/3.5.1 3-1-1/3.5.2 3-1-1/3.7 3-1-1/5 3-1-1/5.1 3-1-1/5.3 3-1-1/7 3-1-1/9 3-1-1/11 3-1-1/13 3-1-1/15 3-1-1/16 3-1-1/17
入级条件 范围和条件 建造手册 建造手册
材料和焊接规范
第二部分保持原样没有改变 船体结构和设备 总则 定义 定义 总则 平台 钻井平台 自航式平台 非自航式平台 钻井平台类型 自升式钻井平台 柱稳式钻井平台 半潜式钻井平台 底座式钻井平台 水面式钻井平台 驱动船式钻井平台 驳船式钻井平台 其他类型钻井平台 尺寸 总则 草案 吃水 型基线 舱壁甲板 干舷甲板 空载重量 总提升载荷 操作模式
1-1-5/1.3vi) 1-1-5/1.5 1-1-5/1.5i) 1-1-5/1.5ii) 1-1-5/1.5iii) 1-1-5/1.5iv) 1-1-5/1.5v) 1-1-5/1.5vi) 1-1-5/1.5vii) 1-1-5/1.5viii) 1-1-5/1.5ix) 1-1-5/1.5x) 1-1-5/1.5xi) 1-1-5/1.5xii) 1-1-5/1.7 1-1-5/1.9 1-1-5/1.11 1-1-5/1.13 1-1-5/1.15 1-1-5/3
7-1-2/25
普通第二部分
3-1-1 3-1-1/1 3-1-1/1.1 3-1-1/1.3 3-1-1/1.5 3-1-1/1.7 3-1-1/3 3-1-1/3.1 3-1-1/3.3 3-1-1/3.3.1 3-1-1/3.3.2 3-1-1/3.5 3-1-1/3.5.1 3-1-1/3.5.2 3-1-1/3.7 3-1-1/5 3-1-1/5.1 3-1-1/5.3 3-1-1/7 3-1-1/9 3-1-1/11 3-1-1/13 3-1-1/15 3-1-1/16 3-1-1/17
ABS海上移动平台入级与建造规范·2012 31
通知与总信息
3-1-1/17.1 3-1-1/17.3 3-1-1/17.5 3-1-1/19 3-1-1/21 3-1-1/23 第三部分 第一章 第二节 3-1-2 3-1-2/1 3-1-2/1.1 3-1-2/1.3 3-1-2/1.3.1 3-1-2/1.3.2 3-1-2/1.3.3 3-1-2/1.3.3(a) 3-1-2/1.3.3(b) 3-1-2/1.3.3(c) 3-1-2/1.3.3(d) 3-1-2/1.3.3(e) 3-1-2/1.5 3-1-2/1.5.1 3-1-2/1.5.2 3-1-2/1.5.3 3-1-2/1.5.4 3-1-2/1.7 3-1-2/1.7.1 3-1-2/1.7.2 3-1-2/1.9 3-1-2/1.11 3-1-2/1.11.1 3-1-2/1.11.2 3-1-2/1.11.3 3-1-2/表1 3-1-2/表2 3-1-2/图 1 第三部分 第一章 第三节 3-1-3 3-1-3/1 3-1-3/1.1 3-1-3/1.3 3-1-3/1.5 3-1-3/1.7 3-1-3/3 3-1-3/3.1 3-1-3/3.3 3-1-3/3.5 3-1-3/3.7 3-1-3/5 3-1-1/17.1 正常钻井状态
3-1-1/17.3 极端风暴状态
3-1-1/17.5 移航工况
3-1-1/19 风雨密
3-1-1/21 水密
3-1-1/23 单位制
船体结构和设备
总则
环境载荷
3-1-3 环境载荷
3-1-3/1 载荷准则
3-1-3/1.1 总则
3-1-3/1.3 风载荷
3-1-3/1.3.1 总则
3-1-3/1.3.2 风压
3-1-3/1.3.3 风力
3-1-3/1.3.3(a) 3-1-3/1.3.3(b) 3-1-3/1.3.3(c) 3-1-3/1.3.3(d) 3-1-3/1.3.3(e)
3-1-3/1.5 波浪载荷
3-1-3/1.5.1 总则
3-1-3/1.5.2 波浪载荷确定
3-1-3/1.5.3 莫里森公式
3-3-3/5.9 波浪动力响应
3-1-3/1.7 流载荷
3-1-3/1.7.1 海浪流
3-1-3/1.7.2 拖曳力
3-1-3/1.9 涡流分离载荷
3-1-3/1.11 重力和作用载荷
3-1-3/1.11.1 总则
3-1-3/1.11.2 设计的重力集中和作用载荷
3-1-3/1.11.3 甲板载荷
Cs值 3-1-3/表 1 Ch值 3-1-3/表 2
3-1-3/Figure 1 流速分布图
船体结构和设备
总则
材料选取
3-1-4 材料选取
3-1-4/1 材料
3-1-4/1.1 总则
4-1-1/7.11 3-1-4/1.3 钢材特性
3-1-4/1.5 韧性
3-1-4/1.7 其他材料
3-1-4/3 船体钢等级
3-1-4/3.1 普通钢和高强度钢
3-1-4/3.3 调质钢
3-1-4/3.5 补充规定
3-1-4/3.7 其他等级
3-1-4/5 等级选取
32 ABS海上移动平台入级与建造规范·2012
通知与总信息
3-1-3/5.1 3-1-3/5.3 3-1-3/5.3.1 3-1-3/5.3.2 3-1-3/5.3.3 3-1-3/5.5 3-1-3/5.5.1 3-1-3/5.5.2 3-1-3/5.5.3 3-1-3/5.7 3-1-3/5.9 3-1-3/5.9.1 3-1-3/5.9.2 3-1-3/5.9.3 3-1-3/5.9.4 3-1-3/5.9.5 3-1-3/5.9.5i) 3-1-3/5.9.5ii) 3-1-3/5.9.5iii) 3-1-3/5.9.5iv) 3-1-3/表1 第三部分 第一章 附录1 3-1-A1 3-1-A1/1 3-1-A1/3 3-1-A1/5 3-1-A1/7 3-1-A1/图1 3-1-A1/图1 3-1-A1/图2 3-1-A1/图2 3-1-A1/图3 3-1-A1/图3 3-1-A1/图4 3-1-A1/图4 3-1-A1/图5 3-1-A1/图5 3-1-A1/图6 3-1-A1/图6 3-1-A1/图7 3-1-A1/图7 3-1-A1/图8 3-1-A1/图8 3-1-A1/图9 3-1-A1/图9 第三部分 第一章 附录2 3-1-A2 3-1-A2/1 3-1-4/5.1 总则
3-2-3/3.1 自升式平台
3-2-3/3.1.1 次要构件(影响最小)
3-2-3/3.1.2 主要构件(影响中等)
3-2-3/3.1.3 特殊构件(影响最大)
3-1-4/1.7 柱稳式平台
3-1-4/1.7.1 次要构件(影响最小)
3-1-4/1.7.2 主要构件(影响中等)
3-1-4/1.7.3 特殊构件(影响最大)
3-1-4/5.5 ABS钢材等级选择标准
3-1-4/5.7 其他钢材标准
3-1-4/5.7.1 总则
3-1-4/5.7.2 CNV准则
3-1-4/5.7.3 CNV温度
3-1-4/5.7.4 超高强度钢
3-1-4/5.7.5 可选准则
3-1-4/5.7.5i) 3-1-4/5.7.5ii) 3-1-4/5.7.5iii) 3-1-4/5.7.5iv) ABS普通钢和高强度钢材料选择标准 3-1-4/表1
船体结构和设备
总则
浅水波浪理论
3-1-A1 浅水波浪理论
3-1-A1/1 公式
3-1-A1/3 名词术语
3-1-A1/5 举例
3-1-A1/7 计算
波峰升高与浪高比– SI和米制单位 3-1-A1/图1 波峰升高与浪高比– U.S.单位 3-1-A1/图1 相对波高– SI和米制单位 3-1-A1/图2 相对波高– U.S.单位 3-1-A1/图2 波长修正因子– SI和米制单位 3-1-A1/图3 波长修正因子– U.S.单位 3-1-A1/图3 拖曳力因子– SI和米制单位 3-1-A1/图4 拖曳力因子– U.S.单位 3-1-A1/图4 拖曳力力臂与静水深度比– SI和米制单位 3-1-A1/图5 拖曳力力臂与静水深度比– U.S.单位 3-1-A1/图5 惯性力因子– SI和米制单位 3-1-A1/图6 惯性力因子U.S.单位 3-1-A1/图6 惯性力臂与静水深度比– SI和米制单位 3-1-A1/图7 惯性力臂与静水深度比U.S.单位 3-1-A1/图7 合力与拖曳力比– SI和米制单位 3-1-A1/图8 合力与拖曳力比U.S.单位 3-1-A1/图8 最大力矩角– SI和米制单位 3-1-A1/图9 最大力矩角U.S.单位 3-1-A1/图9
船体结构和设备
总则
深水波浪理论
3-1-A2 深水波浪理论
3-1-A2/1 波面公式
ABS海上移动平台入级与建造规范·2012 33
通知与总信息
3-1-A2/3 3-1-A2/5 3-1-A2/7 3-1-A2/9 3-1-A2/11 3-1-A2/13 3-1-A2/15 3-1-A2/15I 3-1-A2/15II 3-1-A2/15III 3-1-A2/15IV 第三部分 第一章 附录3 3-1-A3 3-1-A3/1 3-1-A3/3 3-1-A3/5 3-1-A3/7 3-1-A3/表1 3-1-A3/表2 3-1-A3/表2A 3-1-A3/表3 第三部分 第二章 第一节 3-2-1 3-2-1/1 3-2-1/1.1 3-2-1/1.1i) 3-2-1/1.1ii) 3-2-1/1.3 3-2-1/1.5 3-2-1/1.7 3-2-1/1.9 3-2-1/1.9.1 3-2-1/1.9.2 3-2-1/1.11 3-2-1/1.13 3-2-1/1.15 3-2-1/1.15i) 3-2-1/1.15ii) 3-2-1/1.15iii) 3-2-1/1.15iv) 3-2-1/1.17 3-2-1/1.19 3-2-1/3 3-2-1/3.1 3-2-1/3.3 3-2-1/3.5 3-2-1/3.7 3-2-1/3.7.1 3-2-1/3.7.2 3-2-1/3.9 3-1-A2/3 水质点速度公式
3-1-A2/5 水质点加速公式
3-1-A2/7 动压力公式
3-1-A2/9 求深水惯性载荷举例
3-1-A2/11 浮体
3-1-A2/13 深水拖曳力
3-1-A2/15 质量因子推荐取值
3-1-A2/15I Cm二维取值
3-1-A2/15II Cm三位修正值
3-1-A2/15III 应用
3-1-A2/15IV 术语
船体结构和设备 总则
ABS高强度调质钢材料等级选择指南 ABS高强度调质钢材料等级选择指南 3-1-A3
3-1-A3/1 总则
3-1-A3/3 化学成分
3-1-A3/5 机械性能
3-1-A3/7 热处理
ABS高强度调质钢化学成分 3-1-A3/表1 ABS高强度调质钢机械性能准则 3-1-A3/表2 备选试件B伸长量规定 3-1-A3/表2A ABS调质钢材料等级选择指南 3-1-A3/表3 船体结构和设备 主体结构和布置 结构分析
3-2-1 结构分析
3-2-1/1 结构分析
3-2-1/1.1 主要结构分析
3-2-1/1.1i) 3-2-1/1.1ii)
3-2-1/1.3 局部应力考虑
3-2-1/1.5 应力分量合成
3-2-1/1.7 屈曲考虑
3-2-1/1.9 弯曲载荷确定
3-2-1/1.9.1 有效带板面积
3-2-1/1.9.2 偏心轴向载荷
3-2-1/1.11 剪切应力确定
3-2-1/1.13 应力集中
3-2-1/1.15 结点连接分析和细部设计
3-2-1/1.15i) 3-2-1/1.15ii) 3-2-1/1.15iii) 3-2-1/1.15iv)
3-2-1/1.17 疲劳分析
3-2-1/1.19 塑性分析
3-2-1/3 许用应力
3-2-1/3.1 总则
3-2-1/3.3 单个应力分量
3-2-1/3.5 屈曲考虑
3-2-1/3.7 受轴向载荷和弯曲共同作用之构件
3-2-1/3.7.1 3-2-1/3.7.2
3-2-1/3.9 圆柱屈曲应力
34 ABS海上移动平台入级与建造规范·2012
通知与总信息
3-2-1/3.9.1 3-2-1/3.9.2 3-2-1/3.11 第三部分 第二章 第二节 3-2-2 3-2-2/1 3-2-2/1.1 3-2-2/1.3 3-2-2/1.5 3-2-2/1.7 3-2-2/3 3-2-2/3.1 3-2-2/3.3 3-2-2/3.3.1 3-2-2/3.3.2 3-2-2/3.3.3 3-2-2/3.3.4 3-2-2/5 3-2-2/5.1 3-2-2/5.1.1 3-2-2/5.1.2 3-2-2/5.3 3-2-2/7 3-2-2/7.1 3-2-2/7.3 3-2-2/7.5 3-2-2/7.7 3-2-2/7.7.1 3-2-2/7.7.2 3-2-2/7.7.3 3-2-2/7.9 3-2-2/7.9.1 3-2-2/7.9.2 3-2-2/7.9.3 3-2-2/9 3-2-2/9.1 3-2-2/9.3 3-2-2/9.5 3-2-2/9.7 3-2-2/9.9 3-2-2/9.9.1 3-2-2/9.9.2 3-2-2/9.9.3 3-2-2/9.11 3-2-2/11 3-2-2/11.1 3-2-2/11.3 3-2-2/11.5 3-2-2/11.7 3-2-2/13 3-2-2/13.1 整体屈曲 局部屈曲
板结构等效应力标准 船体结构和设备 主体结构和布置 共同结构 共同结构 总则 材料 尺寸
水面式钻井平台 钢结构保护 直升机甲板 总则 结构
整体均布载荷
直升机着落冲击载荷 直升机存放载荷 平台运动载荷 钻塔支撑结构 下部结构 载荷 组合载荷
下部支撑结构布置 水密舱壁和水密平台 总则 壳板
加强筋和横梁 槽型舱壁 舱壁板 加强筋 端部连接 纵桁和强梁 强度准则 比例 防倾肘板
液舱舱壁和液舱平台 总则 板
加强筋和横梁 槽型舱壁 纵桁和强梁 强度准则 比例 防倾肘板
排水孔和通气孔 附体 总则
救生艇平台
起重机底座和基础 管架
高强度材料 总则
3-2-1/3.9.1 3-2-1/3.9.2 3-2-1/3.11
3-2-2 3-2-2/1 3-2-2/1.1 3-2-2/1.3
3-2-2/1.5 3-2-2/3 3-2-2/3.1 3-2-2/3.3 3-2-2/3.3.1 3-2-2/3.3.2 3-2-2/3.3.3 3-2-2/3.3.4 3-2-2/5 3-2-2/5.1 3-2-2/5.1.1 3-2-2/5.1.2 3-2-2/5.3 3-2-2/7 3-2-2/7.1 3-2-2/7.3 3-2-2/7.5 3-2-2/7.7 3-2-2/7.7.1 3-2-2/7.7.2 3-2-2/7.7.3 3-2-2/7.9 3-2-2/7.9.1 3-2-2/7.9.2 3-2-2/7.9.3 3-2-2/9 3-2-2/9.1 3-2-2/9.3 3-2-2/9.5 3-2-2/9.7 3-2-2/9.9 3-2-2/9.9.1 3-2-2/9.9.2 3-2-2/9.9.3 3-2-2/9.11 3-2-2/11 3-2-2/11.1 3-2-2/11.3 3-2-2/11.5 3-2-2/11.7 5-3-1/513 5-3-1/13.1
ABS海上移动平台入级与建造规范·2012 35
通知与总信息
3-2-2/13.3 5-3-1/13.3 水密舱壁和水密平台以及液舱舱壁和液舱平台 3-2-2/表1 直升机甲板基于Fy的许用安全因子 3-2-2/表1 3-2-2/表2 肘板和折边板厚度及翼板宽度 3-2-2/表2 3-2-2/表3 Q值 3-2-2/表3 3-2-2/图1 槽型舱壁 3-2-2/图1 3-2-2/图2 槽型舱壁和端部连接 3-2-2/图2
第三部分 船体结构和设备
第二章 主体结构和布置 第三节 自升式钻井平台 3-2-3 3-2-3 自升式钻井平台 3-2-3/1 3-2-3/1 适用范围 3-2-3/3 3-2-3/3.3 尺寸要求 3-2-3/5 3-2-3/5 平台提升模块 3-2-3/5.1 3-2-3/5.1 总则 3-2-3/5.3 3-2-3/5.3 抗倾覆安全性 3-2-3/5.3.1 3-2-3/5.3.1 额定负载条件下抗倾覆安全计算 3-2-3/5.3.1(a) 3-2-3/5.3.1(a) 正常钻井状态 3-2-3/5.3.1(b) 3-2-3/5.3.1(b) 极端风暴状态 3-2-3/5.5 3-2-3/5.5 气隙 3-2-3/5.7 3-2-3/5.7 预压载荷 3-2-3/5.7.1 3-2-3/5.7.1 性能 3-2-3/5.7.2 3-2-3/5.7.2 桩腿强度 3-2-3/7 3-2-3/7 桩腿
3-2-3/7.1 3-2-3/7.1 桩腿提升状态
3-2-3/7.1.1 3-2-3/7.1.1 桩腿型式
3-2-3/7.1.2 3-2-3/7.1.2 桩腿尺寸
3-2-3/7.1.3 3-2-3/7.1.3 桩靴——土壤相互作用
3-2-3/7.1.4 3-2-3/7.1.4 海床条件
3-2-3/7.3 3-2-3/7.3 移航状态下的桩腿 3-2-3/7.3.1 3-2-3/7.3.1 现场移航状态下的桩腿 3-2-3/7.3.2 3-2-3/7.3.2 恶劣风暴环境迁航状态下的桩腿 3-2-3/9 3-2-3/9 平台与桩腿的相接结构 3-2-3/11 3-2-3/11 船体结构 3-2-3/13 3-2-3/13 桩靴与沉垫 3-2-3/13.1 3-2-3/13.1 桩靴 3-2-3/13.1.1 3-2-3/13.1.1 总则
3-2-3/13.1.2 3-2-3/13.1.2 海上模块负载状态
3-2-3/13.1.2i) 3-2-3/13.1.2i) 3-2-3/13.1.2i)a) 3-2-3/13.1.2i)a) 舱壁板 3-2-3/13.1.2i)b) 3-2-3/13.1.2i)b) 加强筋 3-2-3/13.1.2i)c) 3-2-3/13.1.2i)c) 纵桁 3-2-3/13.1.2ii) 3-2-3/13.1.2ii) 3-2-3/13.1.2ii)a) 3-2-3/13.1.2ii)a) 舱壁板 3-2-3/13.1.2ii)b) 3-2-3/13.1.2ii)b) 加强筋 3-2-3/13.1.2ii)c) 3-2-3/13.1.2ii)c) 纵桁 3-2-3/13.1.3 3-2-3/13.1.3 提升模块负载状态 3-2-3/13.1.3i) 3-2-3/13.1.3i) 预压载荷状态 3-2-3/13.1.3ii) 3-2-3/13.1.3ii) 正常钻井和极端风暴钻井状态 3-2-3/13.1.3ii)a) 3-2-3/13.1.3ii)a) 3-2-3/13.1.3ii)b) 3-2-3/13.1.3ii)b) 3-2-3/13.3 3-2-3/13.3 沉垫 3-2-3/15 3-2-3/15 甲板室 3-2-3/15.1 3-2-3/15.1 通则
36 ABS海上移动平台入级与建造规范·2012
通知与总信息
3-2-3/15.3 3-2-3/15.5 3-2-3/15.7 3-2-3/15.9 3-2-3/15.11 3-2-3/15.13 3-2-3/17 3-2-3/图1 第三部分 第二章 第四节 3-2-4 3-2-4/1 3-2-4/1.1 3-2-4/1.3 3-2-4/1.3i) 3-2-4/1.3ii) 3-2-4/1.5 3-2-4/3 3-2-4/3.1 3-2-4/3.3 3-2-4/3.3.1 3-2-4/3.3.2 3-2-4/3.3.3 3-2-4/3.3.4 3-2-4/3.5 3-2-4/3.7 3-2-4/3.7.1 3-2-4/3.7.2 3-2-4/3.7.3 3-2-4/3.9 3-2-4/3.9.1 3-2-4/3.9.2 3-2-4/3.9.3 3-2-4/3.9.4 3-2-4/3.11 3-2-4/3.13 3-2-4/3.15 3-2-4/5 3-2-4/5.1 3-2-4/5.3 3-2-4/5.3.1 3-2-4/5.3.2 3-2-4/5.3.3 3-2-4/5.3.4 3-2-4/5.5 3-2-4/5.7 3-2-4/5.9 3-2-4/5.9.1 3-2-4/5.9.2 3-2-4/5.9.3 3-2-4/5.9.3i) 3-2-4/5.9.3ii) 设计水头 船壳板 加强筋 舱室侧板 末端附件 防剥离装置
钻井架的支撑结构 典型船体结构 船体结构和设备 主体结构和布置 柱稳式钻井平台 柱稳式钻井平台 总则 适用范围
关于应力的特殊考虑
锚泊力对局部结构的影响 上壳体 总则 钢甲板 一般要求 储物区甲板 液舱甲板
叉车有关的规定 横梁 纵桁 强度要求 尺寸比例 防倾肘板 支柱和杆 许用载荷 长度 设计载荷
液舱顶部以下的支柱
不受波浪载荷作用的无浮力上壳体 有浮力的上壳体
承受波浪载荷的上壳体 立柱、下壳体和桩靴 一般规定
有骨材壳体的尺寸 液舱 空舱
波浪浸没区域 最小尺寸
无骨材壳体的尺寸 结构平台的尺寸 附加结构要求
波浪、海流载荷相关规定 结构运动相关规定 局部高载荷
3-2-3/15.3 3-2-3/15.5 3-2-3/15.7 3-2-3/15.9 3-2-3/15.11 3-2-3/15.13 3-2-3/17
3-2-3/Figure 2
3-2-4 3-2-4/1 3-2-4/1.1 3-2-4/1.3 3-2-4/1.3i) 3-2-4/1.3ii) 3-2-4/1.5 3-2-4/3 3-2-4/3.1 3-2-4/3.3 3-2-4/3.3.1 3-2-4/3.3.2 3-2-4/3.3.3 3-2-4/3.3.4 3-2-4/3.5 3-2-4/3.7 3-2-4/3.7.1 3-2-4/3.7.2 3-2-4/3.7.3 3-2-4/3.9 3-2-4/3.9.1 3-2-4/3.9.2 3-2-4/3.9.3 3-2-4/3.9.4 3-2-4/3.11 3-2-4/3.13 3-2-4/7.3 3-2-4/5 3-2-4/5.1 3-2-4/5.3 3-2-4/5.3.1 3-2-4/5.3.2 3-2-4/5.3.3 3-2-4/5.3.4 3-2-4/5.5 3-2-4/5.7 3-2-4/5.9 3-2-4/5.9.1 3-2-4/5.9.2 3-2-4/5.9.3 3-2-4/5.9.3i) 3-2-4/5.9.3ii)
ABS海上移动平台入级与建造规范·2012 37
通知与总信息
3-2-4/5.9.3iii) 3-2-4/5.9.3iv) 3-2-4/5.9.4 3-2-4/5.9.4i) 3-2-4/5.9.4ii) 3-2-4/5.9.4iii) 3-2-4/5.11 3-2-4/5.11.1 3-2-4/5.11.2 3-2-4/5.11.3 3-2-4/5.11.4 3-2-4/5.11.5 3-2-4/5.13 3-2-4/7 3-2-4/7.1 3-2-4/7.1.1 3-2-4/7.1.2 3-2-4/7.1.3 3-2-4/7.3 3-2-4/9 3-2-4/9.1 3-2-4/9.3 3-2-4/11 3-2-4/11.1 3-2-4/11.3 3-2-4/11.3i) 3-2-4/11.3ii) 3-2-4/11.5 3-2-4/13 3-2-4/15 3-2-4/15.1 3-2-4/15.3 3-2-4/表格1 第三部分 第二章 第五节 3-2-5 3-2-5/1 3-2-5/3 3-2-5/3.1 3-2-5/3.3 3-2-5/3.5 3-2-5/3.7 3-2-5/3.9 3-2-5/5 第三部分 第二章 第六节 3-2-6 3-2-6/1 3-2-6/1.1 3-2-6/1.3 3-2-6/1.3.1 3-2-4/5.9.3iii) 3-2-4/5.9.3iv)
3-2-4/5.9.4 冲刷作用
3-2-4/5.9.4i) 3-2-4/5.9.4ii) 3-2-4/5.9.4iii)
3-2-4/5.11 撑杆
3-2-4/5.11.1 一般规定
3-2-4/5.11.2 载荷条件
3-2-4/5.11.3 波浪抨击效应
3-2-4/5.11.4 管形撑杆的加固
3-2-4/5.11.5 水密撑杆
3-2-4/5.13 立柱上的开口
3-2-4/7 甲板舱室
3-2-4/7.1 通则
3-2-4/7.1.1 不用承受波浪载荷的上部结构的甲板室
3-2-4/7.1.2 承受波浪载荷的上部结构的甲板室
3-2-4/7.1.3 漂浮的上部结构上的甲板室
3-2-4/7.3 上部结构的储罐
3-2-4/9 气隙
3-2-4/9.1 漂浮作业状态
3-2-4/9.3 操作沉底模式
3-2-4/11 结构冗余度
3-2-4/11.1 假定破损条件
3-2-4/11.3 分析
3-2-4/11.3i) 3-2-4/11.3ii)
3-2-4/11.5 上壳体
3-2-4/13 支撑钻井架的结构
3-2-4/15 高强度材料
3-2-4/15.1 总则
13-2-4/15.3 上部结构
Q符号 3-2-4/表
船体结构和设备
主体结构和布置 水面式平台
3-2-5 水面式平台
3-2-5/1 一般规定
结构尺寸
一般规定
3-2-5/9 井筒
3-2-5/11 舱口
3-2-5/5.9.2 集中载荷
3-2-5/13 锚泊力对局部结构的影响
支撑钻井架的结构
船体结构和设备
主体结构和布置
焊接方法、焊接与成型设计——焊缝设计
3-2-6 焊接方法、焊接与成型设计——焊缝设计
3-2-6/1 填角焊缝
3-2-6/1.1 设计图与技术条件
3-2-6/1.3 T型连接
3-2-6/1.3.1 填角焊缝的大小
38 ABS海上移动平台入级与建造规范·2012
通知与总信息
3-2-6/1.3.2 3-2-6/1.3.3 3-2-6/1.3.4 3-2-6/1.3.5 3-2-6/1.5 3-2-6/1.7 3-2-6/1.9 3-2-6/1.9.1 3-2-6/1.9.2 3-2-6/1.11 3-2-6/1.11.1 3-2-6/1.11.2 3-2-6/1.13 3-2-6/3 3-2-6/5 3-2-6/7 3-2-6/表1 第三部分 第二章 第七节 3-2-7 3-2-7/1 3-2-7/3 3-2-7/5 3-2-7/5.1 3-2-7/5.3 3-2-7/5.3.1 3-2-7/5.3.2 3-2-7/5.3.3 3-2-7/7 3-2-7/9 3-2-7/9.1 3-2-7/9.3 第三部分 第二章 附录1 3-2-A1 3-2-A1/1 3-2-A1/1.1 3-2-A1/1.3 3-2-A1/1.3.1 3-2-A1/1.3.2 3-2-A1/1.5 3-2-A1/3 3-2-A1/5 3-2-A1/7 3-2-A1/9 3-2-A1/11 3-2-A1/11.1 3-2-A1/11.3 3-2-A1/13 3-2-A1/13.1 3-2-A1/13.3 3-2-6/1.3.2 焊缝的长度及布置
3-2-6/1.3.3 十字交错接头处的间断焊缝
3-2-6/1.3.4 纵骨与板的焊接
3-2-6/1.3.5 舱口盖上的扶强材及腹板
3-2-6/1.5 端部T型连接
3-2-6/1.7 无肘板扶强材的端部
3-2-6/1.9 焊接尺寸的减少
3-2-6/1.9.1 可控的间隙
3-2-6/1.9.2 深穿透焊缝
3-2-6/1.11 搭接焊缝
3-2-6/1.11.1 端部搭接
3-2-6/1.11.2 搭接焊合
3-2-6/1.13 塞焊焊缝
3-2-6/3 全/部分焊透角接/T型接头
3-2-6/5 备选设计
4-1-1/7.11 机器构件的焊接
焊接因子 3-2-6/表1
船体结构和设备
主体结构和布置
焊接方法、焊接与成型设计——焊缝制造
7-1-2/9 焊接方法、焊接与成型设计——焊缝制造
7-1-2/9 一般规定
7-1-2/9.1 超过50mm(2in)的厚度
焊缝的检查范围
7-1-2/9.3 一般规定
7-1-2/11.7 范围及方法
7-1-2/11.3 自升式平台
7-1-2/11.1 柱稳式平台
7-1-2/11 无损探伤计划
7-1-2/11.11 可接受标准
7-1-2/9.5 填角焊缝
7-1-2/9.5 焊接工艺
7-1-7/9.5 特殊预防措施
船体结构和设备
主体结构和布置
在冰中航行的移动式海底钻井平台强化指南
3-2-A1 在冰中航行的移动式海底钻井平台强化指南
3-2-A1/1 适用范围
3-2-A1/1.1 柱稳式钻井平台
3-2-A1/1.3 其他形式的平台
3-2-A1/1.3.1 表面式平台
3-2-A1/1.3.2 自升式平台
3-2-A1/1.5 新特点
3-2-A1/3 冰区等级的选择
3-2-A1/5 冰区水线
3-2-A1/7 间隙
3-2-A1/9 冰带区
3-2-A1/11 设计冰载荷
3-2-A1/11.1 设计冰压力
3-2-A1/11.3 设计总体冰载荷
3-2-A1/13 结构评估
3-2-A1/13.1 总体评估
3-2-A1/13.3 局部尺寸
ABS海上移动平台入级与建造规范·2012 39
通知与总信息
3-2-A1/15 3-2-A1/表1 3-2-A1/表2 3-2-A1/表3 3-2-A1/图1 第三部分 第二章 附录2 3-2-A2
3-2-A1/15 其他要求
柱稳式钻井平台冰区等级选择指南 3-2-A1/表1 相对于集中度和厚度的冰况定义 3-2-A1/表2 冰压力因子 3-2-A1/表3 冰带区 3-2-A1/图1 船体结构和设备 主体结构和布置
响应分析 - “用于列稳定的钻井装置的结构分析的选择设计波指南”(双体半潜式)响应分析—柱稳式钻井(双体半潜式)平台进行结构分3-2-A2 析时设计波的选择指南
3-2-A2/1 3-2-A2/1 一般规定 3-2-A2/1.1 3-2-A2/1.1 引言 3-2-A2/3 3-2-A2/3 总体动水压力载荷的特性 3-2-A2/3.1 3-2-A2/3.1 一般规定 3-2-A2/3.1i) 3-2-A2/3.1i) 3-2-A2/3.1ii) 3-2-A2/3.1ii) 3-2-A2/3.1iii) 3-2-A2/3.1iii) 3-2-A2/3.1iv) 3-2-A2/3.1iv) 3-2-A2/3.1v) 3-2-A2/3.1v) 3-2-A2/3.3 3-2-A2/3.3 浮箱间的撕裂力 3-2-A2/3.3i) 3-2-A2/3.3i) 3-2-A2/3.3ii) 3-2-A2/3.3ii) 3-2-A2/3.3iii) 3-2-A2/3.3iii) 3-2-A2/3.5 3-2-A2/3.5 关于横向的水平轴扭转的俯仰力矩 3-2-A2/3.5i) 3-2-A2/3.5i) 3-2-A2/3.5ii) 3-2-A2/3.5ii) 3-2-A2/3.7 3-2-A2/3.7 浮箱间的纵向剪切力 3-2-A2/3.9 3-2-A2/3.9 纵向和横向加速度 3-2-A2/3.11 3-2-A2/3.11 作用在浮箱上的垂向波浪弯矩 3-2-A2/3.11i) 3-2-A2/3.11i) 3-2-A2/3.11ii) 3-2-A2/3.11ii) 3-2-A2/5 3-2-A2/5 随机的方法选择设计波 3-2-A2/5.1 3-2-A2/5.1 一般规定 3-2-A2/5.3 3-2-A2/5.3 分析方法 3-2-A2/5.3.1 3-2-A2/5.3.1 3-2-A2/5.3.2 3-2-A2/5.3.2 3-2-A2/5.3.3 3-2-A2/5.3.3 3-2-A2/5.3.4 3-2-A2/5.3.4 3-2-A2/5.3.5 3-2-A2/5.3.5 3-2-A2/5.3.6 3-2-A2/5.3.6 3-2-A2/5.3.7 3-2-A2/5.3.7 3-2-A2/5.3.8 3-2-A2/5.3.8 3-2-A2/5.3.9 3-2-A2/5.3.9 3-2-A2/5.5 3-2-A2/5.5 不规则海浪陡度 3-2-A2/7 3-2-A2/7 确定性方法选择设计波 3-2-A2/7.1 3-2-A2/7.1 一般规定 3-2-A2/7.3 3-2-A2/7.3 分析方法 3-2-A2/7.3i) 3-2-A2/7.3i) 3-2-A2/7.3ii) 3-2-A2/7.3ii) 3-2-A2/7.3iii) 3-2-A2/7.3iii) 3-2-A2/7.3iv) 3-2-A2/7.3iv) 3-2-A2/7.3v) 3-2-A2/7.3v) 3-2-A2/7.5 3-2-A2/7.5 规则波陡度 第三部分 船体结构和设备
40 ABS海上移动平台入级与建造规范·2012
通知与总信息
第二章 附录3
3-2-A3 3-2-A3/1
第三部分 第三章 第一节 3-3-1 3-3-1/1 3-3-1/1.1 3-3-1/1.3 3-3-1/1.3.1 3-3-1/1.3.2 3-3-1/1.3.2(a) 3-3-1/1.3.2(b) 3-3-1/1.3.2(b)i) 3-3-1/1.3.2(b)ii) 3-3-1/1.3.2(b)iii) 3-3-1/1.3.2(c) 3-3-1/1.3.3 3-3-1/1.3.3(a) 3-3-1/1.3.3(b) 3-3-1/1.5 3-3-1/3 3-3-1/3.1 3-3-1/3.3 3-3-1/3.3.1 3-3-1/3.3.2 3-3-1/3.3.3 3-3-1/3.3.3(a) 3-3-1/3.3.3(b) 3-3-1/3.3.4 3-3-1/3.5 3-3-1/3.7 3-3-1/3.9 3-3-1/3.9.1 3-3-1/3.9.2 3-3-1/3.9.2i) 3-3-1/3.9.2ii) 3-3-1/3.9.2iii) 3-3-1/3.9.2iv) 3-3-1/3.9.2v) 3-3-1/3.9.2vi) 3-3-1/3.9.3 3-3-1/5 3-3-1/7 3-3-1/7.1 3-3-1/7.1i) 3-3-1/7.1ii) 3-3-1/7.3 3-3-1/7.3i) 3-3-1/7.3ii) 3-3-1/7.3iii) 3-3-1/7.3iv) 3-3-1/7.3v)
主体结构和布置
局部高应力区的许用应力指南 局部高应力区的许用应力指南 板结构
船体结构和设备 分舱与稳性
稳性与水密/风雨密完整性 稳性与水密/风雨密完整性 稳性 一般规定 漂浮稳定性 完整稳性 破舱稳性
对空舱处理方式的备选方案
空船重量及重心 稳性标准 一般规定 扶正力矩 完整稳性标准 破舱稳性标准
剩余稳性标准—柱稳式平台
剩余稳性标准—自升式平台 倾覆力矩 风洞试验 备选稳性标准 一般规定 指导方针
备选完整稳性标准 载重线 破损范围 自升式平台
柱稳式钻井平台
3-2-A3 3-2-A3/1
3-3-1
3-3-1 ,3-3-2 3-3-2/1.1 3-3-2/1.3 3-3-2/1.3.1 3-3-2/1.3.2 3-3-2/1.3.3 3-3-2/1.3.2(a) 3-3-2/1.3.2(b) 3-3-2/1.3.2(b)i) 3-3-2/1.3.2(b)ii) 3-3-2/1.3.2(b)iii) 3-3-2/1.3.2(c) 3-3-2/1.3.4 3-3-2/1.3.4(a) 3-3-2/1.3.4(b) 3-3-1/3 3-3-2/3 3-3-2/3.1 3-3-2/3.3 3-3-2/3.3.1 3-3-2/3.3.2 3-3-2/3.3.4 3-3-2/3.3.4(a) 3-3-2/3.3.4(b) 3-3-2/3.3.3 3-3-2/3.7 3-3-2/3.9 3-3-2/3.11 3-3-2/3.11.1 3-3-2/3.11.2 3-3-2/3.11.2i) 3-3-2/3.11.2ii) 3-3-2/3.11.2iii) 3-3-2/3.11.2iv) 3-3-2/3.11.2v) 3-3-2/3.11.2vi) 3-3-2/3.11.3 3-3-2/1 3-3-2/3.5 3-3-2/3.5.1 3-3-2/3.5.1i) 3-3-2/3.5.1ii) 3-3-2/3.5.2 3-3-2/3.5.2i) 3-3-2/3.5.2ii) 3-3-2/3.5.2iii) 3-3-2/3.5.2iv) 3-3-2/3.5.2v)
ABS海上移动平台入级与建造规范·2012 41
通知与总信息
3-3-1/7.5 3-3-1/7.5i) 3-3-1/7.5ii) 3-3-1/9 3-3-1/9.1 3-3-1/9.3 3-3-1/9.3.1 3-3-1/9.3.1(a) 3-3-1/9.3.1(b) 3-3-1/9.3.1(c) 3-3-1/9.3.2 3-3-1/9.3.2(a) 3-3-1/9.3.2(b) 3-3-1/9.3.2(c) 3-3-1/9.3.2(d) 3-3-1/9.3.3 3-3-1/9.3.3(a) 3-3-1/9.3.3(b) 3-3-1/9.3.3(c) 3-3-1/9.3.4 3-3-1/9.5 3-3-1/11 3-3-1/图1 3-3-1/图2 3-3-1/图3A 3-3-1/图3B 3-3-1/图4 3-3-1/图5 第三部分 第三章 附录1 3-3-A1 3-3-A1/1 3-3-A1/3 3-3-A1/5 3-3-A1/5.1 3-3-A1/5.3 3-3-A1/5.5 3-3-A1/7 3-3-A1/7.1 3-3-A1/7.1.1 3-3-A1/7.1.2 3-3-A17/7.3 3-3-A17/7.3.1 3-3-A17/7.3.2 3-3-A17/7.3.3 3-3-A17/7.3.4 3-3-A1/9 3-3-A1/9.1 3-3-A1/9.1.1 3-3-A1/9.1.2 3-3-A1/9.3 3-3-A1/9.3.1 3-3-A1/9.3.2 3-3-2/3.5.3 水面式钻井平台
3-3-2/3.5.3i) 3-3-2/3.5.3ii)
3-3-2/5 水密/风雨密完整性
3-3-2/5.1 风雨密完整性
3-3-2/2.3 水密完整性
3-3-2/5.3.1 漂浮状态下用做通道的内部开口
3-3-2/5.3.1(a) 3-3-2/5.3.1(b) 3-3-2/5.3.1(c)
3-3-2/5.3.2 漂浮状态下保持关闭的内部开口
3-3-2/5.3.2(a) 3-3-2/5.3.2(b) 3-3-2/5.3.2(c) 3-3-2/5.3.2(d)
3-3-2/5.3.3 漂浮状态下使用的外部开口
3-3-2/5.3.3(a) 3-3-2/5.3.3(b) 3-3-2/5.3.3(c)
3-3-2/5.3.4 漂浮状态下保持关闭的外部开口
3-3-2/5.5 渗透
3-3-2/7 船载计算机稳性计算
完整稳性曲线 3-3-2/图1 破舱稳性曲线 3-3-2/图2 柱稳式平台的破舱剩余稳性要求—倾覆 3-3-2/图4A 柱稳式平台的破舱剩余稳性要求—远程水浸 3-3-2/图4B 自升式平台的破舱剩余稳性 3-3-2/图3 柱稳式平台的风雨密完整性最小要求 3-3-2/图5 船体结构和设备 分舱与稳性
柱稳式海上移动钻井平台基于动态响应的完整稳性标准应用指南 柱稳式海上移动钻井平台基于动态响应的完整稳性标准
3-3-A1
应用指南
3-3-A1/1 引言
3-3-A1/3 定义及符号
3-3-A1/5 一般规定
3-3-A1/5.1 范围
3-3-A1/5.3 适用情况
3-3-A1/5.5 动态响应标准
3-3-A1/7 动力响应标准
3-3-A1/7.1 标准
3-3-A1/7.1.1 倾覆
3-3-A1/7.1.2 进水
3-3-A17/7.3 评估的条件
3-3-A17/7.3.1 3-3-A17/7.3.2 3-3-A17/7.3.3 3-3-A17/7.3.4
3-3-A1/9 动力响应的确定
3-3-A1/9.1 经验近似
3-3-A1/9.1.1 最大动力响应角θmax
3-3-A1/9.1.2 进水距离的减少RDFD
3-3-A1/9.3 经验近似方法应用的
3-3-A1/9.3.1 几何参数
3-3-A1/9.3.2 操作参数
42 ABS海上移动平台入级与建造规范·2012
通知与总信息
3-3-A1/9.5 3-3-A1/图1 3-3-A1/图2 第三部分 第三章 附录1a 3-3-A1a 3-3-A1a/1 3-3-A1a/3 第三部分 第三章 附录1b 3-3-A1b 3-3-A1b/1 3-3-A1b/3 3-3-A1b/5 3-3-A1b/5.1 3-3-A1b/5.3 3-3-A1b/5.5 3-3-A1b/5.7 3-3-A1b/5.9 3-3-A1b/7 3-3-A1b/7.1 3-3-A1b/7.3 3-3-A1b/7.5 3-3-A1b/9 3-3-A1b/9i) 3-3-A1b/9ii) 3-3-A1b/9iii) 3-3-A1b/11 3-3-A1b/11i) 3-3-A1b/11ii) 3-3-A1b/11iii) 3-3-A1b/11iv) 第三部分 第三章 附录1c 3-3-A1c 3-3-A1c/1 3-3-A1c/3 3-3-A1c/5 3-3-A1c/5.1 3-3-A1c/5.3 3-3-A1c/图1 第三部分 第三章 附录2 3-3-A2 3-3-A2/1 3-3-A2/1.1 3-3-A2/1.3 3-3-A2/3 3-3-A2/5 3-3-A1/9.5 直接计算
倾覆准则 3-3-A1/图1 进水标准概念 3-3-A1/图2 船体结构和设备 分舱与稳性 算例
3-3-A1a 算例
3-3-A1a/1 倾覆标准评估(米制单位)
3-3-A1a/3 进水标准评估(米制单位)
船体结构和设备 分舱与稳性
动力运动响应的直接分析
3-3-A1b 动力运动响应的直接分析
3-3-A1b/1 一般规定
3-3-A1b/3 分析方法和理论背景
3-3-A1b/5 分析条件
3-3-A1b/5.1 环境条件
3-3-A1b/5.3 艏向
3-3-A1b/5.5 水动力因子
3-3-A1b/5.7 回转半径
3-3-A1b/5.9 系泊布置
3-3-A1b/7 环境的表示方法
3-3-A1b/7.1 风载荷
3-3-A1b/7.3 波浪载荷
3-3-A1b/7.5 流的影响
3-3-A1b/9 分析的结果
3-3-A1b/9i) 3-3-A1b/9ii) 3-3-A1b/9iii)
3-3-A1b/11 模型试验
3-3-A1b/11i) 3-3-A1b/11ii) 3-3-A1b/11iii) 3-3-A1b/11iv) 船体结构和设备 分舱与稳性
环境条件及其表示方法
3-3-A1c 环境条件及其表示方法
3-3-A1c/1 一般规定
3-3-A1c/3 ABS平均测量的风谱
3-3-A1c/5 波谱
3-3-A1c/5.1 风程有限海域
3-3-A1c/5.3 开阔海域
风速和波高出现的联合概率 3-3-A1c/图1 船体结构和设备 分舱与稳性
船载计算机稳性计算 船载计算机稳性计算 3-2-A2
3-2-A2/1 一般规定
3-2-A2/1.1 范围
设计
3-2-A2/3 计算系统
3-2-A2/5 稳性软件类型
ABS海上移动平台入级与建造规范·2012 43
通知与总信息
3-3-A2/7 3-3-A2/7.1 3-3-A2/7.3 3-3-A2/7.5 3-3-A2/7.7 3-3-A2/7.9 3-3-A2/7.11 3-3-A2/7.13 3-3-A2/9 3-3-A2/9.1 3-3-A2/9.3 3-3-A2/11 3-3-A2/11.1 3-3-A2/11.3 3-3-A2/11.5 3-3-A2/13 3-3-A2/15 3-3-A2/17 3-3-A2/19 3-3-A2/表格1 第三部分 第四章 第一节 3-4-1 3-4-1/1 3-4-1/3 3-4-1/5 3-4-1/7 第三部分 第四章 附录1 3-4-A1 3-4-A1/1 3-4-A1/1 .1 3-4-A1/3 3-4-A1/3.1 3-4-A1/3.3 3-4-A1/3.3.1 3-4-A1/3.3.1i) 3-4-A1/3.3.1ii) 3-4-A1/3.3.1iii) 3-4-A1/3.3.2 3-4-A1/3.3.3 3-4-A1/3.3.4 3-4-A1/3.3.4(a) 3-4-A1/3.3.4(b) 3-4-A1/3.3.5 3-4-A1/3.3.5(a) 3-4-A1/3.3.5(b) 3-4-A1/3.3.5(c) 3-4-A1/3.3.5(d) 3-4-A1/3.3.5(e) 3-4-A1/3.3.5(f) 3-2-A2/7 3-2-A2/7.1 3-2-A2/7.3 3-2-A2/7.5 3-3-A2/7.7 3-3-A2/7.9 3-3-A2/7.11 3-3-A2/7.13 3-3-A2/9 3-3-A2/9.1 3-3-A2/9.3 3-3-A2/11 3-3-A2/11.1 3-3-A2/11.3 3-3-A2/11.5 3-3-A2/13 7-1-A2/7 7-2-4/1.1.15 7-2-5/1.9 7-1-A2/9 其他规定
容许偏差 3-3-A2/表格 1
船体结构和设备
设备
定位锚泊系统和设备
3-4-1 定位锚泊系统和设备
3-4-1/1 一般规定
3-4-1/3 临时锚泊设备
3-4-1/5 定位锚泊设备
3-4-1/7 定位锚泊系统
船体结构和设备
设备
定位锚泊系统指南
3-4-A1 定位锚泊系统指南
3-4-A1/1 一般规定
3-4-A1/1.1
3-4-A1/3 锚泊系统
3-4-A1/3.1 一般规定
3-4-A1/3.3 设计
3-4-A1/3.3.1 3-4-A1/3.3.1i) 3-4-A1/3.3.1ii) 3-4-A1/3.3.1iii) 3-4-A1/3.3.2 3-4-A1/3.3.3 3-4-A1/3.3.4 3-4-A1/3.3.4(a) 3-4-A1/3.3.4(b) 3-4-A1/3.3.5
3-4-A1/3.3.5(a) 完整作业
3-4-A1/3.3.5(b) 破损作业
3-4-A1/3.3.5(c) 瞬态作业
3-4-A1/3.3.5(d) 完整自存
3-4-A1/3.3.5(e) 破损自存
3-4-A1/3.3.5(f) 瞬态作业
功能需要求
计算程序
破舱稳性直接计算 警示
数据打印输出 日期和时间 程序信息 平台 容许公差
已认可稳性资料程序计算 稳性评估编程 认可过程
计算机稳性计算的认可条件 总认可(可选) 特殊认可 操作手册 安装试验 定期试验
44 ABS海上移动平台入级与建造规范·2012
通知与总信息
3-4-A1/3.3.6 3-4-A1/3.3.7 3-4-A1/3.3.8 3-4-A1/3.3.9 3-4-A1/5 3-4-A1/5.1 3-4-A1/5.1.1 3-4-A1/5.1.2 3-4-A1/5.1.3 3-4-A1/5.3 3-4-A1/5.3.1 3-4-A1/7 3-4-A1/7.1 3-4-A1/7.3 3-4-A1/7.5 3-4-A1/9 3-4-A1/9.1 3-4-A1/9.3 3-4-A1/11 3-4-A1/11.1 3-4-A1/13 3-4-A1/13.1 3-4-A1/13.3 3-4-A1/13.5 第四部分 第一章 第一节 4-1-1 4-1-1/1 4-1-1/3 4-1-1/5 4-1-1/5.1 4-1-1/5.3 4-1-1/5.5 4-1-1/5.7 4-1-1/7 4-1-1/9 4-1-1/10 4-1-1/10.1 4-1-1/10.3 4-1-1/10.3i) 4-1-1/10.3ii) 4-1-1/11 4-1-1/13 4-1-1/15 4-1-1/17 4-1-1/表 1 4-1-1/表 2 第四部分 第一章 第二节 4-1-2 4-1-2/1
设备
绞车和起锚机
导缆器与滑轮 锚链 锚
质量控制
控制站
机械设备及系统 机械设备及其安装 通则 通则
机械设备 钻井设备 机械认证书 基本要求 型号批准方案 非批量生产设备
一些典型产品的认证细节 倾斜角度
需要递交的图纸与数据
3-4-A1/3.3.6 3-4-A1/3.3.7 3-4-A1/3.3.8 3-4-A1/3.3.9 3-4-A1/5 3-4-A1/5.1 3-4-A1/5.1.1 3-4-A1/5.1.2 3-4-A1/5.1.3 3-4-A1/5.3 3-4-A1/5.3.1 3-4-A1/7 3-4-A1/7.1 3-4-A1/7.3 3-4-A1/7.5 3-4-A1/9 3-4-A1/9.1 3-4-A1/9.3 3-4-A1/11 3-4-A1/11.1 3-4-A1/13 3-4-A1/13.1 3-4-A1/13.3 3-4-A1/13.5
4-1-1, 6-1-1 6-1-1/1.1 6-1-1/1.3 6-1-1/3 6-1-1/3.1 6-1-1/9.5 6-1-1/9.9 6-1-1/3.3 4-1-1/7.1 4-1-2/7 4-3-6/3 电力丧失和瘫船状态
4-1-1/3.11 电力丧失
4-1-1/3.9 瘫船状态
4-1-1/3.9i) 4-1-1/3.9ii)
4-1-1/7.3 瘫船启动
4-1-1/7.5 无人值班舱室
3-1-4/1.9 环境温度
4-1-1/7.7 4-1-1/7.9 含石棉物料
倾斜角度 4-1-1/表 1 无限航区航运的环境温度 4-1-1/表 2
机械设备及系统
机械设备及其安装 旋转电机
4-1-2 旋转电机
无推进设备钻井装置
ABS海上移动平台入级与建造规范·2012 45
通知与总信息
4-1-2/3 4-1-2/3.1 4-1-2/3.1.1 4-1-2/3.1.2 4-1-2/3.3 4-1-2/3.3.1 4-1-2/3.3.2 4-1-2/3.3.3 4-1-2/3.5 4-1-2/3.7 4-1-2/3.9 第四部分 第一章 第三节 4-1-3 4-1-3/1 4-1-3/3 4-1-3/3.1 4-1-3/3.3 4-1-3/3.5 4-1-3/3.7 4-1-3/3.9 4-1-3/3.11 4-1-3/3.13 4-1-3/3.15 4-1-3/5 4-1-3/7 4-1-3/9 4-1-3/9.1 4-1-3/11 4-1-3/13 4-1-3/13.1 4-1-3/13.3 4-1-3/13.5 4-1-3/15 4-1-3/17 4-1-3/19 4-1-3/21 4-1-3/23 4-1-3/25 4-1-3/表格1 第四部分 第一章 第四节 4-1-4 /1 第四部分 第二章 第一节 4-2-1 4-2-1/1 4-2-1/1.1 4-2-1/1.3 4-2-1/1.5 4-1-2/3 钻井作业应用的内燃机
4-1-2/3.1 曲柄轴箱通风
4-1-2/3.1.1 通则
4-1-2/3.1.2 管系布置
4-1-2/3.3 防爆安全阀
4-1-2/3.3.1 通则
4-1-2/3.3.2 安全阀的位置
4-1-2/3.3.3 需要的额外安全阀
4-1-2/3.5 回油集合管的消防系统
4-1-2/3.7 警报装置
4-1-2/3.9 调速器控制
机械设备及系统
机械设备及其安装 升降和相关系统
6-1-9 升降和相关系统
6-1-9/1 通则
6-1-9/3 定义
6-1-9/3.1 升降系统
6-1-9/3.3 控制机制
6-1-9/3.5 齿轮齿条升降系统
6-1-9/3.7 叉架和引脚的升降系统
6-1-9/3.9 固定系统
6-1-9/3.11 指定的作业温度
6-1-9/3.13 升降平台的额定容量
6-1-9/3.15 每根桩腿的起重能力
6-1-9/5 要提交的计划和数据
6-1-9/7 失效模式及影响分析(FMEA)
6-1-9/9 材料
6-1-9/9.1 韧性
6-1-9/11 强度分析
6-1-9/13 机械组件
6-1-9/13.1 轴承
6-1-9/13.3 刹车
6-1-9/13.5 弹性冲击垫
6-1-9/15 电力系统
6-1-9/17 液压系统
6-1-9/19 控制、监测和报警系统
6-1-9/25.1 检验和材料测试
6-1-9/21 低温运行
6-1-9/23 设计新颖的升降系统
冲击强度V型缺口(CVN)影响对钢铁材料的需求 6-1-9/表格 1
机械设备及系统
机械设备及其安装 推进器和动力定位系统
4-1-2/5 推进器和动力定位系统
机械设备及系统
泵和管路系统 通则
4-2-1, 7-1-3 通则
4-2-1/1 一般要求
4-2-1/1.1 破损稳性
4-2-1/1.3 管系的隔离
4-2-1/5 管道组
46 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-2-1/3 4-2-1/3.1 4-2-1/3.3 4-2-1/3.5 4-2-1/5 4-2-5/5.1 4-2-1/5.3 4-2-1/7 4-2-1/7.1 4-2-1/7.3 4-2-1/7.5 4-2-1/7.7 4-2-1/7.7.1 4-2-1/7.7.2 4-2-1/7.7.2(a) 4-2-1/7.7.2(b) 4-2-1/7.7.2(c) 4-2-1/7.7.2(d) 4-2-1/7.7.3 4-2-1/7.9 4-2-1/7.11 4-2-1/7.13 4-2-1/7.15 4-2-1/7.15.1 4-2-1/7.17 4-2-1/7.19 4-2-1/7.21 4-2-1/7.23 4-2-1/7.23.1 4-2-1/7.23.2 4-2-1/7.25 4-2-1/7.27 4-2-1/7.29 4-2-1/7.29.2 4-2-1/7.29.2 第四部分 第二章 第二节 4-2-2 4-2-2/1 4-2-2/1.1 4-2-2/1.3 4-2-2/3 4-2-2/3.1 4-2-2/5 4-2-2/5.1 4-2-2/5.3 4-2-2/5.3.1 4-2-2/5.3.2 4-2-2/5.3.3
4-2-1/7 4-2-1/7.1 4-2-1/7.3 4-2-1/7.5 4-2-1/9 4-2-5/9.1 4-2-1/9.3 4-2-1/11 4-2-1/11.1 7-1-3/11.3 4-2-1/11.3 配电盘附近的管路
7-1-3/11.5 4-2-1/11.5 扩张或收缩应力
7-1-3/11.7 4-2-1/11.7 铸造扩张接头
4-2-1/11.7.1 循环水系统
4-2-1/11.7.2 油路系统
4-2-1/11.7.2(a) 4-2-1/11.7.2(b) 4-2-1/11.7.2(c) 4-2-1/11.7.2(d) 4-2-1/11.7.3 防火性能测试
4-2-1/11.15 防水舱壁、甲板或舱顶的穿透
4-2-1/11.17 防撞舱壁的穿透
4-2-1/11.19 闸式阀和旋塞
4-2-1/11.21 安全阀
4-2-1/11.21.1 例外
4-2-1/11.23 共同舷外排放
4-2-1/11.25 遥控作业
4-2-1/3.9 标准或超重管路
4-2-1/11.27 器械
4-2-1/11.27.1 温度
4-2-1/11.27.2 压强
4-2-1/11.29 软管
4-2-1/11.31 静电控制
7-1-3/11.29 4-2-1/11.33 泄漏控制
4-2-1/11.33.1 油泄漏
4-2-1/11.33.2 锅炉底板
机械设备及系统
泵和管路系统
泵系、管系、阀门及管附件
4-2-2, 6-1-1 ,7-1-3 泵系、管系、阀门及管附件
4-2-2/1 通则
4-2-2/1.1 工作条件
4-2-2/1.3 阀门、管附件和法兰的标准
6-1-6/7.3.2 泵机
6-1-6/7.3.2 一般要求
4-2-2/5 金属管系
6-1-6/7.1 组I管系的测试与检验
4-2-2/5.1 钢制管
无缝钢管
焊接管
4-2-2/5.1.1 燃
应提交的图纸和资料
图纸
所有管路系统 标准详细资料册 材料测试和检测 说明书和订购单 特殊材料 一般装配细则 保护
ABS海上移动平台入级与建造规范·2012 47
通知与总信息
4-2-2/5.5 4-2-2/5.7 4-2-2/5.9 4-2-2/5.9.1 4-2-2/5.9.2 铜管 黄铜管 设计
最大许用工作压强和最小厚度 管子弯头
4-2-2/5.11 工作压强和厚度-供选择的事项 4-2-2/7 塑胶管 4-2-2/7.1 通则 4-2-2/7.3 需要提交的图纸与数据 4-2-2/7.3.1 一般信息 4-2-2/7.3.2 制图与支持文件 4-2-2/7.3.3 材料 4-2-2/7.5 设计 4-2-2/7.5.1 内部压强 4-2-2/7.5.2 外部压强 4-2-2/7.5.3 轴向强度 4-2-2/7.5.3(a) 4-2-2/7.5.3(b) 4-2-2/7.5.4 温度 4-2-2/7.5.5 冲击耐受力 4-2-2/7.5.6 耐火性 4-2-2/7.5.6i) 4-2-2/7.5.6ii) 4-2-2/7.5.6iii) 4-2-2/7.5.6i) 4-2-2/7.5.6ii) 4-2-2/7.5.6iii) 4-2-2/7.5.6iv)
4-2-2/7.5.6v) 4-2-2/7.5.7 展焰性 4-2-2/7.5.7(a) 塑胶管 4-2-2/7.5.7(b) 塑胶材料包护的多芯金属管 4-2-2/7.5.8 导电性 4-2-2/7.5.8(a) 4-2-2/7.5.8(b) 4-2-2/7.5.8(c)
4-2-2/7.5.8(d) 4-2-2/7.5.9 4-2-2/7.7 4-2-2/7.7.1 4-2-2/7.7.1(a) 4-2-2/7.7.1(b) 4-2-2/7.7.1(c) 4-2-2/7.7.1(d) 4-2-2/7.7.1(e) 4-2-2/7.7.2 4-2-2/7.7.3 4-2-2/7.7.3(a) 4-2-2/7.7.3(b) 4-2-2/7.7.3(c) 4-2-2/7.7.3(d) 4-2-2/7.7.4
标志 塑胶管的安装 支架
外载荷 塑胶管连接
导电性
4-2-2/5.3 4-2-2/5.5 4-2-2/5.7 4-2-2/5.7.1 4-2-2/5.7.2 7-1-3/11.1 4-2-2/5.9 4-2-2/7 4-2-2/7.1 4-2-2/7.3 4-2-2/7.3.1 4-2-2/7.3.2 4-2-2/7.3.3 4-2-2/7.5 4-2-2/7.5.1 4-2-2/7.5.2 4-2-2/7.5.3 4-2-2/7.5.3(a) 4-2-2/7.5.3(b) 4-2-2/7.5.4 4-2-2/7.5.5 4-2-2/7.5.6 4-2-2/7.5.6i) 4-2-2/7.5.6ii) 4-2-2/7.5.6iii) 4-2-2/7.5.6i) 4-2-2/7.5.6ii) 4-2-2/7.5.6iii) 4-2-2/7.5.6iv) 4-2-2/7.5.6v) 4-2-2/7.5.7 4-2-2/7.5.7(a) 4-2-2/7.5.7(b) 4-2-2/7.5.8 4-2-2/7.5.8(a) 4-2-2/7.5.8(b) 4-2-2/7.5.8(c) 7-1-3/13.5.3iv) 4-2-2/7.5.8(d) 4-2-2/7.5.9 7-1-3/13.5.2 4-2-2/7.7 4-2-2/7.7.1 4-2-2/7.7.1(a) 7-1-3/13.5.3i) 7-1-3/13.5.3i) 4-2-2/7.7.1(b) 4-2-2/7.7.1(c) 4-2-2/7.7.2 7-1-3/13.5.2 7-1-3/13.5.3iii) 7-1-3/13.5.3iii) 7-1-3/13.5.3iii) 7-1-3/13.5.3iii) 7-1-3/13.5.3iii) 7-1-3/13.5.3iv)
48 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-2-2/7.7.4(a) 4-2-2/7.7.4(b) 4-2-2/7.7.5 外壳板的连接 4-2-2/7.7.6 舱壁与甲板的穿透 4-2-2/7.7.6(a) 4-2-2/7.7.6(b) 4-2-2/7.7.6(c) 4-2-2/7.7.7 防火保护涂层的应用 4-2-2/7.9 塑胶管的制造 4-2-2/7.11 塑胶管连接过程鉴定 4-2-2/7.11.1 过程鉴定要求 4-2-2/7.11.1(a) 4-2-2/7.11.1(a)i) --- 4-2-2/7.11.1(a)ii) 4-2-2/7.11.1(a)iii) 4-2-2/7.11.1(a)iv)
4-2-2/7.11.1(a)v) --- 4-2-2/7.11.1(a)vi) 4-2-2/7.11.1(a)vii) 4-2-2/7.11.1(b) 4-2-2/7.11.2 过程鉴定测试 4-2-2/7.11.2(a) 4-2-2/7.11.2(b) 4-2-2/7.11.2(b)i) --- 4-2-2/7.11.2(b)ii) 4-2-2/7.11.2(c)
制造方的测试—干燥条件下塑胶管系的耐火性测试(针对
4-2-2/7.13
L1 和 L2)
4-2-2/7.13.1 测试方法 4-2-2/7.13.1(a) 4-2-2/7.13.1(b) 4-2-2/7.13.1(b)i) --- 4-2-2/7.13.1(b)ii) 4-2-2/7.13.1(b)iii) 4-2-2/7.13.1(b)iv) 4-2-2/7.13.1(c) 4-2-2/7.13.2 测试样品 4-2-2/7.13.2(a) 4-2-2/7.13.2(b) 4-2-2/7.13.2(c) 4-2-2/7.13.2(d) 4-2-2/7.13.2(e) 4-2-2/7.13.2(f) 4-2-2/7.13.3 测试条件 4-2-2/7.13.4 验收准则 4-2-2/7.13.4(a) 4-2-2/7.13.4(b) 4-2-2/7.13.4(c)
制造方的测试– 盛水塑胶管系的耐火性测试(针对 L 3) 4-2-2/7.15 4-2-2/7.15.1
4-2-2/7.15.1(a) 4-2-2/7.15.1(b) 4-2-2/7.15.1(c) 4-2-2/7.15.1(d) 4-2-2/7.15.1(e) 4-2-2/7.15.2 4-2-2/7.15.2(a)
测试方法
测试样本
7-1-3/13.5.3iv) 7-1-3/13.5.3iv) 4-2-2/7.7.3 4-2-2/7.7.4 4-2-2/7.7.4(a) 4-2-2/7.7.4(b) 4-2-2/7.7.4(c) 7-1-3/13.5.3vii) 4-2-2/7.9 4-2-2/7.11 4-2-2/7.11.1 4-2-2/7.11.1(a) 4-2-2/7.11.1(a)i) 4-2-2/7.11.1(a)ii) 4-2-2/7.11.1(a)iii) 4-2-2/7.11.1(a)iv) 4-2-2/7.11.1(a)v) 4-2-2/7.11.1(a)vi) 4-2-2/7.11.1(a)vii) 4-2-2/7.11.1(b) 4-2-2/7.11.2 4-2-2/7.11.2(a) 4-2-2/7.11.2(b) 4-2-2/7.11.2(b)i) 4-2-2/7.11.2(b)ii) 4-2-2/7.11.2(c) 4-2-2/7.13 4-2-2/7.13.1 4-2-2/7.13.1(a) 4-2-2/7.13.1(b) 4-2-2/7.13.1(b)i) 4-2-2/7.13.1(b)ii) 4-2-2/7.13.1(b)iii) 4-2-2/7.13.1(b)iv) 4-2-2/7.13.1(c) 4-2-2/7.13.2 4-2-2/7.13.2(a) 4-2-2/7.13.2(b) 4-2-2/7.13.2(c) 4-2-2/7.13.2(d) 4-2-2/7.13.2(e) 4-2-2/7.13.2(f) 4-2-2/7.13.3 4-2-2/7.13.4 4-2-2/7.13.4(a) 4-2-2/7.13.4(b) 4-2-2/7.13.4(c) 4-2-2/7.15 4-2-2/7.15.1 4-2-2/7.15.1(a) 4-2-2/7.15.1(b) 4-2-2/7.15.1(c) 4-2-2/7.15.1(d) 4-2-2/7.15.1(e) 4-2-2/7.15.2 4-2-2/7.15.2(a)
ABS海上移动平台入级与建造规范·2012 49
通知与总信息
4-2-2/7.15.2(b) 4-2-2/7.15.2(c) 4-2-2/7.15.2(d) 4-2-2/7.15.2(e) 4-2-2/7.15.2(f) 4-2-2/7.15.2(g) 4-2-2/7.15.3 4-2-2/7.15.3(a) 4-2-2/7.15.3(b) 4-2-2/7.15.3(c) 4-2-2/7.15.4 4-2-2/7.15.4(a) 4-2-2/7.15.4(b) 4-2-2/7.17 4-2-2/7.17.1 4-2-2/7.17.1(a) 4-2-2/7.17.1(b) 4-2-2/7.17.1(c) 4-2-2/7.17.1(d) 4-2-2/7.17.1(e) 4-2-2/7.17.1(f) 4-2-2/7.17.1(g) 4-2-2/7.17.1(h) 4-2-2/7.17.1(i) 4-2-2/7.19 4-2-2/9 4-2-2/9.1 4-2-2/9.1.1 4-2-2/9.1.2 4-2-2/9.3 4-2-2/9.5 4-2-2/11 4-2-2/11.1 4-2-2/11.3 4-2-2/11.5 4-2-2/11.7 4-2-2/13 4-2-2/15 4-2-2/15.1 4-2-2/15.3 4-2-2/15.3.1 4-2-2/15.3.2 4-2-2/15.5 4-2-2/17 4-2-2/17.1 4-2-2/17.3 4-2-2/17.5 4-2-2/17.7 4-2-2/17.9 4-2-2/19 4-2-2/19.1 4-2-2/19.3 4-2-2/19.3i) 4-2-2/19.3ii) 4-2-2/19.3iii) 4-2-2/7.15.2(b) 4-2-2/7.15.2(c) 4-2-2/7.15.2(d) 4-2-2/7.15.2(e) 4-2-2/7.15.2(f) 4-2-2/7.15.2(g)
4-2-2/7.15.3 测试条件
4-2-2/7.15.3(a) 4-2-2/7.15.3(b) 4-2-2/7.15.3(c)
4-2-2/7.15.4 验收准则
4-2-2/7.15.4(a) 4-2-2/7.15.4(b)
4-2-2/7.17 制造方进行的测试——展焰性
4-2-2/7.17.1 测试方法
4-2-2/7.17.1(a) 4-2-2/7.17.1(b) 4-2-2/7.17.1(c) 4-2-2/7.17.1(d) 4-2-2/7.17.1(e) 4-2-2/7.17.1(f) 4-2-2/7.17.1(g) 4-2-2/7.17.1(h) 4-2-2/7.17.1(i)
4-2-2/7.19 制造方进行的测试 – 通则
4-2-2/9 阀门
4-2-2/9.1 通则
4-2-2/9.1.1 标准阀门
4-2-2/9.1.2 非标准阀门
4-2-2/9.3 结构
4-2-2/9.5 静水力测试和鉴定
4-2-2/11 管附件
4-2-2/11.1 通则
4-2-2/11.3 静水力测试鉴定
4-2-2/11.5 非标准附件
7-1-3/17.5 机械接头
4-2-2/13 焊接非标准阀及附件
4-2-2/15 法兰
4-2-2/15.1 通则
4-2-2/15.3 组 I 管系法兰
4-2-2/15.3.1 钢管
4-2-2/15.3.2 非铁管
4-2-2/15.5 组 II 管系法兰
4-2-2/17 阀门及其附件的材质
4-2-2/17.1 通则
4-2-2/17.3 锻钢或铸钢
4-2-2/17.5 铸铁
4-2-2/17.7 非铁质
4-2-2/17.9 球墨铸铁
4-2-2/19 液压动力油缸
4-2-2/19.1 通则
4-2-2/19.3 不遵守公认的标准
4-2-2/19.3.3i) 4-2-2/19.3.3ii) 4-2-2/19.3iii) 50 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-2-2/19.5 4-2-2/19.5i) 4-2-2/19.5ii) 4-2-2/19.5iii) 4-2-2/19.7 4-2-2/19.9 4-2-2/19.11 4-2-2/21 4-2-2/21.1 4-2-2/21.3 4-2-2/21.5 4-2-2/21.7 4-2-2/21.9 4-2-2/21.9i) 4-2-2/21.9ii) 4-2-2/21.9iii) 4-2-2/21.9.1 4-2-2/21.9.2 4-2-2/21.9.3 4-2-2/21.11 4-2-2/23 4-2-2/23.1 4-2-2/23.1.1 4-2-2/23.1.2 4-2-2/23.1.3 4-2-2/23.3 4-2-2/23.5 4-2-2/27 4-2-2/27.1 4-2-2/27.3 4-2-2/27.5 4-2-2/29 4-2-2/29.1 4-2-2/29.1i) 4-2-2/29.1ii) 4-2-2/29.3 4-2-2/29.3.1 4-2-2/29.3.2 4-2-2/表1 4-2-2/表2 4-2-2/表3 4-2-2/表4 4-2-2/图1 4-2-2/图2 第四部分 第二章 第三节 4-2-3 4-2-3/1 4-2-3/1.1 4-2-3/1.3 4-2-3/1.5 4-2-3/1.5.1
材料
方向舵执行器
在4-2-2/19.1的压力和温度以下的液压缸 制造和装配装置 海水入口及舷外排放 安装
阀门与壳体的连接 材料
壳体加强
海水进水阀及排出阀
4-2-2/19.5 4-2-2/19.5i) 4-2-2/19.5ii) 4-2-2/19.5iii) 4-2-2/19.7 4-2-2/19.9 4-2-2/19.11 4-2-2/21 4-2-2/21.1 4-2-2/21.3 4-2-2/21.5 4-2-2/21.7
4-2-2/21.9 7-1-3//23.3 7-1-3//23.3i) 7-1-3//23.3ii) 7-1-3//23.3iii)
4-2-2/21.9.1 柱稳式平台
4-2-2/21.9.2 自升和表面型平台
4-2-2/21.9.3 自升平台
4-2-2/21.11 通海阀箱
4-2-2/23 表面型和自升降型机构的排水孔和排水管
4-2-2/23.1 通过外板的排放管系
4-2-2/23.1.1 4-2-2/23.1.2 4-2-2/23.1.3
4-2-2/23.3 干舷甲板下的排水孔和排水 – 壳板穿透
4-2-2/23.5 上层建筑和甲板舱的排水孔
4-2-2/27 船体外部的冷却装置
4-2-2/27.1 通则
4-2-2/27.3 一体龙骨冷却装置
4-2-2/27.5 非一体龙骨冷却装置
4-2-2/29 水密边界的穿透
4-2-2/29.1 通风系统
4-2-2/29.1i) 4-2-2/29.1ii)
4-2-2/29.3 内部排水系统
--- 4-2-2/29.3.1 --- 4-2-2/29.3.2 管系许用应力值 S N/mm2 4-2-2/表1 耐火性要求矩阵 4-2-2/表2 塑胶管标准–对所有系统的典型要求 4-2-2/表3 塑胶管标准 – 根据关系工作内容和/或位置
4-2-2/表4
提出的附加要求
耐火性测试的燃烧器装置 4-2-2/图1 样本已安装好的耐火性测试试验台 4-2-2/图2
机械设备及系统
泵和管路系统
舱柜的通风口和溢流
4-2-3 液舱通风和溢流
4-2-4/1 液舱通风和溢流
4-2-4/1.1 通则
4-2-4/1.3 累进进水需要注意的事项
4-2-4/1.5 通风管的高度和壁厚
4-2-3/1.5.1 暴露在空气中的通风口
ABS海上移动平台入级与建造规范·2012 51
通知与总信息
4-2-3/1.5.2 不暴露在空气中的通风口 4-2-3/1.7 尺寸 4-2-3/1.9 通风管的终端端口 4-2-3/1.9.1 干舷甲板上的终端端口 4-2-3/1.9.2 机舱上的终端端口 4-2-3/1.9.3 燃油舱柜和润滑舱柜的防护 4-2-3/1.9.4 燃油舱柜通风管出口 4-2-3/1.9.5 关闭装置通风管出口 4-2-3/1.9.5(a) 通则 4-2-3/1.9.5(b) 设计
4-2-3/1.9.5(b)i)
4-2-3/1.9.5(b)ii)
4-2-3/1.9.5(b)iii)
4-2-3/1.9.5(b)iv)
4-2-3/1.9.5(b)v)
4-2-3/1.9.5(b)vi)
4-2-3/1.9.5(b)vii)
4-2-3/1.9.5(b)viii)
4-2-3/1.9.5(b)ix)
4-2-3/1.9.5(c) 材料 4-2-3/1.9.5(c)i) 4-2-3/1.9.5(c)ii) 4-2-3/1.9.5(c)iii) 4-2-3/1.9.5(c)iv) 4-2-3/1.9.5(d) 型式检测 4-2-3/1.9.5(d)i) 4-2-3/1.9.5(d)ii)
4-2-3/1.9.5(d)iii)
4-2-3/1.11 溢流管
探测装置 4-2-3/3
4-2-3/3.1 通则 4-2-3/3.3 探测管 4-2-3/3.3.1 油舱柜 4-2-3/3.3.2 其它舱柜 4-2-3/3.3.3 溢出物的点燃 4-2-3/3.3.3(a) 燃油舱柜 4-2-3/3.3.3(a) i) 4-2-3/3.3.3(a)ii)
4-2-3/3.3.3(a)iii) 4-2-3/3.3.3(b) 润滑油舱柜 4-2-3/3.3.3(b)i) 4-2-3/3.3.3(b)ii) 4-2-3/3.5 玻璃液面计 4-2-3/3.7 液面指示设备 第四部分 机械设备及系统 第二章 泵和管路系统
舱底和压载系统和舱柜 第四节
4-2-4 舱底和压载系统,通风和溢流 4-2-4/1 表面型平台的舱底和压载系统的总布置 4-2-4/1.1 通则 4-2-4/1.3 舱底泵的数量 4-2-4/1.5 舱底水直接吸口 4-2-4/1.7 舱底水应急吸口 4-2-4/3 柱稳式平台和自升式平台的舱底系统总布置 4-2-4/3.1 永久系统
4-2-3/1.5.2 4-2-4/1.7
4-2-4/1.9 4-2-4/1.9.1 4-2-4/1.9.2 4-2-3/1.9.3 4-2-3/1.9.4 4-2-3/1.9.5 4-2-3/1.9.5(a) 4-2-3/1.9.5(b) 4-2-3/1.9.5(b)i) 4-2-3/1.9.5(b)ii) 4-2-3/1.9.5(b)iii) 4-2-3/1.9.5(b)iv) 4-2-3/1.9.5(b)v) 4-2-3/1.9.5(b)vi) 4-2-3/1.9.5(b)vii) 4-2-3/1.9.5(b)viiii) 4-2-3/1.9.5(b)ix) 4-2-3/1.9.5(c)
4-2-3/1.9.5(c)i) 4-2-3/1.9.5(c)ii) 4-2-3/1.9.5(c)iii) 4-2-3/1.9.5(c)iv) 4-2-3/1.9.5(d)
4-2-3/1.9.5(d)i) 4-2-3/1.9.5(d)ii) 4-2-3/1.9.5(d)iii) 4-2-3/1.11 4-2-4/3 4-2-4/3.1 4-2-4/3.3 4-2-3/3.3.1 4-2-3/3.3.2 4-2-3/3.3.3 4-2-3/3.3.3(a) 4-2-3/3.3.3(a)i) 4-2-3/3.3.3(a)ii)
4-2-3/3.3.3(a)iii) 4-2-3/3.3.3(b)
4-2-3/3.3.3(b)i) 4-2-3/3.3.3(b)ii) 4-2-4/3.5 4-2-4/3.7
4-2-4 4-2-4/1 4-2-5/1.1 4-2-4/1.3 4-2-4/1.5 4-2-4/1.7 4-2-4/3 4-2-4/3.1
52 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-2-4/3.3 4-2-4/3.5 4-2-4/3.7 4-2-4/5 4-2-4/5.1 4-2-4/5.3 空舱室 锚链舱
舱底警报系统
舱底管系(所有平台) 通则 安装 4-2-4/3.3 4-2-4/3.5 4-2-4/3.7 4-2-4/5 4-2-4/5.1 4-2-4/5.3
4-2-4/5.5 4-2-4/5.7 4-2-4/5.9 4-2-4/5.11 4-2-4/5.13 4-2-4/5.15 4-2-4/7 4-2-4/7.1 4-2-4/7.3 4-2-4/9 4-2-4/9.1 4-2-4/9.1.1 4-2-4/9.1.2 4-2-4/9.1.3 4-2-4/9.1.4 4-2-4/9.3 4-2-4/9.3.1 4-2-4/9.3.2 4-2-4/9.3.3 4-2-4/1 1 4-2-4/11.1 4-2-4/11.3 4-2-4/11.5 4-2-4/11.7 4-2-4/13 4-2-4/13.1
4-2-4/13.1i) 4-2-4/13.1ii) 4-2-6/13.3 4-2-6/13.5 4-2-4/13.5.1 4-2-4/13.5.2 4-2-6/3.7 4-2-6/3.7.1 4-2-4/13.7.1(a) 4-2-4/13.7.1(b) 4-2-4/13.7.1(b) i) 4-2-4/13.7.1(b)ii) 4-2-4/13.7.1(b)iii) 4-2-4/13.7.1(b)iv) 4-2-4/13.7.1(b) v) 4-2-4/13.7.1(b)vi) 4-2-4/13.7.1(b)vii) 4-2-4/13.7.1(b)viii) 4-2-4/13.7.1(b)ix) 4-2-4/13.7.1(b)x) 4-2-4/13.7.1(b)xi)
4-2-4/5.5
集合管、旋塞和阀门
4-2-4/5.7总管型舱底系统
4-2-4/5.9过滤器
4-2-4/5.11重力式排水
4-2-4/5.13危险区域的舱底抽水管路
4-2-4/5.15例外 4-2-4/7 舱底泵系 (所有平台) 4-2-4/7.1 通则 4-2-4/7.3 布置和流量 4-2-4/9 舱底抽水管的尺寸 4-2-4/9.1 表面型平台 4-2-4/9.1.1 主管路 4-2-4/9.1.2 分支管路 4-2-4/9.1.3 主管削减 4-2-4/9.1.4 尺寸 4-2-4/9.3 柱稳式平台和自升式平台 4-2-4/9.3.1 主管路 4-2-4/9.3.2 分支管路 4-2-4/9.3.3 尺寸 4-2-4/11 压载管系 (所有平台) 4-2-4/11.1 通则 4-2-4/11.3 安装 4-2-4/11.5 压载舱柜阀门的控制 4-2-4/11.7 例外 4-2-4/13 柱稳式平台的压载系统 4-2-4/13.1 通则
4-2-4/13.1i) 4-2-4/13.1ii) 4-2-4/13.3 集合管 4-2-4/13.5 泵机 4-2-4/13.5.1 数量 4-2-4/13.5.2 泵的性能 4-2-4/13.7 压载控制设施 4-2-4/13.7.1 控制站 4-2-4/13.7.1(a) 位置 4-2-4/13.7.1(b) 控制和指示设备
4-2-4/13.7.1(b)i)
4-2-4/13.7.1(b)ii)
4-2-4/13.7.1(b)iii)
4-2-4/13.7.1(b)iv)
4-2-4/13.7.1(b)v)
4-2-4/13.7.1(b)vi)
4-2-4/13.7.1(b)vii)
4-2-4/13.7.1(b)viii) 4-2-4/13.7.1(b)ix)
4-2-4/13.7.1(b)x)
4-2-4/13.7.1(b)xi)
ABS海上移动平台入级与建造规范·2012 53
通知与总信息
4-2-4/13.7.1(c) 4-2-4/13.7.1(d) 4-2-4/13.7.2 4-2-4/13.7.3 4-2-4/13.7.3(a) 4-2-4/13.7.3(a)i) 4-2-4/13.7.3(a)ii) 4-2-4/13.7.3(b) 4-2-4/13.7.3(c) 4-2-4/13.7.3(d) 4-2-4/13.7.3(e) 4-2-4/13.7.4 4-2-4/13.7.5 4-2-4/13.7.6 第四部分 第二章 第五节 4-2-5 4-2-5/1 4-2-5/1.1 4-2-5/1.1.1 4-2-5/1.1.1(a) 4-2-5/1.1.1(b) 4-2-5/1.1.2 4-2-5/1.1.3 4-2-5/1.1.4 通讯. 备用工位
的本地控制 安全设施 性 所有系统
泵机/阀门控制系统 双动力源 拆分 电力系统 阀门控制
阀门位置指示系统 吃水指示系统
液舱柜液面指示系统 机械设备及系统 泵和管路系统 燃油系统和舱柜
燃油系统,其他管路系统和舱柜 燃系 – 通则 设备 液舱柜 结构舱柜
自支式液货舱柜 燃油溢出 测深布置
服务和沉淀舱柜
4-2-4/13.7.1(c) 4-2-4/13.7.1(d) 4-2-6/3.7.2 4-2-6/3.7.3 4-2-4/13.7.3(a) 4-2-4/13.7.3(a)i) 4-2-4/13.7.3(a)ii) 4-2-4/13.7.3(b) 4-2-4/13.7.3(c) 4-2-4/13.7.3(d) 4-2-4/13.7.3(e) 4-2-6/3.7.4 4-2-4/13.7.5 4-2-4/13.7.6
MODU 2008 管系、阀门及附件 4-2-5/1.3 油热设备 4-2-5/1.5 油加热器 4-2-5/1.5.1 液舱 4-2-5/1.5.2 燃油净化器 4-2-5/1.7 燃油输运及填充 4-2-5/3 通则 4-2-5/3.1 加热盘管 4-2-5/3.3 油舱柜的管路 4-2-5/3.5 控制阀门或旋塞 4-2-5/3.7 油舱柜的阀门 4-2-5/3.9 4-2-5/3.9i) 4-2-5/3.9ii) 4-2-5/3.9iii) 锅炉的燃油服务系统 4-2-5/5 内燃机的燃油服务系统 4-2-5/7 燃油泵和油加热机 4-2-5/7.1 输送泵 4-2-5/7.1.1 增压泵 4-2-5/7.1.2 加热器 4-2-5/7.1.3 燃油系统的油舱柜和排水槽 4-2-5/7.3 燃油压力管系 4-2-5/7.5 燃油注入系统 4-2-5/7.7 通则 4-2-5/7.7.1 注入管与注入器之间的管系 4-2-5/7.7.2 注入管系
4-2-5, 6-1-3
4-2-5/1 4-2-5/1.1 4-2-5/1.1.1 4-2-5/1.1.1(a) 4-2-5/1.1.1(b) 4-2-5/1.1.2 4-2-5/1.1.3 4-2-5/1.1.4 4-2-3/1.9.3 MODU 2012 4-2-5/1.3 4-2-5/1.5 4-2-5/1.5.1 4-2-5/1.5.2 4-2-5/1.7 4-2-5/3 4-2-5/3.1 4-2-5/3.3 4-2-5/3.5 4-2-5/3.7 4-2-5/3.9 4-2-5/3.9i) 4-2-5/3.9ii) 4-2-5/3.9iii) 4-2-5/5 4-2-5/7 4-2-5/7.1 4-2-5/7.1.1 4-2-5/7.1.2 4-2-5/7.1.3 4-2-5/7.3 4-2-5/7.5 4-2-5/7.7 4-2-5/7.7.1 4-2-5/7.7.2 6-1-3/3.1 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-2-5/7.7.2(a) 6-1-3/3.1.1 燃油回路 4-2-5/7.7.2(b) 6-1-3/3.1.2 升压泵与注入泵之间的管系 4-2-5/7.9 4-2-5/7.9 低燃点燃油 4-2-5/9 4-2-5/9 通则
4-2-5/9.1 4-2-5/9.1 4-2-5/9.1.1 4-2-5/9.1.1 4-2-5/9.1.2 4-2-5/9.1.2 4-2-5/9.1.3 4-2-5/9.1.3 燃油加热 4-2-5/9.3 4-2-5/9.3 燃油舱柜通风 4-2-5/9.5 4-2-5/9.5 燃油溢出 4-2-5/11 4-2-5/11 额外的防油污措施 4-2-5/11.1 4-2-5/11.1 通则 4-2-5/11.1.1 4-2-5/11.1.1 应用 4-2-5/11.1.2 4-2-5/11.1.2 提交的计划 4-2-5/11.3 4-2-5/11.3 舱柜防护要求 4-2-5/11.3.1 4-2-5/11.3.1 通则 4-2-5/11.3.2 4-2-5/11.3.2 舱柜的防护位置 4-2-5/11.3.2(a) 4-2-5/11.3.2(a) 确定性方法 4-2-5/11.3.2(a)i) --- 4-2-5/11.3.2(a)i) 4-2-5/11.3.2(a)ii) --- 4-2-5/11.3.2(a)ii) 4-2-5/11.3.2(a)iii) --- 4-2-5/11.3.2(a)iii) 4-2-5/11.3.2(a)iv) --- 4-2-5/11.3.2(a)iv) 4-2-5/11.3.2(b) 4-2-5/11.3.2(b) 概率方法 4-2-5/13 4-2-5/13 船级符号– POT 4-2-5/13i) --- 4-2-5/13i) 4-2-5/13ii) --- 4-2-5/13ii) 4-2-5/Figure 1 4-2-5/Figure 1 A类机械场所内燃油舱柜布置的验收
第四部分 机械设备及系统 第二章 泵和管路系统 第五节 其他管路系统和舱柜 4-2-6 4-2-6 其他管路系统和舱柜
滑油系统 4-2-6/1 4-2-6/1
4-2-6/1.1 4-2-6/1.1 一般规定 4-2-6/1.3 4-2-6/1.3 流动观察玻璃窗 4-2-6/1.5 4-2-6/1.5 涡轮机和减速装置 4-2-6/1.7 4-2-6/1.7 内燃机和减速装置 4-2-6/1.7.1 4-2-6/1.7.1 滑油泵 4-2-6/1.7.2 4-2-6/1.7.2 过滤器 4-2-6/1.7.3 4-2-6/1.7.3 低油压警报 4-2-6/1.7.4 4-2-6/1.7.4 排水管 4-2-6/1.9 4-2-6/1.9 电机 4-2-6/3 4-2-6/3 液压系统 4-2-6/3.1 4-2-6/3.1 一般规定 4-2-6/3.3 4-2-6/3.3 阀门 4-2-6/3.3.1 4-2-6/3.3.1 一般规定 4-2-6/3.3.2 4-2-6/3.3.2 卸压阀 4-2-6/3.5 4-2-6/3.5 管道 4-2-6/3.7 4-2-6/3.7 管道配件 4-2-6/3.7.1 4-2-6/3.7.1 非标准配件 4-2-6/3.7.2 4-2-6/3.7.2 对开式法兰 4-2-6/3.7.3 4-2-6/3.7.3 圆形截面直螺纹接头 4-2-6/3.7.4 4-2-6/3.7.4 锥形螺纹接头 4-2-6/3.9 4-2-6/3.9 软管 4-2-6/3.11 4-2-6/3.11 蓄电器
ABS海上移动平台入级与建造规范·2012 55
通知与总信息
4-2-6/3.13 液压缸 4-2-6/3.15 设计压力 4-2-6/3.17 高压液压机构的分离 4-2-6/5 固定氧炔装置 4-2-6/5.1 应用 4-2-6/5.3 气体贮藏 4-2-6/5.3.1 汽缸的贮存 4-2-6/5.3.1(a) 贮藏室 4-2-6/5.3.1(b) 开阔区域 4-2-6/5.3.1(c) 穿过贮存室或场地的管系 4-2-6/5.3.2 贮藏室的通风 4-2-6/5.3.3 贮藏室的电力装置 4-2-6/5.5 管系部件 4-2-6/5.5.1 管子和附件 4-2-6/5.5.1(a) 通则 4-2-6/5.5.1(b) 管系材料 4-2-6/5.5.1(c) 设计压强 4-2-6/5.5.1(d) 管接头 4-2-6/5.5.1(e) 柔性软管 4-2-6/5.5.2 压力安全装置 4-2-6/5.5.3 系统装置 4-2-6/5.5.4 汽缸 4-2-6/7 直升飞机设备的燃油贮存 4-2-6/7.1 通则 4-2-6/7.1.1 隔离 4-2-6/7.1.2 危险区域 4-2-6/7.1.2(a) 通风流量 4-2-6/7.1.2(b) 排气通风道和扇 4-2-6/7.1.2(c) 去水系统 4-2-6/7.1.3 燃油贮藏舱结构 4-2-6/7.1.4 燃油贮藏舱通风 4-2-6/7.1.5 燃油贮存舱阀门 4-2-6/7.3 溢出容器 4-2-6/7.3.1 4-2-6/7.3.2 4-2-6/7.3.3 4-2-6/9 启动气系统 4-2-6/9.1 设计和结构 4-2-6/9.3 启动空气容量 4-2-6/9.3.1 柴油推进器 4-2-6/9.3.2 柴电组合推进器 4-2-6/9.3.3 非自航式平台 4-2-6/9.5 启动气管路保护装置 4-2-6/11 内燃机冷却水系统 4-2-6/11.1 通则 4-2-6/11.3 海水抽水管 4-2-6/11.5 过滤器 4-2-6/11.7 循环水泵 4-2-6/13 排气系统 4-2-6/13.1 排气管路 4-2-6/13.3 排气温度 4-2-6/15 雾化管路阀门 4-2-6/17 直升机甲板排水布置 4-2-6/3.13
4-2-6/3.15 4-2-6/3.17 4-2-6/5 4-2-6/5.1 4-2-6/5.3 4-2-6/5.3.1 4-2-6/5.3.1(a) 4-2-6/5.3.1(b) 4-2-6/5.3.1(c) 4-2-6/5.3.2 4-2-6/5.3.3 4-2-6/5.5 4-2-6/5.5.1 4-2-6/5.5.1(a) 4-2-6/5.5.1(b) 4-2-6/5.5.1(c) 4-2-6/5.5.1(d) 4-2-6/5.5.1(e) 4-2-6/5.5.2 4-2-6/5.5.3 4-2-6/5.5.4 4-2-6/7 4-2-6/7.1 4-2-6/7.1.1 4-2-6/7.1.2 4-2-6/7.1.2(a) 4-2-6/7.1.2(b) 4-2-6/7.1.2(c) 4-2-6/7.1.3 4-2-6/7.1.4 4-2-6/7.1.5 4-2-6/7.3
4-2-6/7.3.1 4-2-6/7.3.2 4-2-6/7.3.3 4-2-6/9 4-2-6/9.1 4-2-6/9.3 4-2-6/9.3.1 4-2-6/9.3.2 4-2-6/9.3.3 4-2-6/9.5 4-2-6/11 4-2-6/11.1 4-2-6/11.3 4-2-6/11.5 4-2-6/11.7 4-2-6/13 4-2-6/13.1 4-2-6/13.3 4-2-6/15 4-2-6/17
56 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-2-6/19 4-2-6/21 4-2-6/23 第四部分 第三章 第一节 4-3-1 4-3-1/1 4-3-1/3 4-3-1/3.1 4-3-1/3.3 4-3-1/3.5 4-3-1/3.5i) 4-3-1/3.5ii) 4-3-1/3.7 4-3-1/3.9 4-3-1/3.11 4-3-1/3.11.1 4-3-1/3.13 4-3-1/3.15 4-3-1/3.17 4-3-1/3.19 4-3-1/3.21 4-3-1/3.23 4-3-1/3.25 4-3-1/3.27 4-3-1/3.29 4-3-1/3.31 4-3-1/5 4-3-1/7 4-3-1/9 4-3-1/11 4-3-1/12 4-3-1/13 4-3-1/13.1 4-3-1/13.3 4-3-1/13.5 4-3-1/13.7 4-3-1/13.9 4-3-1/13.11 4-3-1/15 4-3-1/17 4-3-1/17.1 4-3-1/17.3 4-3-1/17.3.1 4-3-1/17.3.1i) 4-3-1/17.3.1ii) 4-3-1/17.3.1iii) 4-3-1/17.3.1iv) 4-3-1/17.3.2 4-3-1/17.3.3 4-3-1/19 4-3-1/表1 4-2-6/19 锅炉及其辅助管路
4-2-6/21 操舵装置管路
4-2-6/23 燃气涡轮管路
机械设备及系统
电气设备 通则
通则 4-3-1 , 6-1-7
4-3-1/1 适用范围
4-3-1/3 定义
4-3-1/3.1 接地的配电系统
4-3-1/3.3 基本设施
4-1-1/3.5 4-3-1/3.5 防爆(防火)设备
4-3-1/3.5i) 4-3-1/3.5ii)
4-3-1/3.7 危险区域(危险位置)
4-3-1/3.9 船壳回路系统
4-3-1/3.11 安全火花系统
4-3-1/3.11.1 ”ia”类
4-3-1/3.13 强保险装置
4-3-1/3.15 非周期循环特性
4-3-1/3.17 无火花鼓风机
4-3-1/3.19 周期循环特性
4-3-1/3.21 便携设备
4-3-1/3.23 正压型电气设备
4-3-1/3.25 半封闭舱室
4-3-1/3.27 单独的回路
4-3-1/3.29 短路
4-3-1/3.31 短时特性
4-3-1/5 提交的图纸和资料
4-3-1/7 标准配电系统
4-3-1/9 电压和频率变化
4-3-1/11 材料
4-3-1/13 基础装置
6-1-7/1.1 绝缘材料
6-1-7/1.1.1 A级绝缘材料
6-1-7/1.1.2 B级绝缘材料
6-1-7/1.1.3 E级绝缘材料
6-1-7/1.1.4 F级绝缘材料
6-1-7/1.1.5 H级绝缘材料
6-1-7/1.1.6 温度超过180°C (356°F)的绝缘材料
4-3-1/15 围栏保护度
4-3-1/17 温度设定
4-3-1/17.1 一般规定
4-3-1/17.3 减少的环境温度
4-3-1/17.3.1 受环境约束的舱室
4-3-1/17.3.1i) 4-3-1/17.3.1ii) 4-3-1/17.3.1iii) 4-3-1/17.3.1iv)
4-3-1/17.3.2 电缆设定
4-3-1/17.3.3 环境温度控制设备
4-3-1/19 间隙和漏电距离
电压和频率变化量 4-3-1/表1
ABS海上移动平台入级与建造规范·2012 57
通知与总信息
4-3-1/表2 保护度—第一个特征数字 4-3-1/表2 4-3-1/表3 保护度—第二个特征数字 4-3-1/表3 4-3-1/表4 首要基本设施 4-1-1/表3 4-3-1/表5 次要基本设施 4-1-1/表4
第四部分 机械设备及系统
第三章 电气设备 第二节 钻井平台系统 4-3-2 4-3-2 ,7-1-6 钻井平台系统 4-3-2/1 4-3-2/1 提交的图纸和资料 4-3-2/1.1 4-3-2/1.1 配线 4-3-2/1.1.1 4-3-2/1.1.1 系统 4-3-2/1.1.2 4-3-2/1.1.2 配线系统的资料 4-3-2/1.3 4-3-2/1.3 短路资料 4-3-2/1.5 4-3-2/1.5 保护装置协调 4-3-2/1.7 4-3-2/1.7 负荷分析 4-3-2/3 4-3-2/3 钻井平台用于主要设施的电力来源 4-3-2/3.1 4-3-2/3.1 发电机供电 4-3-2/3.1.1 4-3-2/3.1.1 发电机数目 4-3-2/3.1.2 4-3-2/3.1.2 发电机的能力 4-3-2/3.1.3 4-3-2/3.1.3 并联发电机 4-3-2/3.1.4 4-3-2/3.1.4 从瘫船状态起动(黑启动) 4-3-2/3.1.5 4-3-2/3.1.5 原动力发电机的燃料容量 4-3-2/3.1.6 4-3-2/3.1.6 系统布置 4-3-2/3.1.6(a) 4-3-2/3.1.6(a) 通则 4-3-2/3.1.6(b) 4-3-2/3.1.6(b) 单个发电机运行 4-3-2/3.1.6(c) 4-3-2/3.1.6(c) 多个发电机运行 4-3-2/3.3 4-3-2/3.3 由推进装置传动的发电机 4-3-2/3.3.1 4-3-2/3.3.1 恒速传动 4-3-2/3.3.1i) 4-3-2/3.3.1i) 4-3-2/3.3.1ii) 4-3-2/3.3.1ii) 4-3-2/3.3.1iii) 4-3-2/3.3.1iii) 4-3-2/3.3.2 4-3-2/3.3.2 变速传动 4-3-2/3.3.2i) 4-3-2/3.3.2i) 4-3-2/3.3.2ii) 4-3-2/3.3.2ii) 4-3-2/3.3.2iii) 4-3-2/3.3.2iii) 4-3-2/3.3.2iv) 4-3-2/3.3.2iv) 4-3-2/3.3.2v) 4-3-2/3.3.2v) 4-3-2/3.5 4-3-2/3.5 交流发电机的能力 4-3-2/5 4-3-2/5 应急能力来源 4-3-2/5.1 4-3-2/5.1 一般规定 4-3-2/5.1.1 4-3-2/5.1.1 基本要求 4-3-2/5.1.2 4-3-2/5.1.2 边界 4-3-2/5.1.3 4-3-2/5.1.3 备用布置 4-3-2/5.1.3i) 4-3-2/5.1.3i) 4-3-2/5.1.3ii) 4-3-2/5.1.3ii) 4-3-2/5.1.3iii) 4-3-2/5.1.3iii) 4-3-2/5.1.3iv) 4-3-2/5.1.3iv) 4-3-2/5.1.3v) 4-3-2/5.1.3v) 4-3-2/5.3 4-3-2/5.3 应急供电 4-3-2/5.3.1 4-3-2/5.3.1 应急照明 4-3-2/5.3.1(a) 4-3-2/5.3.1(a) 4-3-2/5.3.1(b) 4-3-2/5.3.1(b) 4-3-2/5.3.1(c) 4-3-2/5.3.1(c) 4-3-2/5.3.1(d) 4-3-2/5.3.1(d) 4-3-2/5.3.1(e) 4-3-2/5.3.1(e) 58 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-3-2/5.3.1(f) 4-3-2/5.3.1(g) 4-3-2/5.3.1(h) 4-3-2/5.3.2 航行灯和信号 4-3-2/5.3.3 海上结构的标记 4-3-2/5.3.4 内部通信 4-3-2/5.3.5 火灾和气体探测和报警系统 4-3-2/5.3.6 紧急信号 4-3-2/5.3.7 防喷器(BOP)和井截断 4-3-2/5.3.8 消防泵和灭火系统 4-3-2/5.3.9 潜水设备 4-3-2/5.3.10 柱稳式平台 4-3-2/5.3.10(a) 4-3-2/5.3.10(b) 4-3-2/5.3.11 自航式钻井平台 4-3-2/5.3.11(a) 4-3-2/5.3.11(b) 4-3-2/5.3.11(c) 4-3-2/5.3.11(d) 4-3-2/5.3.12 其它的应急服务 4-3-2/5.3.12(a) 4-3-2/5.3.12(b) 4-3-2/5.3.12(c) 4-3-2/5.5 应急电源 4-3-2/5.5.1 一般规定 4-3-2/5.5.2 发电机 4-3-2/5.5.2i) 4-3-2/5.5.2ii) 4-3-2/5.5.2iii) 4-3-2/5.5.3 蓄电池组 4-3-2/5.5.3i) 4-3-2/5.5.3ii) 4-3-2/5.5.3iii) 4-3-2/5.5.4 非紧急设施的应急发电机 4-3-2/5.7 临时电源 4-3-2/5.7i) 4-3-2/5.7ii) 4-3-2/5.9 应急配电盘 4-3-2/5.9.1 一般规定 4-3-2/5.9.2 发电机的应急配电盘 4-3-2/5.9.3 蓄电池组 4-3-2/5.9.4 应急配电盘和主配电盘间的配电线 4-3-2/5.9.5 断开非紧急电路 4-3-2/5.11 压载泵 4-3-2/5.13 定期试验的安排 4-3-2/5.15 应急发电机组的起动布置 4-3-2/5.15.1 寒冷条件 4-3-2/5.15.2 启动数量 4-3-2/5.15.3 储能充电 4-3-2/5.15.3(a) 4-3-2/5.15.3(b) 4-3-2/5.15.3(c) 4-3-2/5.15.4 手动启动 4-3-2/5.17 应急柴油发动机的报警和保护装置 4-3-2/5.17.1 提交的信息 4-3-2/5.3.1(f) 4-3-2/5.3.1(g) 4-3-2/5.3.1(h) 4-3-2/5.3.2 4-3-2/5.3.3 4-3-2/5.3.4 4-3-2/5.3.5 4-3-2/5.3.6 4-3-2/5.3.7 4-3-2/5.3.8 4-3-2/5.3.9 4-3-2/5.3.10
4-3-2/5.3.10(a) 4-3-2/5.3.10(b) 4-3-2/5.3.11
4-3-2/5.3.11(a) 4-3-2/5.3.11(b) 4-3-2/5.3.11(c) 4-3-2/5.3.11(d) 4-3-2/5.3.12
4-3-2/5.3.12(a) 4-3-2/5.3.12(b) 4-3-2/5.3.12(c) 4-3-2/5.5 4-3-2/5.5.1 4-3-2/5.5.2 4-3-2/5.5.2i) 4-3-2/5.5.2ii) 4-3-2/5.5.2iii) 4-3-2/5.5.3 4-3-2/5.5.3i) 4-3-2/5.5.3ii) 4-3-2/5.5.3iii) 4-3-2/5.5.4 4-3-2/5.7 4-3-2/5.7i) 4-3-2/5.7ii) 4-3-2/5.9 4-3-2/5.9.1 4-3-2/5.9.2 4-3-2/5.9.3 4-3-2/5.9.4 4-3-2/5.9.5 4-3-2/5.11 4-3-2/5.13 4-3-2/5.15 4-3-2/5.15.1 4-3-2/5.15.2 4-3-2/5.15.3 4-3-2/5.15.3(a) 4-3-2/5.15.3(b) 4-3-2/5.15.3(c) 4-3-2/5.15.4 4-3-2/5.17 4-3-2/5.17.1
ABS海上移动平台入级与建造规范·2012 59
通知与总信息
4-3-2/5.17.2 4-3-2/5.17.2(a) 4-3-2/5.17.2(b) 4-3-2/5.17.2(c) 4-3-2/5.17.2(d) 4-3-2/5.17.2(e) 4-3-2/5.17.2(f) 4-3-2/5.19 4-3-2/7 4-3-2/7.1 4-3-2/7.1.1 4-3-2/7.1.2 4-3-2/7.1.3 4-3-2/7.1.4 4-3-2/7.1.5 4-3-2/7.1.6 4-3-2/7.1.6(a) 4-3-2/7.1.6(b) 4-3-2/7.1.6(c) 4-3-2/7.1.6(c)i) 4-3-2/7.1.6(c)ii) 4-3-2/7.1.6(c)iii) 4-3-2/7.1.7 4-3-2/7.3 4-3-2/7.3.1 4-3-2/7.3.1i) 4-3-2/7.3.1ii) 4-3-2/7.3.1iii) 4-3-2/7.3.2 4-3-2/7.5 4-3-2/7.7 4-3-2/7.7.1 4-3-2/7.7.2 4-3-2/7.7.3 4-3-2/7.7.4 4-3-2/7.7.5 4-3-2/7.7.6 4-3-2/7.7 4-3-2/9 4-3-2/9.1 4-3-2/9.1.1 4-3-2/9.1.1i) 4-3-2/9.1.1ii) 4-3-2/9.1.1iii) 4-3-2/9.1.1i) 4-3-2/9.1.1ii) 4-3-2/9.1.2 4-3-2/9.1.2(a) 4-3-2/9.1.2(b) 4-3-2/9.1.2(c) 4-3-2/9.1.3 4-3-2/9.1.3(a) 4-3-2/9.1.3(b) 4-3-2/9.1.3(c)
报警和保护装置
权威部门的要求 配电系统
钻井平台用于主要设施的配电系统 一般规定 配电方法 贯穿供电布置 电动机控制中心 电动机分支电路
通过变压器和转换器供电 供电连续性 布置
蓄电池充电器的变压器和转换器 --- --- 加热器
船壳回路系统 一般规定
最终支路和接地线 接地配电系统
外部或岸上电源连接 一般规定 接地终端 指示器
极性或相位序列 信息板
拖曳电缆的保护 谐波
电路保护系统 系统设计 一般规定
短路保护 保护装置
额定短路分断能力 额定短路接通能力 过载保护 断路器 熔断器 额定值 4-3-2/5.17.2 4-3-2/5.17.2(a) 4-3-2/5.17.2(b) 4-3-2/5.17.2(c) 4-3-2/5.17.2(d) 4-3-2/5.17.2(e) 4-3-2/5.17.2(f) 4-3-2/5.19 4-3-2/7 4-3-2/7.1 4-3-2/7.1.1 4-3-2/7.1.2 4-3-2/7.1.3 4-3-2/7.1.4 4-3-2/7.1.5 4-3-2/7.1.6 4-3-2/7.1.6(a) 4-3-2/7.1.6(b) 4-3-2/7.1.6(c) 4-3-2/7.1.6(c)i) 4-3-2/7.1.6(c)ii) 4-3-2/7.1.6(c)iii) 4-3-2/7.1.7 4-3-2/7.3 4-3-2/7.3.1 4-3-2/7.3.1i) 4-3-2/7.3.1ii) 4-3-2/7.3.1iii) 4-3-2/7.3.2 4-3-2/7.5 4-3-2/7.7 4-3-2/7.7.1 4-3-2/7.7.2 4-3-2/7.7.3 4-3-2/7.7.4 4-3-2/7.7.5 7-1-6/7.7.1 7-1-6/7.7.2 4-3-2/7.7 4-3-2/9 4-3-2/9.1 4-3-2/9.1.1 4-3-2/9.1.1i) 4-3-2/9.1.1ii) 4-3-2/9.1.1iii) 4-3-2/9.1.1i) 4-3-2/9.1.1ii) 4-3-2/9.1.2 4-3-2/9.1.2(a) 4-3-2/9.1.2(b) 4-3-2/9.1.2(c) 4-3-2/9.1.3 4-3-2/9.1.3(a) 4-3-2/9.1.3(b) 4-3-2/9.1.3(c)
60 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-3-2/9.1.3(d) 标示 4-3-2/9.1.4 备用保护 4-3-2/9.1.4(a) 备份保险丝布置 4-3-2/9.1.4(b) 串联保护 4-3-2/9.1.5 并列的脱扣 4-3-2/9.1.5(a) 4-3-2/9.1.5(b) 4-3-2/9.1.5(c) 4-3-2/9.3 发电机保护 4-3-2/9.3.1 一般规定 4-3-2/9.3.2 协调用的脱扣设置 4-3-2/9.3.3 分级卸载布置 4-3-2/9.3.3(a) 分级卸载布置的规定 4-3-2/9.3.3(a)i) 4-3-2/9.3.3(a)ii) 4-3-2/9.3.3(b) 不允许卸载的设施 4-3-2/9.3.3(b)i) 4-3-2/9.3.3(b)ii) --- 4-3-2/9.3.3(b)iii) --- 4-3-2/9.3.4 应急发电机 4-3-2/9.5 交流发电机保护 4-3-2/9.5.1 短延时脱扣 4-3-2/9.5.2 并联运行 4-3-2/9.5.2(a) 瞬时脱扣器 4-3-2/9.5.2(b) 逆功率保护装置 4-3-2/9.5.2(c) 欠压保护 4-3-2/9.7 直流发电机的保护 4-3-2/9.7.1 瞬时跳闸 4-3-2/9.7.2 并联运行 4-3-2/9.7.2(a) 逆流保护 4-3-2/9.7.2(b) 发电机电流表分流器 4-3-2/9.7.2(c) 欠压保护 4-3-2/9.9 蓄电池组的保护 4-3-2/9.11 外部电源或岸边电源的保护 4-3-2/9.11.1 一般规定 4-3-2/9.11.2 联锁布置 4-3-2/9.13 电动机馈电支路的保护 4-3-2/9.13.1 一般规定 4-3-2/9.13.2 直流电动机馈电支路 4-3-2/9.13.3 交流电动机馈电支路 4-3-2/9.13.4 电动机运行保护 4-3-2/9.13.5 欠压保护和欠压释放 4-3-2/9.13.5ii) 4-3-2/9.13.5ii) 4-3-2/9.13.6 升降齿轮电动机 4-3-2/9.15 变压器电路的保护 4-3-2/9.15.1 过流装置的设定值 4-3-2/9.15.2 并联运行 4-3-2/9.17 计量表、领航灯和控制电路的保护 4-3-2/11 自航式平台上舵机系统 4-3-2/11.1 电源馈电线 4-3-2/11.3 操舵装置电动机电路的保护 4-3-2/11.3.1 短路保护 4-3-2/11.3.1(a) 直流电动机 4-3-2/9.1.3(d)
4-3-2/9.1.4 4-3-2/9.1.4(a) 4-3-2/9.1.4(b) 4-3-2/9.1.5 4-3-2/9.1.5(a) 4-3-2/9.1.5(b) 4-3-2/9.1.5(c) 4-3-2/9.3 4-3-2/9.3.1 4-3-2/9.3.2 4-3-2/9.3.3 4-3-2/9.3.3(a) 4-3-2/9.3.3(a)i) 4-3-2/9.3.3(a)ii) 4-3-2/9.3.3(b) 4-3-2/9.3.3(b)i) 4-3-2/9.3.3(b)ii) 4-3-2/9.3.3(b)iii) 4-3-2/9.3.4 4-3-2/9.5 4-3-2/9.5.1 4-3-2/9.5.2 4-3-2/9.5.2(a) 4-3-2/9.5.2(b) 4-3-2/9.5.2(c) 4-3-2/9.7 4-3-2/9.7.1 4-3-2/9.7.2 4-3-2/9.7.2(a) 4-3-2/9.7.2(b) 4-3-2/9.7.2(c) 4-3-2/9.9 4-3-2/9.11 4-3-2/9.11.1 4-3-2/9.11.2 4-3-2/9.13 4-3-2/9.13.1 4-3-2/9.13.2 4-3-2/9.13.3 4-3-2/9.13.4 4-3-2/9.13.5
4-3-2/9.13.5i) 4-3-2/9.13.5ii) 4-3-2/9.13.6 4-3-2/9.15 4-3-2/9.15.1 4-3-2/9.15.2 4-3-2/9.17 4-3-2/11 4-3-2/11.1 4-3-2/11.3 4-3-2/11.3.1 4-3-2/11.3.1(a)
ABS海上移动平台入级与建造规范·2012 61
通知与总信息
4-3-2/11.3.1(b) 4-3-2/11.3.1(c) 4-3-2/11.3.2 4-3-2/11.5 4-3-2/11.7 4-3-2/13 4-3-2/13.1 4-3-2/13.1.1 4-3-2/13.1.2 4-3-2/13.1.2(a) 4-3-2/13.1.2(b) 4-3-2/13.1.3 4-3-2/13.1.4 4-3-2/13.3 4-3-2/13.3.1 4-3-2/13.3.2 4-3-2/13.3.3 4-3-2/15 4-3-2/15.1 4-3-2/15.1.1 4-3-2/15.1.2 4-3-2/15.3 4-3-2/15.5 4-3-2/15.5.1 4-3-2/15.5.2 4-3-2/15.5.3 4-3-2/15.5.4 4-3-2/15.5.5 4-3-2/15.7 4-3-2/15.9 4-3-2/15.9.1 4-3-2/15.9.2 4-3-2/15.9.2i) 4-3-2/15.9.2ii) 4-3-2/15.9.3 4-3-2/15.9.4 4-3-2/17 4-3-2/17.1 4-3-2/17.1.1 4-3-2/17.1.2 4-3-2/17.1.2(a) 4-3-2/17.1.2(b) 4-3-2/17.1.2(c) 4-3-2/17.1.2(d) 4-3-2/17.1.2(e) 4-3-2/17.1.2(f) 4-3-2/17.1.2(g) 4-3-2/17.3 4-3-2/17.5 4-3-2/17.7 4-3-2/19 4-3-2/19.1 4-3-2/19.1.1
交流电动机
电动机馈电线熔断器保护 欠压释放 应急电源
控制、装备仪器和警报 照明系统和导航灯系统 照明系统 主要照明系统 系统布置 主照明系统 应急照明系统
机械舱室起居舱室的照明电路 照明电路的保护 导航灯系统 馈电线
导航灯指示器 保护
内部通信系统 导航桥 通则
EOT车钟 主推进控制站 声音通信
推进和操舵控制站 应急情况通信 升降机 升降系统
电力供应线路的性 应急和内部通讯配电板 扩音系统 系统要求 最小音量水平
应急电源
与一半警报系统相结合的扩音系统 手动操作报警 全船应急报警系统 一般规定 系统需求
工程师警报器
冷冻舱警报 升降机
消防措施和火灾探测系统 应急停止 通风系统 4-3-2/11.3.1(b) 4-3-2/11.3.1(c) 4-3-2/11.3.2 4-3-2/11.5 4-3-2/11.7 4-3-2/13 4-3-2/13.1 4-3-2/13.1.1 4-3-2/13.1.2 4-3-2/13.1.2(a) 4-3-2/13.1.2(b) 4-3-2/13.1.3 4-3-2/13.1.4 4-3-2/13.3 4-3-2/13.3.1 4-3-2/13.3.2 4-3-2/13.3.3 4-3-2/15 4-3-2/15.1 4-3-2/15.1.1 4-3-2/15.1.2 4-3-2/15.3 4-3-2/15.5 4-3-2/15.5.1 4-3-2/15.5.2 4-3-2/15.5.3 4-3-2/15.5.4
4-3-2/15.7 4-3-2/15.9 4-3-2/15.9.1 4-3-2/15.9.2 4-3-2/15.9.2i) 4-3-2/15.9.2ii) 4-3-2/15.9.3 4-3-2/15.9.4 4-3-2/17 4-3-2/17.1 4-3-2/17.1.1 4-3-2/17.1.2 4-3-2/17.1.2(a) 4-3-2/17.1.2(b) 4-3-2/17.1.2(c) 4-3-2/17.1.2(d) 4-3-2/17.1.2(e) 7-1-6/17.1i) 7-1-6/17.1ii) 4-3-2/17.3 7-1-6/17.3 4-3-2/17.5 4-3-2/17.7 4-3-2/19 4-3-2/19.1 4-3-2/19.1.1
62 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-3-2/19.1.1(a) 4-3-2/19.1.1(b) 4-3-2/19.1.1(c) 4-3-2/19.1.2 4-3-2/19.3 4-3-2/表1
第四部分 第三章 第三节
4-3-2/19.1.1(a) 一般规定
4-3-2/19.1.1(b) 机械处所通风
4-3-2/19.1.1(c) 不同于机械处所的通风
4-3-2/19.1.2 其它辅助设备
4-3-2/19.3 探火和报警系统
应急柴油发动机的报警和保护装置 4-3-2/表1 机械设备及系统
电气设备 钻井平台装配
4-3-3 4-3-3/1 4-3-3/1.1 4-3-3/1.3 4-3-3/1.5 4-3-3/1.7 4-3-3/1.9 4-3-3/3 4-3-3/3.1 4-3-3/3.1.1 4-3-3/3.1.1(a) 4-3-3/3.1.1(b) 4-3-3/3.1.2 4-3-3/3.1.3 4-3-3/3.3 4-3-3/3.5 4-3-3/3.5.1 4-3-3/3.5.2 4-3-3/3.5.3 4-3-3/3.5.4 4-3-3/3.7 4-3-3/3.7.1 4-3-3/3.7.2 4-3-3/3.7.2(a) 4-3-3/3.7.2(b) 4-3-3/3.7.2(c) 4-3-3/3.7.2(d) 4-3-3/3.7.2(d)i) 4-3-3/3.7.2(d)ii) 4-3-3/3.7.2(e) 4-3-3/3.7.2(f) 4-3-3/3.7.3 4-3-3/3.7.3(a) 4-3-3/3.7.3(b) 4-3-3/3.7.3(c) 4-3-3/3.7.3(d) 4-3-3/3.7.4 4-3-3/3.7.5 4-3-3/3.7.5(a) 4-3-3/3.7.5(b) 4-3-3/3.7.6 4-3-3/3.9 4-3-3/3.11
钻井平台装配
应提交的图纸和资料 标准细则手册 电器装置的布置 危险区域电器装置 紧急停机程序 电池的保养规划 设备安装与布置 一般考虑 设备位置 通则
机舱中由局部定压喷水消防系统或局部水雾消防系统保护的设备 舱底污水保护 可达性
发电机
钻井平台日用主电动机 总则 泵电动机
露天甲板电动机 甲板下电动机 蓄电池组 总则
电池组安装及布置 大型蓄电池 中等尺寸电池组 小型电池组 低氢放射电池组
电池架
电池类型识别 通风 电池室 电池箱 甲板箱 小型电池箱 腐蚀保护 电池的保养 电池的保养规划 维修程序 更换电池 配电盘 配电板
4-3-3, 6-1-7, 7-1-5 4-3-3/1 4-3-3/1.1 4-3-3/1.3 4-3-3/1.5 4-3-3/1.7 4-3-3/1.9 4-3-3/3 4-3-3/3.1 4-3-3/3.1.1 4-3-3/3.1.1(a) 4-3-3/3.1.1(b) 7-1-5/7.13.2 6-1-7/1.3 7-1-5/7.13.3 4-3-3/3.3 4-3-3/3.5 4-3-3/3.5.1 4-3-3/3.5.2 4-3-3/3.5.3 4-3-3/3.5.4 4-3-3/3.7 4-3-3/3.7.1 4-3-3/3.7.2 4-3-3/3.7.2(a) 4-3-3/3.7.2(b) 4-3-3/3.7.2(c) 4-3-3/3.7.2(d) 4-3-3/3.7.2(d)i) 4-3-3/3.7.2(d)ii) 4-3-3/3.7.2(e) 4-3-3/3.7.2(f) 4-3-3/3.7.3 4-3-3/3.7.3(a) 4-3-3/3.7.3(b) 4-3-3/3.7.3(c) 4-3-3/3.7.3(d) 4-3-3/3.7.4 4-3-3/3.7.5 4-3-3/3.7.5(a) 4-3-3/3.7.5(b) 4-3-3/3.7.6 4-3-3/3.9 4-3-3/3.11
ABS海上移动平台入级与建造规范·2012 63
通知与总信息
4-3-3/3.11.1 位置和保护 4-3-3/3.11.2 开关型配电板 4-3-3/3.11.3 安全型配电板 4-3-3/3.13 马达控制和控制中心 4-3-3/3.13.1 位置和安装 4-3-3/3.13.2 断开装置 4-3-3/3.13.2(a) 设备 4-3-3/3.13.2(b) 位置 4-3-3/3.13.2(c) 制动方式 4-3-3/3.13.2(d) 标牌 4-3-3/3.13.2(e) 开关指示 4-3-3/3.13.3 指示灯电路 4-3-3/3.15 控制装置电阻器 4-3-3/3.17 照明器具 4-3-3/3.19 加热装置 4-3-3/3.21 磁罗盘 4-3-3/3.23 可移动设备和电源插座 4-3-3/3.25 不同额定值的插座和插头 4-3-3/3.27 装置由瘫船工况恢复的安装要求 4-3-3/3.29 消防条件下要求的操作作业 4-3-3/3.29i) 4-3-3/3.29ii) 4-3-3/3.29iii) 4-3-3/3.29iv) 4-3-3/3.29v) 4-3-3/3.29vi) 4-3-3/3.29vii) 4-3-3/3.29viii) 4-3-3/3.29ix) 4-3-3/3.31 高火灾危险区 4-3-3/3.31i) 4-3-3/3.31ii) 4-3-3/3.31iii) 4-3-3/3.31iv) 4-3-3/5 电缆敷设 4-3-3/5.1 一般考虑 4-3-3/5.1.1 电缆敷设的连贯性 4-3-3/5.1.2 电缆选取 4-3-3/5.1.3 新安装装置电缆电压降 4-3-3/5.1.4 电缆的受位置 4-3-3/5.1.5 电缆密封装置排水方式 4-3-3/5.1.6 高压电缆 4-3-3/5.1.7 电缆喷漆 4-3-3/5.1.8 高压开关设备和控制装置以上电缆敷设 4-3-3/5.3 新安装装置的绝缘电阻 4-3-3/5.5 4-3-3/5.5.1 4-3-3/5.5.2 4-3-3/5.5.2(a) 4-3-3/5.5.2(b) 4-3-3/5.5.2(c) 4-3-3/5.5.3 4-3-3/5.7 4-3-3/5.9
电磁感应保护 多芯电缆 单芯电缆
无防护信号电缆 接头和密封 支撑和弯曲 4-3-3/3.11.1 4-3-3/3.11.2 4-3-3/3.11.3 4-3-3/3.13 4-3-3/3.13.1 4-3-3/3.13.2 4-3-3/3.13.2(a) 4-3-3/3.13.2(b) 4-3-3/3.13.2(c) 4-3-3/3.13.2(d) 4-3-3/3.13.2(e) 4-3-3/3.13.3 4-3-3/3.15 4-3-3/3.17 4-3-3/3.19 4-3-3/3.21 4-3-3/3.23 4-3-3/3.25 4-3-3/3.27 4-3-3/3.29
4-3-3/3.29i) 4-3-3/3.29ii) 4-3-3/3.29iii) 4-3-3/3.29iv) 4-3-3/3.29v) 4-3-3/3.29vi) 4-3-3/3.29vii) 4-3-3/3.29viii) 4-3-3/3.29ix) 4-3-3/3.31
4-3-3/3.31i) 4-3-3/3.31ii) 4-3-3/3.31iii) 4-3-3/3.31iv) 4-3-3/5 4-3-3/5.1 4-3-3/5.1.1 4-3-3/5.1.2 4-3-3/5.1.3 4-3-3/5.1.4 4-3-3/5.1.5 4-3-3/5.1.6 7-1-5/5.1 4-3-3/5.1.7 4-3-3/5.3 7-1-3/5.3 4-3-3/5.5 4-3-3/5.5.1 4-3-3/5.5.2 4-3-3/5.5.2(a) 4-3-3/5.5.2(b) 4-3-3/5.5.2(c) 4-3-3/5.5.3 4-3-3/5.7 4-3-3/5.9
ABS海上移动平台入级与建造规范·2012
通知与总信息
4-3-3/5.9.1 4-3-3/5.9.1(a) 4-3-3/5.9.1(b) 4-3-3/5.9.1(c) 4-3-3/5.9.1(d) 4-3-3/5.9.1(e) 4-3-3/5.9.2 4-3-3/5.9.3 4-3-3/5.9.3(a) 4-3-3/5.9.3(b) 4-3-3/5.9.3(c) 4-3-3/5.9.3(d) 4-3-3/5.9.3(e) 4-3-3/5.11 4-3-3/5.11.1 4-3-3/5.11.2 4-3-3/5.11.3 4-3-3/5.13 4-3-3/5.15 4-3-3/5.15.1 4-3-3/5.15.2 4-3-3/5.17 4-3-3/5.17.1 4-3-3/5.17.2
支撑和固定
弯曲半径
塑料电缆盘和防护罩 安装
安全工作负载
防护罩中电缆占用空间比例 危险区域 型式试验 电缆成束敷设 定额电流减少 间隙和隔离
较低导体温度电缆 甲板和舱壁穿透 机械穿透 金属防具 导线管或结构型钢 应急必需的馈电线 位置
火灾情况下的必要负载
4-3-3/5.17.2(a) 4-3-3/5.17.2(b) 4-3-3/5.17.2(c) 4-3-3/5.17.3 应急消防泵电缆 4-3-3/5.17.4 主管机关的要求 4-3-3/5.19 4-3-3/5.21 4-3-3/5.23 4-3-3/5.25 4-3-3/5.27 4-3-3/5.29 4-3-3/5.29.1 4-3-3/5.29.2 4-3-3/5.29.3 4-3-3/5.31 4-3-3/5.33 4-3-3/5.33.1 4-3-3/5.33.2 4-3-3/5.33.3 4-3-3/5.33.3(a) 4-3-3/5.33.3(b) 4-3-3/5.33.3(c) 4-3-3/5.33.4 4-3-3/5.33.5
矿物绝缘电缆 光缆
蓄电池室
镶板和拱形装置 护套和结构绝缘体 电缆连接 认可根据 接头安装 接头保护 光缆连接 电缆接线箱
4-3-3/5.9.1 7-1-3/5.9.1 7-1-3/5.9.1(a) 7-1-3/5.9.1(b) 7-1-3/5.9.1(c) 7-1-3/5.9.1(d) 7-1-3/5.9.1(e) 4-3-3/5.9.2 7-1-5/5.9.2 4-3-3/5.9.3 7-1-5/5.9.3 4-3-3/5.9.3(a) 4-3-3/5.9.3(b) 7-1-5/5.9.3 4-3-3/5.9.3(c) 4-3-3/5.9.3(d) 4-3-3/5.11 4-3-3/5.11.1 4-3-3/5.11.2 4-3-3/5.11.3 4-3-3/5.13 7-1-5/5.13 4-3-3/5.15 7-1-5/5.15 4-3-3/5.15.1 7-1-5/5.15.1 4-3-3/5.15.2 7-1-5/5.15.2 4-3-3/5.17 4-3-3/5.17.1 4-3-3/5.17.2 7-1-5/5.17.1
4-3-3/5.17.2(a) 4-3-3/5.17.2(b) 4-3-3/5.17.2(c) 4-3-3/5.17.3 4-3-3/5.17.4 7-1-5/5.17.2 7-1-5/5.19 7-1-5/5.21 4-3-3/5.19 7-1-5/5.25 7-1-5/5.27 4-3-3/5.21 4-3-3/5.21.1 7-1-5/5.29.1 7-1-5/5.29.2 4-3-3/5.23 4-3-3/5.25 4-3-3/5.25.1 4-3-3/5.25.2 4-3-3/5.25.3 4-3-3/5.25.3(a) 4-3-3/5.25.3(b) 4-3-3/5.25.3(c) 4-3-3/5.25.4 7-1-5/5.33
ABS海上移动平台入级与建造规范·2012 65
通知与总信息
4-3-3/7 接地 4-3-3/7.1 通则 4-3-3/7.1i) 4-3-3/7.1ii) 4-3-3/7.1iii) 4-3-3/7.3 永久设备 4-3-3/7.5 连接接头 4-3-3/7.5.1 通则 4-3-3/7.5.2 接地配电系统 4-3-3/7.5.3 船体结构接头 4-3-3/7.7 移动线 4-3-3/7.9 电缆金属护套 4-3-3/9 危险区设备及安装 4-3-3/9.1 一般考虑 4-3-3/9.1.1 通则 4-3-3/9.1.2 电气设备 4-3-3/9.1.2(a) 0区 4-3-3/9.1.2(b) 1区 4-3-3/9.1.2(b)i) 4-3-3/9.1.2(b)ii) --- 4-3-3/9.1.2(b)iii) --- 4-3-3/9.1.2(b)iv) --- 4-3-3/9.1.2(b)v) --- 4-3-3/9.1.2(b)vi) --- 4-3-3/9.1.2(c) 2区 4-3-3/9.1.2(c)i) 4-3-3/9.1.2(c)ii) 4-3-3/9.1.2(c)iii) 4-3-3/9.1.3 电缆敷设 4-3-3/9.1.4 照明电路 4-3-3/9.1.5 4-3-3/9.3 4-3-3/9.3.1 4-3-3/9.3.2 4-3-3/9.3.2(a) 4-3-3/9.3.2(b) 4-3-3/9.3.2(c) 4-3-3/9.3.2(d) 4-3-3/9.3.3 4-3-3/9.5 4-3-3/9.5.1 4-3-3/9.5.1i) 4-3-3/9.5.1ii) 4-3-3/9.5.1iii) 4-3-3/9.5.1iv) 4-3-3/9.5.1v) 4-3-3/9.5.2 4-3-3/9.5.3 4-3-3/9.5.3i) 4-3-3/9.5.3ii) 4-3-3/9.5.3iii) 4-3-3/9.7 4-3-3/9.7.1 4-3-3/9.7.1(a)
永久警告牌
安全认可型和正压型电气设备及系统 安装认可 安全火花系统 隔离 物理屏障 铭牌 更换
正压型电气设备 油漆间 通则
通风口附近的露天区 封闭通道处所
不会打出火花风扇 设计标准 空隙 4-3-3/7 4-3-3/7.1 4-3-3/7.1i) 4-3-3/7.1ii) 4-3-3/7.1iii) 4-3-3/7.3 4-3-3/7.5 4-3-3/7.5.1 4-3-3/7.5.2 4-3-3/7.5.3 4-3-3/7.7 4-3-3/7.9 4-3-3/9 4-3-3/9.1 4-3-3/9.1.1 4-3-3/9.1.2 4-3-3/9.1.2(a) 4-3-3/9.1.2(b) 4-3-3/9.1.2(b)i) 4-3-3/9.1.2(b)ii) 4-3-3/9.1.2(b)iii)
4-3-3/9.1.2(b)iv) 4-3-3/9.1.2(b)v) 4-3-3/9.1.2(b)vi) 4-3-3/9.1.2(c) 4-3-3/9.1.2(c)i) 4-3-3/9.1.2(c)ii) 4-3-3/9.1.2(c)iii) 4-3-3/9.1.4 4-3-3/9.1.5 7-1-7/9.1.2 7-1-7/9.1.3 4-3-3/9.3 4-3-3/9.3.1 4-3-3/9.3.2 4-3-3/9.3.2(a) 4-3-3/9.3.2(b) 7-1-7/9.3.1 4-3-3/9.3.2(c) 4-3-3/9.3.3 4-3-3/9.5 4-3-3/9.5.1 4-3-3/9.5.1i) 4-3-3/9.5.1ii) 4-3-3/9.5.1iii) 4-3-3/9.5.1iv) 4-3-3/9.5.1v) 4-3-3/9.5.2 4-3-3/9.5.3 4-3-3/9.5.3i) 4-3-3/9.5.3ii) 4-3-3/9.5.3iii) 4-3-3/9.7 4-3-3/9.7.1 4-3-3/9.7.1(a)
66 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-3-3/9.7.1(b) 4-3-3/9.7.2 4-3-3/9.7.2(a) 4-3-3/9.7.2(b) 4-3-3/9.7.2(c) 4-3-3/9.7.2(c)i) 4-3-3/9.7.2(c)ii) 4-3-3/9.7.2(c)iii) 4-3-3/9.7.2(c)iv) 4-3-3/9.7.2(d) 4-3-3/9.7.2(d)i) 4-3-3/9.7.2(d)ii) 4-3-3/9.7.2(d)iii) 4-3-3/9.7.3 4-3-3/表1 4-3-3/表2 4-3-3/表3 4-3-3/图1 4-3-3/图2
第四部分 第三章 第四节
4-3-3/9.7.1(b) 保护屏
4-3-3/9.7.2 材料
4-3-3/9.7.2(a) 叶轮及其外壳
4-3-3/9.7.2(b) 静电电荷
4-3-3/9.7.2(c) 可接受的材料组合
4-3-3/9.7.2(c)i) 4-3-3/9.7.2(c)ii) 4-3-3/9.7.2(c)iii) 4-3-3/9.7.2(c)iv)
4-3-3/9.7.2(d) 不可接受的材料组合
4-3-3/9.7.2(d)i) 4-3-3/9.7.2(d)ii) 4-3-3/9.7.2(d)iii)
4-3-3/9.7.3 型式试验
最低防护等级 4-3-3/表1 电缆最小弯曲半径 7-1-5/表1 接地连续导体尺寸和接地装置 4-3-3/表32 保护区、直接喷雾邻区和水扩散邻区举例 4-3-3/图1 高火灾危险区的电缆4-3-3/图2
机械设备及系统 电气设备 机械设备
4-3-4 4-3-4/1 4-3-4/1.1 4-3-4/1.3 4-3-4/3 4-3-4/3.1 4-3-4/3.1.1 4-3-4/3.1.2 4-3-4/3.1.3 4-3-4/3.1.3(a) 4-3-4/3.1.3(b) 4-3-4/3.1.3(c) 4-3-4/3.1.3(d) 4-3-4/3.1.3(e) 4-3-4/3.1.3(f) 4-3-4/3.1.3(g) 4-3-4/3.1.3(h) 4-3-4/3.3 4-3-4/3.5 4-3-4/3.5.1 4-3-4/3.5.2 4-3-4/3.5.2(a) 4-3-4/3.5.2(b) 4-3-4/3.5.2(c) 4-3-4/3.7 4-3-4/3.7.1 4-3-4/3.7.2 4-3-4/3.7.3 4-3-4/3.9 4-3-4/3.9.1 4-3-4/3.9.1(a) 4-3-4/3.9.1(b) 机械设备
需提交的图纸和数据
100KW及以上的发电机和电动机 低于100KW发电机和电动机 旋转电机 通则 应用
已认可的质保计划证明 参考文献 倾斜 绝缘材料 发电机容量 发电机电力供应 发电机电路保护 电动机电路保护 装置
防护罩及其选取 测试和检测 过载及过流容量 交流发电机 交流电动机 过电流容量 过载容量
同步电机的过载容量 绝缘体的介电强度 应用
标准电压测试 直流测试 额定温度 额定温度
持续额定运行电机 短时额定运行电机 4-3-4, 6-1-3, 6-1-7 6-1-7/3 6-1-7/3.1 6-1-7/3.3 6-1-7/5 6-1-7/5.1 6-1-7/5.1.1 6-1-7/5.1.2 6-1-7/5.1.3 6-1-7/5.1.3(a) 6-1-7/5.1.3(b) 6-1-7/5.1.3(c) 6-1-7/5.1.3(d) 6-1-7/5.1.3(e) 6-1-7/5.1.3(f) 6-1-7/5.1.3(g) 6-1-7/5.1.3(h) 6-1-7/5.3 6-1-7/5.5 6-1-7/5.5.1 6-1-7/5.5.2 6-1-7/5.5.2(a) 6-1-7/5.5.2(b) 6-1-7/5.5.2(c) 6-1-7/5.7 6-1-7/5.7.1 6-1-7/5.7.2 6-1-7/5.7.3 6-1-7/5.9 6-1-7/5.9.1 6-1-7/5.9.1(a) 6-1-7/5.9.1(b)
ABS海上移动平台入级与建造规范·2012 67
通知与总信息
4-3-4/3.9.1(c) 4-3-4/3.9.1(d) 4-3-4/3.9.1(e) 4-3-4/3.9.2 4-3-4/3.11 4-3-4/3.11.1 4-3-4/3.11.2 4-3-4/3.11.3 4-3-4/3.11.4 4-3-4/3.11.5 4-3-4/3.11.6 4-3-4/3.11.7 4-3-4/3.11.8 4-3-4/3.11.9 4-3-4/3.13 4-3-4/3.15 4-3-4/3.15.1 4-3-4/3.15.1(a) 4-3-4/3.15.1(a)i) 4-3-4/3.15.1(a)ii) 4-3-4/3.15.1(b) 4-3-4/3.15.1(c) 4-3-4/3.15.2 4-3-4/3.15.3 4-3-4/3.17 4-3-4/3.17.1 4-3-4/3.17.1(a) 4-3-4/3.17.1(a)i) 4-3-4/3.17.1(a)ii) 4-3-4/3.17.1(a)iii) 4-3-4/3.17.1(b) 4-3-4/3.17.1(c) 4-3-4/3.17.2 4-3-4/3.19 4-3-4/3. 19.1 4-3-4/3. 19.2 4-3-4/3. 19.2(a) 4-3-4/3. 19.2(b) 4-3-4/3. 19.2(c) 4-3-4/3. 19.2(d) 4-3-4/3. 19.3 4-3-4/3. 19.3(a) 4-3-4/3. 19.3(b) 4-3-4/3. 19.3(c) 4-3-4/3.21 4-3-4/3. 21.1 4-3-4/3. 21.1(a) 4-3-4/3. 21.1(b) 4-3-4/3.21.1(c) 4-3-4/3.21.2 4-3-4/3. 21.2(a) 4-3-4/3. 21.2(b) 4-3-4/3. 21.2(c) 周期额定运行电机 非周期额定运行电机
高于180°C (356°F)的绝缘材料 环境温度 构造及装配
密封罩、配线架和台架 转轴和联轴器 循环电流 旋转励磁机 绕组绝缘 冷却水防护 湿气冷凝防护 终端设备 铭牌 润滑
涡轮发电机 运动调节器 瞬时频率变化
稳定状态的速率变化 应急发电机原动机 限速器
燃气轮机的动力输出 发电机柴油机 运动调节器 瞬时频率变化
稳定状态下频率变化 应急发电机原动机 限速器
交流(AC)发电机 发电机控制和励磁 电压调整 电压调整器
额定稳压状态的变化 额定瞬时电压状态的变化 短路状态 并行操作 电抗负载启动 负载分配 负载调整设备
直流(DC)发电机 发电机控制和励磁 磁场调整 串联绕组极性 均衡器连接 电压调整
并联或稳定并励发电机 组合缠绕发电机 自动电压稳压器 6-1-7/5.9.1(c) 6-1-7/5.9.1(d) 6-1-7/5.9.1(e) 6-1-7/5.9.2 6-1-7/5.11 6-1-7/5.11.1 6-1-7/5.11.2 6-1-7/5.11.3 6-1-7/5.11.4 6-1-7/5.11.5 6-1-7/5.11.6 6-1-7/5.11.7 6-1-7/5.11.8 6-1-7/5.11.9 6-1-7/5.13 6-1-3/3.3 6-1-3/3.3.1 6-1-3/3.3.1(a) 6-1-3/3.3.1(a)i) 6-1-3/3.3.1(a)ii) 6-1-3/3.3.1(b) 6-1-3/3.3.1(c) 6-1-3/3.3.2 6-1-3/3.3.3 6-1-3/3.5 6-1-3/3.5.1 6-1-3/3.5.1(a) 6-1-3/3.5.1(a)i) 6-1-3/3.5.1(a)ii) 6-1-3/3.5.1(a)iii) 6-1-3/3.5.1(b) 6-1-3/3.5.1(c) 6-1-3/3.5.2 6-1-7/5.17 6-1-7/5.17.1 6-1-7/5.17.2 6-1-7/5.17.2(a) 6-1-7/5.17.2(b) 6-1-7/5.17.2(c) 6-1-7/5.17.2(d) 6-1-7/5.17.3 6-1-7/5.17.3(a) 6-1-7/5.17.3(b) 6-1-7/5.17.3(c) 6-1-7/5.19 6-1-7/5.19.1 6-1-7/5.19.1(a) 6-1-7/5.19.1(b) 6-1-7/5.19.1(c) 6-1-7/5.19.2 6-1-7/5.19.2(a) 6-1-7/5.19.2(b) 6-1-7/5.19.2(c)
68 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-3-4/3. 21.3 4-3-4/3. 21.3(a) 4-3-4/3. 21.3(b) 4-3-4/3. 21.3(c) 4-3-4/5 4-3-4/5.1 4-3-4/5.1.1 4-3-4/5.1.2 4-3-4/5.1.3 4-3-4/5.1.3(a) 4-3-4/5.1.3(b) 4-3-4/5.1.3(c) 4-3-4/5.1.3(d) 4-3-4/5.3 4-3-4/5.3.1 4-3-4/5.3.2 4-3-4/5.3.3 4-3-4/5.5 4-3-4/7 4-3-4/7.1 4-3-4/7.1.1 4-3-4/7.1.1(a) 4-3-4/7.1.1(b) 4-3-4/7.1.1(c) 4-3-4/7.1.1(d) 4-3-4/7.1.1(e) 4-3-4/7.1.2 4-3-4/7.1.2(a) 4-3-4/7.1.2(b) 4-3-4/7.1.2(c) 4-3-4/7.1.2(d) 4-3-4/7.1.2(e) 4-3-4/7.1.2(f) 4-3-4/7.1.2(g) 4-3-4/7.1.2(h) 4-3-4/7.3 4-3-4/7.5 4-3-4/7.5i) 4-3-4/7.5ii) 4-3-4/7.5.1 4-3-4/7.5.2 4-3-4/7.7 4-3-4/7.7.1 4-3-4/7.7.2 4-3-4/7.7.3 4-3-4/7.7.4 4-3-4/7.9 4-3-4/7.9.1 4-3-4/7.9.2 4-3-4/7.9.3 4-3-4/7.9.4 4-3-4/7.9.5 4-3-4/7.9.5(a)
并行操作 稳定性 负载分配 断路器跳闸 蓄电池组 通则 应用
密封型电池 参考文献 应急供电 电池保护 电池安装 电缆敷设 建造和安装
电解槽和注入塞 板条箱和托架 铭牌
发电机启动电池
配电盘、配电板、控制器等 通则 应用 配电盘
电动机控制器 电动机控制中心
电池充电器装置和无间断电源系统装置(UPS)配电板 参考文献 倾斜
应急配电盘 断路器 馈电线保护
船体回复和接地分配系 接地 安装
防护罩及其选择 绝缘电阻测量 绝缘介电强度
生产线设备
低级绝缘强度设备 建造和装配 密封罩和组件 死前端 机械强度 机械保护
母线,配线和接点 设计
母线作业温度 短路额定值 内部布线 布置 可达性
6-1-7/5.19.3 6-1-7/5.19.3(a) 6-1-7/5.19.3(b) 6-1-7/5.19.3(c) 6-1-7/7 6-1-7/7.1 6-1-7/7.1.1 6-1-7/7.1.2 4-3-4/3.1 4-3-4/3.1.1 4-3-4/3.1.2 4-3-4/3.1.3 4-3-4/3.1.4 6-1-7/7.3 6-1-7/7.3.1 6-1-7/7.3.2 6-1-7/7.3.3 4-3-4/3.3 6-1-7/9 6-1-7/9.1 6-1-7/9.1.1 6-1-7/9.1.1(a) 6-1-7/9.1.1(b) 6-1-7/9.1.1(c) 6-1-7/9.1.1(d) 6-1-7/9.1.1(e) 6-1-7/9.1.2 6-1-7/9.1.2(a) 6-1-7/9.1.2(b) 6-1-7/9.1.2(c) 6-1-7/9.1.2(d) 6-1-7/9.1.2(e) 6-1-7/9.1.2(f) 6-1-7/9.1.2(g) 6-1-7/9.1.2(h) 6-1-7/9.3 6-1-7/9.5 6-1-7/9.5i) 6-1-7/9.5ii) 6-1-7/9.5.1 6-1-7/9.5.2 6-1-7/9.7 6-1-7/9.7.1 6-1-7/9.7.2 6-1-7/9.7.3 6-1-7/9.7.4 6-1-7/9.9 6-1-7/9.9.1 6-1-7/9.9.2 6-1-7/9.9.3 6-1-7/9.9.4 6-1-7/9.9.5 6-1-7/9.9.5(a)
ABS海上移动平台入级与建造规范·2012 69
通知与总信息
4-3-4/7.9.5(b) 4-3-4/7.9.5(c) 4-3-4/7.9.6 4-3-4/7.9.7 4-3-4/7.11 4-3-4/7.11.1 4-3-4/7.11.1(a) 4-3-4/7.11.1(b) 4-3-4/7.11.1(c) 4-3-4/7.11.2 4-3-4/7.11.2(a) 4-3-4/7.11.2(b) 4-3-4/7.11.2(c) 4-3-4/7.11.2(d) 4-3-4/7.11.2(e) 4-3-4/7.11.2(f) 4-3-4/7.11.3 4-3-4/7.13 4-3-4/7.13.1 4-3-4/7.15.2 4-3-4/7.13.3 4-3-4/7.13.3(a) 4-3-4/7.13.3(b) 4-3-4/7.13.4 4-3-4/7.15 4-3-4/7. 15.1 4-3-4/7. 15.2 4-3-4/7. 15.3 4-3-4/7.17 4-3-4/7. 17.1 4-3-4/7. 17.2 4-3-4/7. 17.3 4-3-4/7. 17.4 4-3-4/7. 17.4 (a) 4-3-4/7. 17.4 (b) 4-3-4/7. 17.4 (c) 4-3-4/7. 17.4 (d) 4-3-4/7. 17.4 (e) 4-3-4/7. 17.5 4-3-4/7. 17.5(a) 4-3-4/7. 17.5(b) 4-3-4/7. 17.5(c) 4-3-4/7. 17.6 4-3-4/7. 17.6(a) 4-3-4/7. 17.6(b) 4-3-4/7. 17.6(c) 4-3-4/7. 17.7 4-3-4/7. 17.7(a) 4-3-4/7. 17.7(b) 4-3-4/7. 17.7(c) 4-3-4/9 4-3-4/9.1 4-3-4/9.1.1 连接锁定 焊接接头
间隙和爬电距离 终端设备
设备的控制和保护 电路断开装置
电压超过55V装置
电压为55V及以下装置 断开装置 设备布置 空气断路器 稳压器
高温下作业设备 保险丝易于到达性 仪表保护装置 易磨损部件 标识 配电盘 扶手
主母线细分
直流发电机补偿电路 补偿主电路 补偿母线 仪表装置
电动机控制器和控制中心 外壳及组件
断开开关和断路器 自动启动器
电池系统和不间断电源系统(UPS) 定义
电池充电率 放电保护 设计和结构 结构 操作 型式 连续供应 监视与报警 位置 位置 通风设备 电池安装 性能 持续性 电池容量 再次充电 试验和检验 检验 试验
电源输入故障测试 变压器 通则 应用 6-1-7/9.9.5(b) 6-1-7/9.9.5(c) 6-1-7/9.9.6 6-1-7/9.9.7 6-1-7/9.11 6-1-7/9.11.1 6-1-7/9.11.1(a) 6-1-7/9.11.1(b) 6-1-7/9.11.1(c) 6-1-7/9.11.2 6-1-7/9.11.2(a) 6-1-7/9.11.2(b) 6-1-7/9.11.2(c) 6-1-7/9.11.2(d) 6-1-7/9.11.2(e) 6-1-7/9.11.2(f) 6-1-7/9.11.3 6-1-7/9.13 6-1-7/9.13.1 6-1-7/9.13.2 6-1-7/9.13.3 6-1-7/9.13.3(a) 6-1-7/9.13.3(b) 6-1-7/9.13.4 6-1-7/9.15 6-1-7/9.15.1 6-1-7/9.15.2 6-1-7/9.15.3 6-1-7/9.17 6-1-7/9.17.1 6-1-7/9.17.2 6-1-7/9.17.3 6-1-7/9.17.4 6-1-7/9.17.4(a) 6-1-7/9.17.4(b) 6-1-7/9.17.4(c) 6-1-7/9.17.4(d) 6-1-7/9.17.4(e) 4-3-4/3.5 4-3-4/3.5.1 4-3-4/3.5.2 4-3-4/3.5.3 4-3-4/3.7 4-3-4/3.7.1 4-3-4/3.7.2 4-3-4/3.7.3 6-1-7/19.9 ---
6-1-7/19.9 6-1-7/19.9 6-1-7/11 6-1-7/11.1 6-1-7/11.1.1
70 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-3-4/9.1.2 4-3-4/9.1.2(a) 4-3-4/9.1.2(b) 4-3-4/9.1.2(c) 4-3-4/9.1.3 4-3-4/9.3 4-3-4/9.5 4-3-4/9.5.1 4-3-4/9.5.2 4-3-4/9.5.3 4-3-4/9.5.4 4-3-4/11 4-3-4/11.1 4-3-4/11.1.1 4-3-4/11.1.2 4-3-4/11.1.3 4-3-4/11.3 4-3-4/11.5 4-3-4/11.5.1 4-3-4/11.5.2 4-3-4/11.5.3 4-3-4/11.5.4 4-3-4/11.7 4-3-4/11.7.1 4-3-4/11.7.2 4-3-4/13 4-3-4/13.1 4-3-4/13.1.1 4-3-4/13.1.2 4-3-4/13.1.2(a) 4-3-4/13.1.2(a)i) 4-3-4/13.1.2(a)ii) 4-3-4/13.1.2(a)iii) 4-3-4/13.1.2(b) 4-3-4/13.1.3 4-3-4/13.1.4 4-3-4/13.1.5 4-3-4/13.1.6 4-3-4/13.3 4-3-4/13.5 4-3-4/表1 4-3-4/表2 4-3-4/表3 4-3-4/表4 4-3-4/表5 4-3-4/表6 4-3-4/表7 4-3-4/表8 4-3-4/表9 4-3-4/表10 4-3-4/表11 相关参考 电力供应布置 保护
保护围壁及其选择
强制冷却装置 (气体或液体) 温升
制造和装配 线圈 接线端 铭牌
潮气积聚的预防措施 其他电路电子设备 断路器 通则 机械性能 隔离 保险丝
半导体转换器 通则 冷却装置 易接近性 铭牌
电缆接线箱 通则
设计和建造 电缆电线 电缆构造 通则 阻燃性 标准
可供选择的布置 耐火性 绝缘材料
单导线电缆的防护外套 光学纤维缆线 便携挠曲电缆
矿物质绝缘金属铠装缆线
发电机和电动机≥100 kW (135 hp)的工厂测试程序表 转动电机的绝缘强度测试 气冷转动机械设备的温升 铭牌
配电盘、充电器、电动机控制中心和控制器的工厂测试程序表
配电盘、配电板、充电器、电动机控制中心和控制器上的间隙和爬电距离 配电板仪表设备 变压器的温升 缆线绝缘类型
绝缘铜导线和电缆最大电流承载能力
附加作业要求电气设备根据4-3-4中的要求进行设计,
6-1-7/11.1.2 6-1-7/11.1.2(a) 6-1-7/11.1.2(b) 6-1-7/11.1.2(c) 6-1-7/11.1.3 6-1-7/11.3 6-1-7/11.5 6-1-7/11.5.1 6-1-7/11.5.2 6-1-7/11.5.3 6-1-7/11.5.4 6-1-7/13 6-1-7/19.9 6-1-7/13.1.1 6-1-7/13.1.2 6-1-7/13.1.3 6-1-7/13.3 6-1-7/13.5 6-1-7/13.5.1 6-1-7/13.5.2 6-1-7/13.5.3 6-1-7/13.5.4 6-1-7/13.7 6-1-7/13.7.1 6-1-7/13.7.2 4-3-4/7 4-3-4/7.1 4-3-4/7.1.1 4-3-4/7.1.2 4-3-4/7.1.2(a) 4-3-4/7.1.2(a)i) 4-3-4/7.1.2(a)ii) 4-3-4/7.1.2(a)iii) 4-3-4/7.1.2(b) 4-3-4/7.1.3 4-3-4/7.1.4 4-3-4/7.1.5 4-3-4/7.1.6 4-3-4/7.3 4-3-4/7.5 6-1-7/表2 6-1-7/表3 6-1-7/表4 6-1-7/表5 6-1-7/表6 6-1-7/表7 6-1-7/表8 6-1-7/表9 4-3-4/表1 4-3-4/表2 6-1-7/3.3
ABS海上移动平台入级与建造规范·2012 71
通知与总信息
4-3-4/图1
第四部分 第三章 第五节
建造和测试
冲程柴油机负载极限曲线
从无载步进式增加到额定功率,以平均有效制动压力为函数
机械设备及系统 电气设备 特殊装置 特殊装置 高电压系统 通则 应用 标准电压
空气间隙和爬电距离 空气间隙 爬电距离 系统设计 坐标系选择 接地中点系统 中点接地 设备 中点断开
对地阻抗的船体连接 接地故障探测 变压器数量和容量
电路开断路开关-运行能耗的辅助电路电力供应系统 电力供应源和电力供应能力 外部储存能量源的数量 电路保护 发电机保护 电力变压器的保护 保护装置的协同跳闸
---
线路电源的切断装置 针对电气骚扰的防护措施 相位间故障的检测 接地故障的检测 平联布置的变压器
应用与控制和仪表的电压变压器 保险丝 过压保护
设备安装与布置 防护等级 保护性布置 联锁布置 警示板 电缆
6-1-7/5.1.1 6-1-3/图 1
4-3-5, 6-1-3. 6-1-7 4-3-5/1 6-1-7/15 4-3-5/1.1 6-1-7/15.1 4-3-5/1.1.1 6-1-7/15.1.1 4-3-5/1.1.2 4-3-5/1.1.3 4-3-5/1.1.3(a) 4-3-5/1.1.3(b) 4-3-5/1.3 4-3-5/1.3.1 4-3-5/1.3.2 4-3-5/1.3.2(a) 4-3-5/1.3.2(b) 4-3-5/1.3.3 4-3-5/1.3.4 4-3-5/1.3.5 4-3-5/1.3.6 4-3-5/1.5 4-3-5/1.5.1 4-3-5/1.5.2 4-3-5/1.7 4-3-5/1.7.1 4-3-5/1.7.2 4-3-5/1.7.2(a) 4-3-5/1.7.2(a)i) 4-3-5/1.7.2(a)ii) 4-3-5/1.7.2(b) 4-3-5/1.7.2(c) 4-3-5/1.7.2(d) 4-3-5/1.7.2(e) 4-3-5/1.7.2(f) 4-3-5/1.7.3 4-3-5/1.7.4 4-3-5/1.7.5 4-3-5/1.7.5i) 4-3-5/1.7.5ii) 4-3-5/1.7.5iii) 4-3-5/1.9 4-3-5/1.9.1 4-3-5/1.9.2 4-3-5/1.9.2(a) 4-3-5/1.9.2(b) 4-3-5/1.9.3
4-3-5 4-3-5/1 4-3-5/1.1 4-3-5/1.1.1 4-3-5/1.1.2 4-3-5/1.1.3 4-3-5/1.1.3(a) 4-3-5/1.1.3(b) 4-3-5/1.3 4-3-5/1.3.1 4-3-5/1.3.2 4-3-5/1.3.2(a) 4-3-5/1.3.2(b) 4-3-5/1.3.3 4-3-5/1.3.4 4-3-5/1.3.5 4-3-5/1.3.6 4-3-5/1.5 4-3-5/1.5.1 4-3-5/1.5.2 4-3-5/1.7 4-3-5/1.7.1 4-3-5/1.7.2 4-3-5/1.7.2(a) 4-3-5/1.7.2(a)i) 4-3-5/1.7.2(a)ii) 4-3-5/1.7.2(b) 4-3-5/1.7.2(c) 4-3-5/1.7.2(d) 4-3-5/1.7.2(e) 4-3-5/1.7.2(f) 4-3-5/1.7.3 4-3-5/1.7.4 4-3-5/1.7.5 4-3-5/1.7.5i) 4-3-5/1.7.5ii) 4-3-5/1.7.5iii) 4-3-5/1.9 4-3-5/1.9.1 4-3-5/1.9.2 4-3-5/1.9.2(a) 4-3-5/1.9.2(b) 4-3-5/1.9.3
72 ABS海上移动平台入级与建造规范·2012
通知与总信息
4-3-5/1.9.3(a) 4-3-5/1.9.3(b) 4-3-5/1.9.3(c) 4-3-5/1.9.3(d) 4-3-5/1.9.3(e) 4-3-5/1.9.3(f) 4-3-5/1.11 4-3-5/1.11.1 4-3-5/1.11.1(a) 4-3-5/1.11.1(b) 4-3-5/1.11.1(c) 4-3-5/1.11.1(d) 4-3-5/1.11.1(e) 4-3-5/1.11.1(f) 4-3-5/1.11.2 4-3-5/1.11.2(a) 4-3-5/1.11.2(b) 4-3-5/1.11.2(c) 4-3-5/1.11.2(d) 4-3-5/1.11.2(e) 4-3-5/1.11.2(f) 4-3-5/1.11.2(g) 4-3-5/1.11.2(h) 4-3-5/1.11.3 4-3-5/1.11.3(a) 4-3-5/1.11.3(b) 4-3-5/1.11.3(c) 4-3-5/1.11.3(d) 4-3-5/1.11.3(e) 4-3-5/1.11.3(e)i) 4-3-5/1.11.3(e)ii) 4-3-5/1.11.3(f) 4-3-5/1.11.4 4-3-5/1.11.4(a) 4-3-5/3 4-3-5/3.1 4-3-5/3.1.1 4-3-5/3.1.2 4-3-5/3.3 4-3-5/3.3.1 4-3-5/3.3.2 4-3-5/3.3.3 4-3-5/3.3.4 4-3-5/3.3.5 4-3-5/3.5 4-3-5/3.5.1 4-3-5/3.5.1(a) 4-3-5/3.5.1(b) 4-3-5/3.5.1(c) 4-3-5/3.5.1(d) 4-3-5/3.5.1(e) 4-3-5/3.5.2 4-3-5/3.5.2(a) 4-3-5/3.5.2(b) 4-3-5/3.5.2(c) 4-3-5/3.5.3 4-3-5/3.5.3(a) 4-3-5/3.5.3(b) 4-3-5/3.5.3(c)
电缆的穿引 隔离 设备布置
终端与接合 标识
安装后的测试 机械设备 转动机械 保护 绕组
温度测试仪 无文本 空间加热器 测试
开关装置和控制装置的装配 保护 机械构造 配置
间隙和爬电距离 锁定装置 关闭器
接地和短路设备 测试 变压器 应用 图纸 围壁
空间加热器 测试 --- 铭牌 电缆 标准
电力推进系统 通则 应用
需要提交的图纸与数据 系统设计 通则 生产能力 电力控制系统 再生电力 谐波
推进电力供应系统 推进发电机 电力供应 系统 复合系统 励磁系统
其他作业的特征 推进励磁 励磁电路 磁场电路
钻井机构作业发电机连接 半导体转换器 4-3-5/1.9.3(a) 4-3-5/1.9.3(b) 4-3-5/1.9.3(c) 4-3-5/1.9.3(d) 4-3-5/1.9.3(e) 4-3-5/1.9.3(f) 6-1-7/15.3 6-1-7/15.3.1 6-1-7/15.3.1(a) 6-1-7/15.3.1(b) 6-1-7/15.3.1(c)
6-1-7/15.3.1(d) 6-1-7/19.19 6-1-7/15.3.2 6-1-7/15.3.2(a) 6-1-7/15.3.2(b) 6-1-7/15.3.2(c) 6-1-7/15.3.2(d) 6-1-7/15.3.2(e) 6-1-7/15.3.2(f) 6-1-7/15.3.2(g) 6-1-7/19.21 6-1-7/15.3.3 6-1-7/15.3.3(a) 6-1-7/15.3.3(b) 6-1-7/15.3.3(c) 6-1-7/15.3.3(d) 6-1-7/19.23 6-1-7/19.23i) 6-1-7/19.23ii) 6-1-7/19.23 4-3-5/1.11 4-3-5/1.11 4-3-5/3 4-3-5/3.1 4-3-5/3.1.1 4-3-5/3.1.2 4-3-5/3.3 4-3-5/3.3.1 4-3-5/3.3.2 4-3-5/3.3.3 4-3-5/3.3.4 4-3-5/3.3.5 4-3-5/3.1 4-3-5/3.5.1 4-3-5/3.5.1(a) 4-3-5/3.5.1(b) 4-3-5/3.5.1(c) 4-3-5/3.5.1(d) 4-3-5/3.5.1(e) 4-3-5/3.5.2 4-3-5/3.5.2(a) 4-3-5/3.5.2(b) 4-3-5/3.5.2(c) 4-3-5/3.5.3 4-3-5/3.5.3(a) 4-3-5/3.5.3(b) 4-3-5/3.5.3(c)
ABS海上移动平台入级与建造规范·2012 73
通知与总信息
4-3-5/3.7 4-3-5/3.7.1 4-3-5/3.7.2 4-3-5/3.7.2(a) 4-3-5/3.7.2(b) 4-3-5/3.7.3 4-3-5/3.7.4 4-3-5/3.7.5 4-3-5/3.7.5(a) 4-3-5/3.7.5(b) 4-3-5/3.7.5(c) 4-3-5/3.7.5(d) 4-3-5/3.7.6 4-3-5/3.9 4-3-5/3.9.1 4-3-5/3.9.2 4-3-5/3.9.3 4-3-5/3.9.4 4-3-5/3.11 4-3-5/3.11.1 4-3-5/3.11.2 4-3-5/3.11.3 4-3-5/3.11.4 4-3-5/3.11.5 4-3-5/3.11.6 4-3-5/3.11.7 4-3-5/3.11.8 4-3-5/3.11.9 4-3-5/3.13 4-3-5/3.13.1 4-3-5/3.13.1(a) 4-3-5/3.13.1(b) 4-3-5/3.13.1(c) 4-3-5/3.13.2 4-3-5/3.13.2(a) 4-3-5/3.13.2(b) 4-3-5/3.13.2(c) 4-3-5/3.15 4-3-5/3.15.1 4-3-5/3.15.2 4-3-5/3.15.2(a) 4-3-5/3.15.2(b) 4-3-5/3.15.2(c) 4-3-5/3.15.3 4-3-5/3.15.4 4-3-5/3.17 4-3-5/3.17.1 4-3-5/3.17.2 4-3-5/3.17.3 4-3-5/3.17.4 4-3-5/3.17.4(a) 4-3-5/3.17.4(b) 4-3-5/3.17.4(c) 4-3-5/3.17.4(d) 4-3-5/3.17.4(e) 4-3-5/3.17.5 4-3-5/3.17.5(a) 4-3-5/3.17.5(b) 4-3-5/3.17.5(c) 4-3-5/3.17.5(d)
电路保护 设置
直流推进电路 电路保护 倒转保护 励磁电路 磁通量缩减 半导体转换器 电压过载保护 电流过载保护 短路保护 滤波电路
半导体转换器提供的直流(DC)的推进电动机 通地泄露的保护 主推进电路 励磁电路 交流电系统 直流电系统 电力推进控制 通则
自动遥控控制系统 测试和检查 控制启动 紧急停止 原动机控制 控制电力失效 保护 联锁
控制站的装备仪器 指示,显示和警报 交流系统仪表 直流系统仪表
电力滑动联轴器仪表 推进系统状态指示 已准备好作业 错误 电力
设备安装与布置 通则
维修中的设备与可达性 可达性 支持设备 电力滑差耦合 半导体转换器 推进电缆 机械设备 材料测试 温度额定值
防止潮气凝结的措施 原动机 功率 速度控制 人工控制 并联工作
再生电力的保护
推进系统中的转动机械 通风和保护 灭火系统 气冷机 温度传感器
74 ABS海上移动平台入级与建造规范·2012
4-3-5/3.7 4-3-5/3.7.1 4-3-5/3.7.2 4-3-5/3.7.2(a) 4-3-5/3.7.2(b) 4-3-5/3.7.3 4-3-5/3.7.4 4-3-5/3.7.5 4-3-5/3.7.5(a) 4-3-5/3.7.5(b) 4-3-5/3.7.5(c) 4-3-5/3.7.5(d) 4-3-5/3.7.6 4-3-5/3.9 4-3-5/3.9.1 4-3-5/3.9.2 4-3-5/3.9.3 4-3-5/3.9.4 4-3-5/3.11 4-3-5/3.11.1 4-3-5/3.11.2 46-1-7/19.17 4-3-5/3.11.3 4-3-5/3.11.4 4-3-5/3.11.5 4-3-5/3.11.6 4-3-5/3.11.7 4-3-5/3.11.8 4-3-5/3.13 4-3-5/3.13.1 4-3-5/3.13.1(a) 4-3-5/3.13.1(b) 4-3-5/3.13.1(c) 4-3-5/3.13.2 4-3-5/3.13.2(a) 4-3-5/3.13.2(b) 4-3-5/3.13.2(c) 4-3-5/3.15 4-3-5/3.15.1 4-3-5/3.15.2 6-1-7/17.1.3 4-3-5/3.15.2(a) 4-3-5/3.15.2(b) 4-3-5/3.15.3 4-3-5/3.15.4 6-1-7/17 6-1-4/3
6-1-7/17.1.1 6-1-7/17.1.1 6-1-3/3.7 6-1-3/3.7.1 6-1-3/3.7.2 6-1-3/3.7.3 6-1-3/3.7.4 6-1-3/3.7.5 6-1-7/17.3.1 6-1-7/17.3.1(a) 6-1-7/17.3.1(b) 6-1-7/17.3.1(c) 6-1-7/17.3.1(d)
通知与总信息
4-3-5/3.17.6 4-3-5/3.17.7 4-3-5/3.17.7(a) 4-3-5/3.17.7(b) 4-3-5/3.17.8 4-3-5/3.17.8(a) 4-3-5/3.17.8(b) 4-3-5/3.17.8(c) 4-3-5/3.17.8(d) 4-3-5/3.17.8(e) 4-3-5/3.17.8(f) 4-3-5/3.17.9 4-3-5/3.17.9(a) 4-3-5/3.17.9(b) 4-3-5/3.17.9(c) 4-3-5/3.17.9(d) 4-3-5/3.17.10 4-3-5/3.17.10(a) 4-3-5/3.17.10(b) 4-3-5/3.17.10(c) 4-3-5/3.17.11 4-3-5/3.17.11(a) 4-3-5/3.17.11(b) 4-3-5/3.17.11(c) 4-3-5/3.17.12 4-3-5/3.17.12(a) 4-3-5/3.17.12(b) 4-3-5/3.17.12(c) 4-3-5/3.17.12(d) 4-3-5/3.17.12(e) 4-3-5/5 4-3-5/5.1 4-3-5/5.3 4-3-5/5.3.1 4-3-5/5.3.2 4-3-5/5.5 4-3-5/7 4-3-5/7.1 4-3-5/7.1.1 4-3-5/7.1.2 4-3-5/7.1.2i) 4-3-5/7.1.2ii) 4-3-5/7.1.2iii) 4-3-5/7.1.2iv) 4-3-5/7.1.2v) 第四部分 第三章 第六节 4-3-6 4-3-6/1 4-3-6/1.1 4-3-6/1.3
推进发电机 直流推进发动机 转子 超速保护 电耦合器 通则
修理可达性 温度额定值 励磁 控制设备 铭牌
推进系统的半导体转换器 通则
测试和检测 强制冷却
水冷转换器的附加要求
半导体转换器配置的电抗器和变压器 通则 电压调节 高温警报 开关
一般设计
发电机和发动机开关 励磁开关 推进电缆 导线
绝缘材料
金属编制铠装和密封金属套管 内部绕组 测试
三线双电压直流系统 三线直流钻井机构发电机 中点接地 总配电板 应急配电板 中性导线尺寸 钻井操作相关系统 应急关机设备 关机装置 关机后的操作
机械设备及系统
机械,设备,和它们的安装 危险区域 危险区域 定义 危险区域 封闭空间
6-1-7/17.3.2 6-1-7/17.3.3 6-1-7/17.3.3(a) 6-1-7/17.3.3(b) 6-1-7/17.3.4 6-1-7/17.3.4(a) 6-1-7/17.3.4(b) 6-1-7/17.3.4(c) 6-1-7/17.3.4(d) 6-1-7/17.3.4(e) 6-1-7/17.3.4(f) 6-1-7/17.3.5 6-1-7/17.3.5(a) 6-1-7/19.13 6-1-7/17.3.5(b) 6-1-7/17.3.5(c) 6-1-7/17.3.6 6-1-7/17.3.6(a) 6-1-7/17.3.6(b) 6-1-7/17.3.6(c) 4-3-5/3.17.2 4-3-5/3.17.2(a) 4-3-5/3.17.2(b) 4-3-5/3.17.2(c) 6-1-7/17.3.7 6-1-7/17.3.7(a) 6-1-7/17.3.7(b) 6-1-7/17.3.7(c) 6-1-7/17.3.7(d) 6-1-7/19.15 4-3-5/5 4-3-5/5.1 4-3-5/5.3 4-3-5/5.3.1 4-3-5/5.3.2 4-3-5/5.5 4-3-5/7 4-3-5/7.1 4-3-5/7.1 4-3-5/7.1.2 4-3-5/7.1.2i) 4-3-5/7.1.2ii) 4-3-5/7.1.2iii) 4-3-5/7.1.2iv) 4-3-5/7.1.2v)
4-3-6/1.5 半封闭空间 4-3-6/3 区域的划分 4-3-6/3.1 0类危险区域 4-3-6/3.1i) 4-3-6 4-3-6/1.1 4-3-6/1.3 4-3-6/1.5
4-3-6/3 Classification of Areas 4-3-6/1.5 4-3-6/5 4-3-6/5.1
4-3-6/5.1i)
ABS海上移动平台入级与建造规范·2012 75
通知与总信息
4-3-6/3.1ii) 4-3-6/5.1ii) 4-3-6/3.1iii) 4-3-6/5.1iii) 4-3-6/3.3 4-3-6/5.3 1类危险区域 4-3-6/3.3i) 4-3-6/5.3i) 4-3-6/3.3ii) 4-3-6/5.3ii) 4-3-6/3.3iii) 4-3-6/5.3iii) 4-3-6/3.3iv) 4-3-6/5.3iv) 4-3-6/3.3v) 4-3-6/5.3v) 4-3-6/3.5 4-3-6/5.5 2类危险区域 4-3-6/3.5i) 4-3-6/5.5i) 4-3-6/3.5ii) 4-3-6/5.5ii) 4-3-6/3.5iii) 4-3-6/5.5iii) 4-3-6/3.5iv) 4-3-6/5.5iv) 4-3-6/3.5v) 4-3-6/5.5v) 4-3-6/3.5vi) 4-3-6/5.5vi) 4-3-6/3.5vii) 4-3-6/5.5vii) 4-3-6/3.5viii) 4-3-6/5.5viii) 4-3-6/3.5ix) 4-3-6/5.5ix) 4-3-6/5 4-3-6/7 影响危险区域范围的开口、入口和通风情况 4-3-6/5.1 4-3-6/7.1 4-3-6/5.1i) 4-3-6/7.1i) 4-3-6/5.1ii) 4-3-6/7.1ii) 4-3-6/5.1iii) 4-3-6/7.1iii) 4-3-6/5.3 4-3-6/7.3 4-3-6/5.3i) 4-3-6/7.3i) 4-3-6/5.3ii) 4-3-6/7.3ii) 4-3-6/5.3iii) 4-3-6/7.3iii) 4-3-6/5.5 4-3-6/7.5 4-3-6/5.5i) 4-3-6/7.5i) 4-3-6/5.5ii) 4-3-6/7.5ii) 4-3-6/5.5iii) 4-3-6/7.5iii) 4-3-6/7 4-3-6/9 通风 4-3-6/7.1 4-3-6/9.1 通则 4-3-6/7.3 4-3-6/9.3 危险区域通风 4-3-6/7.5 4-3-6/9.5 非危险区域通风 4-3-6/9 4-3-6/11 机械设备 4-3-6/9.1 4-3-6/11 通则 4-3-6/9.3 4-3-6/11 危险区域 4-3-6/图 1 危险区域 4-3-6/图 1 4-3-6/图 2 危险区域 4-3-6/图 2 4-3-6/图 3 危险区域 4-3-6/图 3 第五部分 消防和安全 - 措施和特点 第一章 被动防火 第一节 通则
5-1-1 5-1-1 通则
5-1-1/1 5-1-1/1 总则
5-1-1/1.1 5-1-1/1.1 行政部门审查
5-1-1/1.3 5-1-1/1.3 ABS审查
5-1-1/1.5 5-1-1/1.5 包含石棉的原料
5-1-1/3 5-1-1/3 结构防火
5-1-1/3.1 5-1-1/3.1 结构材料
5-1-1/3.3 5-1-1/3.3 可替换材料
5-1-1/3.7 5-1-1/3.5 船舱壁与甲板的整体防火
5-1-1/3.9 5-1-1/3.7 表格的应用
5-1-1/3.7.1 5-1-1/3.9.1 5-1-1/3.7.2 5-1-1/3.9.2
76 ABS海上移动平台入级与建造规范·2012
通知与总信息
5-1-1/3.7.2(1) 5-1-1/3.7.2(2) 5-1-1/3.7.2(3) 5-1-1/3.7.2(4) 5-1-1/3.7.2(5) 5-1-1/3.7.2(6) 5-1-1/3.7.2(7) 5-1-1/3.7.2(8) 5-1-1/3.7.2(9) 5-1-1/3.7.2(10) 5-1-1/3.7.2(11) 5-1-1/3.9 5-1-1/3.11 5-1-1/3.13 5-1-1/3.15 5-1-1/3.15i) 5-1-1/3.15ii) 5-1-1/3.15iii) 5-1-1/3.15iv) 5-1-1/3.15v) 5-1-1/3.17 5-1-1/3.17i) 5-1-1/3.17ii) 5-1-1/3.17iii) 5-1-1/3.19 5-1-1/3.21 5-1-1/3.21i) 5-1-1/3.21ii) 5-1-1/3.21iii) 5-1-1/5 5-1-1/5.1 5-1-1/5.3
5-1-1/3.9.2(1) 5-1-1/3.9.2(2) 5-1-1/3.9.2(3) 5-1-1/3.9.2(4) 5-1-1/3.9.2(5) 5-1-1/3.9.2(6) 5-1-1/3.9.2(7) 5-1-1/3.9.2(8) 5-1-1/3.9.2(9) 5-1-1/3.9.2(10) 5-1-1/3.9.2(11) 5-1-1/3.11 5-1-1/3.14 5-1-1/3.15 5-1-1/3.17 5-1-1/3.17i) 5-1-1/3.17ii) 5-1-1/3.17iii) 5-1-1/3.17iv) 5-1-1/3.17v) 5-1-1/3.19 5-1-1/3.19i) 5-1-1/3.19ii) 5-1-1/3.19iii) 5-1-1/3.21 5-1-1/3.23 5-1-1/3.23i) 5-1-1/3.23ii) 5-1-1/3.23iii)
5-1-1/5 起居舱室,工作室及控制站的防火
5-1-1/5.7
5-1-1/5.9 5-1-1/3.17vi)
5-1-1/5.5 5-1-1/5.9 5-1-1/5.7 5-1-1/5.11 5-1-1/5.9 5-1-1/5.13 5-1-1/5.11 5-1-1/5.15 5-1-1/5.13 5-1-1/5.17 5-1-1/5.13i) 5-1-1/5.17i) 5-1-1/5.13ii) 5-1-1/5.17ii) 5-1-1/5.13iii) 5-1-1/5.17iii) 5-1-1/5.15 5-1-1/5.19 5-1-1/5.17 5-1-1/5.21 5-1-1/5.19 5-1-1/5.23 5-1-1/5.21 5-1-1/5.25 5-1-1/5.21i) 5-1-1/5.25i) 5-1-1/5.21ii) 5-1-1/5.25ii) 5-1-1/5.21iii) 5-1-1/5.25iii) 5-1-1/5.23 5-1-1/5.27 5-1-1/5.23i) 5-1-1/5.27i) 5-1-1/5.23ii) 5-1-1/5.27ii) 5-1-1/5.23iii) 5-1-1/5.27iii) 5-1-1/5.25 5-1-1/5.29 5-1-1/5.25i) 5-1-1/5.29i) 5-1-1/5.25ii) 5-1-1/5.29ii) 5-1-1/5.25iii) 5-1-1/5.29iii) 5-1-1/5.25iv) 5-1-1/5.29v) 5-1-1/5.25v) 5-1-1/5.29vi) 5-1-1/5.25.1 5-1-1/5.29.1
ABS海上移动平台入级与建造规范·2012 77
通知与总信息
5-1-1/5.25.1i) 5-1-1/5.25.1ii) 5-1-1/5.25.1iii) 5-1-1/5.25.1iv) 5-1-1/5.25.1v) 5-1-1/5.25.1vi) 5-1-1/5.27 5-1-1/5.27i) 5-1-1/5.27ii) 5-1-1/5.27iii) 5-1-1/5.27iv) 5-1-1/5.27v) 5-1-1/5.29 5-1-1/5.31 5-1-1/5.29.1i) 5-1-1/5.29.1ii) 5-1-1/5.29.1iii) 5-1-1/5.29.1iv) 5-1-1/5.29.1v) 5-1-1/5.29.1vi) 5-1-1/5.31 5-1-1/5.31i) 5-1-1/5.31ii) 5-1-1/5.31iii) 5-1-1/5.31iv) 5-1-1/5.31v) 5-1-1/5.33
5-1-1/5.35 5-1-1/5.37
5-1-1/5.31i) 5-1-1/5.37i) 5-1-1/5.31ii) 5-1-1/5.37ii) 5-1-1/5.31iii) 5-1-1/5.37iii) 5-1-1/5.31iv) 5-1-1/5.37iv) 5-1-1/5.33 5-1-1/5.39 5-1-1/5.35 5-1-1/5.41 5-1-1/5.37 5-1-1/5.43 5-1-1/5.37i) 5-1-1/5.43i) 5-1-1/5.37ii) 5-1-1/5.43ii) 5-1-1/5.37iii) 5-1-1/5.43iii) 5-1-1/5.39 5-1-1/5.45 5-1-1/5.41 5-1-1/5.47 5-1-1/5.41i) 5-1-1/5.47i) 5-1-1/5.41ii) 5-1-1/5.47ii) 5-1-1/5.41iii) 5-1-1/5.47iii) 5-1-1/5.41iv) 5-1-1/5.47iv) 5-1-1/表 1 船舱壁分隔相邻空间的整体防火 5-1-1/表 1 5-1-1/表2 甲板分隔相邻空间的整体防火 5-1-1/表2 5-1-1/图 1 管道贯穿“A”级隔板 5-1-1/图 1 5-1-1/图 2 管道贯穿“B”级隔板 5-1-1/图 2 5-1-1/图 3 贯穿“A”级隔板的通风管道 5-1-1/图 3 5-1-1/图 4 贯穿“B”级隔板的通风管道 5-1-1/图 4 第五部分 消防和安全 - 措施和特点 第二章 主动防火系统和设备 第一节 通则 5-2-1/1 5-2-1/1 授权 5-2-1/3 5-2-1/3 方案与详细说明 5-2-1/3.1 5-2-1/3.1 总则 5-2-1/3.3 5-2-1/3.3 防火方案 第五部分 消防和安全 - 措施和特点 第二章 主动防火系统和设备 第二节 固定灭火系统 5-2-2 5-2-2 固定灭火系统 5-2-2/1 5-2-2/1 消防主系统 5-2-2/1.1 5-2-2/1.1 消防泵 5-2-2/1.1.1 5-2-2/1.1.1 泵的数量 5-2-2/1.1.2 5-2-2/1.1.2 泵的位置 5-2-2/1.1.2(a) 5-2-2/1.1.2(a) 位置 5-2-2/1.1.2(a)i) 5-2-2/1.1.2(a)i) 5-2-2/1.1.2(a)ii) 5-2-2/1.1.2(a)ii) 5-2-2/1.1.2(a)ii) 5-2-2/1.1.2(a)ii)
78 ABS海上移动平台入级与建造规范·2012
通知与总信息
5-2-2/1.1.2(b) 5-2-2/1.1.2(b) 远程操作 5-2-2/1.1.3 5-2-2/1.1.3 泵的类型 5-2-2/1.1.4 5-2-2/1.1.4 压力 5-2-2/1.1.5 5-2-2/1.1.5 泵的容量 5-2-2/1.1.5(a) 5-2-2/1.1.5(a) 总则 5-2-2/1.1.5(b) 5-2-2/1.1.5(b) 船型钻井平台 5-2-2/1.1.5(b)i) 5-2-2/1.1.5(b)i) 总泵容量 5-2-2/1.1.5(b)ii) 5-2-2/1.1.5(b)ii) 单独的泵容量 5-2-2/1.1.6 5-2-2/1.1.6 安全阀 5-2-2/1.1.7 5-2-2/1.1.7 中间液舱供水 5-2-2/1.1.7(a) 5-2-2/1.1.7(a) 液舱容量 5-2-2/1.1.7(b) 5-2-2/1.1.7(b) 特征 5-2-2/1.1.7(b)i) 5-2-2/1.1.7(b)i) 5-2-2/1.1.7(b)ii) 5-2-2/1.1.7(b)ii) 5-2-2/1.1.7(b)iii) 5-2-2/1.1.7(b)iii) 5-2-2/1.1.8 5-2-2/1.1.8 受压主供水系统 5-2-2/1.3 5-2-2/1.3 消防水管 5-2-2/1.3.1 5-2-2/1.3.1 尺寸 5-2-2/1.3.2 5-2-2/1.3.2 水龙头或阀 5-2-2/1.3.3 5-2-2/1.3.3 隔离 5-2-2/1.3.4 5-2-2/1.3.4 寒冷天气保护 5-2-2/1.3.5 5-2-2/1.3.5 材料 5-2-2/1.3.6 5-2-2/1.3.6 通用接口 5-2-2/1.5 5-2-2/1.5 消防栓,水龙带和喷嘴 5-2-2/1.5.1 5-2-2/1.5.1 消防栓 5-2-2/1.5.2 5-2-2/1.5.2 水龙带 5-2-2/1.5.3 5-2-2/1.5.3 喷嘴 5-2-2/1.5.4 5-2-2/1.5.4 国际海岸的通用接口 5-2-2/图 1 国际海岸的通用接口 5-2-2/图 1 第五部分 消防和安全 - 措施和特点 第二章 主动防火系统和设备 第三节 附加固定的消防系统 5-2-3 5-2-3 附加固定的消防系统 5-2-3/1 5-2-3/1 固定的消防系统 5-2-3/1i) 5-2-3/1i) 5-2-3/1ii) 5-2-3/1ii) 5-2-3/1iii) 5-2-3/1iii) 5-2-3/1iv) 5-2-3/1iv) 5-2-3/1v) 5-2-3/1v) 5-2-3/3 5-2-3/3 闭气 5-2-3/3.1 5-2-3/3.1 通则 5-2-3/3.1.1 5-2-3/3.1.1 储存 5-2-3/3.1.2 5-2-3/3.1.2 设计 5-2-3/3.1.3 5-2-3/3.1.3 报警 5-2-3/3.1.3(a) 5-2-3/3.1.3(a) 电动 5-2-3/3.1.3(b) 5-2-3/3.1.3(b) 气动 5-2-3/3.1.4 5-2-3/3.1.4 控制 5-2-3/3.3 5-2-3/3.3 二氧化碳系统 5-2-3/5 5-2-3/5 泡沫 5-2-3/5.1 5-2-3/5.1 固定的高压膨胀性的泡沫系统 5-2-3/5.3 5-2-3/5.3 低膨胀性的泡沫系统 5-2-3/5.3.1 5-2-3/5.3.1 应用
ABS海上移动平台入级与建造规范·2012 79
通知与总信息
5-2-3/5.3.2 5-2-3/7 5-2-3/9 5-2-3/9.1 5-2-3/9.3 5-2-3/9.3.1 5-2-3/9.3.2 5-2-3/9.3.3 5-2-3/9.3.4 5-2-3/11 5-2-3/11.1
设计
固定的高压喷水系统 手提式灭火器及防火砂 通则 消防系统 水龙头喷嘴 便携式灭火器 备用系统 固定泡沫系统
油漆和易燃液体保险箱
4平方米(43平方英尺)或者更大区域到住宿区通道的锁扣装置
5-2-3/5.3.2 5-2-3/7 5-2-3/9 5-2-3/9.1 5-2-3/9.3 5-2-3/9.3.1 5-2-3/9.3.2 5-2-3/9.3.3 5-2-3/9.3.4 5-2-3/11 5-2-3/11.1
5-2-3/11.1i) 5-2-3/11.1i) 5-2-3/11.1ii) 5-2-3/11.1ii) 5-2-3/11.1iii) 5-2-3/11.1iii) 5-2-3/11.1iv) 5-2-3/11.1iv) 不到4平方米(43平方英尺)且没有通向住宿区的通道 5-2-3/11.3 5-2-3/11.3
第五部分 消防和安全 - 措施和特点 第二章 主动防火系统和设备 第四节 便携式灭火系统 5-2-4 5-2-4 便携式灭火系统 5-2-4/1 5-2-4/1 手提式灭火器和防火沙 5-2-4/1.1 5-2-4/1.1 灭火器 5-2-4/1.3 5-2-4/1.3 防火沙 5-2-4/3 5-2-4/3 消防队员装备 5-2-4/3.1 5-2-4/3.1 编号 5-2-4/3.3 5-2-4/3.3 氧气呼吸器 5-2-4/3.3i) 5-2-4/3.3i) 5-2-4/3.3ii) 5-2-4/3.3ii) 5-2-4/3.5 5-2-4/3.7 救生索 5-2-4/3.7 5-2-4/3.9 安全灯和斧 5-2-4/3.9 5-2-4/3.11 靴子与手套 5-2-4/3.11 5-2-4/3.13 头盔 5-2-4/3.13 5-2-4/3.15 防护衣 5-2-4/表 1 手提与半手提式灭火器的分类 5-2-4/表 1 5-2-4/表 2 手提与半手提式灭火器系统 5-2-4/表 2
第五部分 消防和安全 - 措施和特点
第二章 主动防火系统和设备 第五节 火灾和气体探测 5-2-5 5-2-5 火灾和气体检测 5-2-5/1 5-2-5/1 其它防火要求 5-2-5/1.1 5-2-5/1.1 火灾探测与警报系统 5-2-5/1.3 5-2-5/1.3 总报警器 5-2-5/1.5 5-2-5/1.5 底舱水平报警 5-2-5/1.7 5-2-5/1.7 排风系统警报 5-2-5/3 5-2-5/3 可燃气体探测与警报系统 5-2-5/3i) 5-2-5/3i) 5-2-5/3ii) 5-2-5/3ii) 5-2-5/3iii) 5-2-5/3iii) 5-2-5/3iv) 5-2-5/3iv) 5-2-5/3v) 5-2-5/3v) 第五部分 消防和安全 - 措施和特点 第三章 配备用具 80 ABS海上移动平台入级与建造规范·2012
通知与总信息
第一节 通则 5-3-1/1 逃生方法 5-3-1/1.1 5-3-1/1.1.1 5-3-1/1.1.2 5-3-1/1.1.3 5-3-1/1.3 5-3-1/1.3.1 5-3-1/1.3.2 5-3-1/1.5 5-3-1/1.7 5-3-1/1.9 5-3-1/3 入口和出口方法 5-3-1/5 防护和扶手 5-3-1/5.1 甲板底板区域和开口 5-3-1/5.3 直升机甲板 5-3-1/7 紧急控制站 5-3-1/9 机舱内的布置 5-3-1/9.1 排风扇和卡口 5-3-1/9.1.1 通则 5-3-1/9.1.2 机械舱室释放的烟雾 5-3-1/9.3 其它辅助设备 5-3-1/9.5 油箱吸管 5-3-1/9.7 燃油组件 5-3-1/11 滤油器的隔离 5-3-1/11i) 5-3-1/11ii) 5-3-1/11iii) 5-3-1/11iv) 5-3-1/13 轮盘区域 5-3-1/15 机舱内的火灾预警 5-3-1/15i) 5-3-1/15ii) 5-3-1/15iii) 5-3-1/15iv) 第六部分 检验 第一章 建造过程中的检验 第一节 通则 6-1-1 通则 6-1-1/1 通则 6-1-1/3 建造中检验 6-1-1/3.1 结构制造/安装 6-1-1/3.1.1 6-1-1/3.1.1(a) 6-1-1/3.1.1(b) 6-1-1/3.1.1(c) 6-1-1/3.1.1(d) 6-1-1/3.1.1(e) 6-1-1/3.1.1(f) 6-1-1/3.1.1(g) 6-1-1/3.1.1(h) 6-1-1/3.1.1(i)
钢结构检验 质量管理方案
材料的质量和可追溯性 型钢
焊工的资格和记录 焊接工艺规范和资质 焊缝检测
容许误差和调整 腐蚀控制系统
密封性和水压试验程序
5-3-1/1
5-3-1/1.1 5-3-1/1.1.1 5-3-1/1.1.2 5-3-1/1.1.3 5-3-1/1.3 5-3-1/1.3.1 5-3-1/1.3.2 5-3-1/1.5 5-3-1/1.7 5-3-1/1.9 5-3-1/3 5-3-1/5 5-3-1/5.1 5-3-1/5.3 5-3-1/7 5-3-1/9 5-3-1/9.1 5-3-1/9.1.1 5-3-1/9.1.2 5-3-1/9.3 5-3-1/9.5 5-3-1/9.7 5-3-1/11
5-3-1/11i) 5-3-1/11ii) 5-3-1/11iii) 5-3-1/11iv) 5-3-1/13 5-3-1/15
5-3-1/15i) 5-3-1/15ii) 5-3-1/15iii) 5-3-1/15iv)
6-1-1, 7-1-1, 7-1-2 7-1-1/1 ---
7-1-1/3.1 7-1-2/3 ---
7-1-2/3 7-1-2/5.1 7-1-2/5.5 7-1-2/7 7-1-2/7 7-1-2/9 7-1-2/9 ---
7-1-2/23.1
ABS海上移动平台入级与建造规范·2012 81
通知与总信息
6-1-1/3.1.1(j) 6-1-1/5 6-1-1/5.1 6-1-1/5.3 第六部分 第一章 第二节 6-1-2 6-1-2/1 6-1-2/1.1 6-1-2/1.3 6-1-2/1.5 6-1-2/3 6-1-2/3.1 6-1-2/3.3 6-1-2/3.5 6-1-2/3.7 6-1-2/5 6-1-2/5.1 6-1-2/5.3 6-1-2/5.5 6-1-2/5.7 6-1-2/7 6-1-2/9 6-1-2/9.1 6-1-2/9.1.1 6-1-2/9.1.2 6-1-2/9.1.3 6-1-2/9.3 6-1-2/11 6-1-2/13 6-1-2/13.1 6-1-2/13.3 6-1-2/13.5 6-1-2/13.7 6-1-2/13.9 6-1-2/13.11 6-1-2/13.13 6-1-2/13.15 6-1-2/15 6-1-2/17 6-1-2/18 6-1-2/19 6-1-2/21 6-1-2/23 6-1-2/23.1 6-1-2/23.1.1 6-1-2/23.1.2 6-1-2/13.1.3 6-1-2/23.1.4
无损检测 设备检验 总则
供应商点检验 检验
建造过程中的检验 测试和试验 测试和试验
水密隔舱测试 总则 软管测试 气密试验 液舱舱壁测试 总则
静水压试验 气密试验 结构测试 升降装置 原型试验 测试前准备 测试 后续测试
最初的顶升测试
旋转机械 - 测试和检验 应用
100千瓦及以上电机 低于100千瓦电机 其它电机 特殊测试安排
移动式悬臂以及滑动梁的测试 金属管道系统的压力测试 油燃料伺服系统
油燃料吸入和运送管路 启动空气管 液压动力管 所有管路 特殊系统
壳阀流体静力学测试
流体静力学测试中的空气测试 泵水压试验 泵容量试验 安全阀能力测试
塑塑胶管安装后在船上的测试 固定氧炔装置测试
配电板、配电板、控制器等。- - - - - -测试和检查 应用 配电盘 电机控制器 电机控制中心
电池充电器装置,不间断电源系统(UPS)装置,和配
7-1-2/11 ---
6-1-1/5.3 7-1-1/3 6-1-1/5.3
6-1-3, 6-1-6, 6-1-7, 7-1-2, 7-1-4, 7-1-6, 7-1-9 ---
7-1-2/23.3 7-1-2/23. 11 7-1-2/23.9 ---
7-1-2/23.3 7-1-2/23.5 7-1-2/23.9 7-1-2/23.7 6-1-3/25.3 6-1-3/25.3 6-1-3/25.3i) 6-1-3/25.3ii) 6-1-3/25.3iii) 7-1-9/9.1 --- ---
7-1-9/19.1 6-1-7/5.1.1 --- ---
7-1-9/9.3 7-1-4/41.1 7-1-4/41.1.1 7-1-4/41.1.2 7-1-4/41.1.3 7-1-4/41.1.4 7-1-4/41.1.7 7-1-4/41.1.5 7-1-4/41.5 7-1-4/41.3 6-1-6/7.3.2(a) 6-1-6/7.3.2(b) 6-1-6/7.3.2(c) 7-1-4/41.7 7-1-4/41.9 --- ---
6-1-7/19.5 6-1-7/19.7 6-1-7/19.7 6-1-7/19.9
82 ABS海上移动平台入级与建造规范·2012
通知与总信息
6-1-2/23.1.5 6-1-2/23.2 6-1-2/25 6-1-2/25i) 6-1-2/25ii) 6-1-2/25iii) 6-1-2/27 6-1-2/27.1 6-1-2/27.3 6-1-2/29 6-1-2/29.1 6-1-2/29.3 6-1-2/29.5 6-1-2/31 6-1-2/33 第六部分 第二章 第一节 6-2-1 6-2-1/1 6-2-1/1.1 6-2-1/3 6-2-1/3.1 6-2-1/3.3 6-2-1/3.5 6-2-1/3.7 6-2-1/3.9 6-2-1/3.11 6-2-1/3.13 6-2-1/3.15 6-2-1/3.17 6-2-1/3.19 6-2-1/3.21 6-2-1/5 6-2-1/7 6-2-1/7.1 6-2-1/7.3 6-2-1/7.5 6-2-1/9 6-2-1/11 6-2-1/11.1 6-2-1/11.3 6-2-1/13 6-2-1/15 6-2-1/15.1 6-2-1/15.3 第六部分 第二章 第二节 6-2-2 6-2-2/1
电板 测试项目 特殊测试安排 变压器-测试 --- --- ---
电器作业试验
钻井平台主要服务的电气安装 通讯设施
自航式钻井平台试验 完整动力 衰减动力 机构运转
非航式钻井平台试验 坞试和海试 检验
建造后的检验
建造后的检验条件 建造后的检验条件 应用
第2章第1到10节 定义 压载舱 腐蚀
腐蚀控制系统 关键结构区
区域周长(横截面) 板 检验
代表控制室/储罐 控制室 可疑区域 风和水列板
检验通知和可用性 损坏、故障和维修 检查维修 修理 陈诉 更改
焊接及更换材料 普通和高强度钢结构 特殊材料 不完工检验 搁置和恢复使用 无作业航区平台 大湖区的航区平台 检验
建造后的检验 检验间隔 检验间隔
无作业航区平台
--- ---
6-1-7/19.11 6-1-7/19.11i) 6-1-7/19.11 ii) 6-1-7/19.11iii) ---
7-1-6/21 7-1-9/11.7 7-1-9/11.9 7-1-9/13 7-1-9/13.1 7-1-9/13.3 7-1-9/13.5 7-1-9/11 7-1-9/1
7-2-1 7-2-1/1 7-2-1/1.1 7-2-1/3 7-2-1/3.1 7-2-1/3.3 7-2-1/3.5 7-2-1/3.7 7-2-1/3.9 7-2-1/3.11 7-2-1/3.13 7-2-1/3.15 7-2-1/3.17 7-2-1/3.19 7-2-1/3.21 7-2-1/5 7-2-1/7 7-2-1/7.1 7-2-1/7.3 7-2-1/7.5 7-2-1/9 7-2-1/11 7-2-1/11.1 7-2-1/11.3 7-2-1/13 7-2-1/15 7-2-1/15.1 7-2-1/15.3
7-2-2 7-2-2/1
ABS海上移动平台入级与建造规范·2012 83
通知与总信息
6-2-2/1.1 7-2-2/1.1 年度检验 6-2-2/1.3 7-2-2/1.3 特定周期检验 6-2-2/1.5 7-2-2/1.5 连续检验 6-2-2/1.7 7-2-2/1.7 在线检验 6-2-2/1.9 7-2-2/1.9 入干坞检验或等同 6-2-2/1.9.1 7-2-6/3 代替干坞的水下检验 6-2-2/1.11 7-2-2/1.11 艉轴检验 6-2-2/1.11.1 7-2-2/1.11.1 专门在淡水中的润滑轴承 6-2-2/1.11.2 7-2-2/1.11.2 在淡水和海水中的润滑轴承 6-2-2/1.11.2(a) 单螺杆 7-2-2/1.11.2(a)
7-2-2/1.11.2(b) 6-2-2/1.11.2(b) 多螺杆
7-2-2/1.11.2(c) 6-2-2/1. 11.2(c) 连续式衬套或等同
--- 7-2-2/1.11.2i) 6-2-2/1. 11.2i)
--- 7-2-2/1.11.2ii) 6-2-2/1. 11.2ii)
6-2-2/1.11.3 7-2-2/1.11.3 油润滑轴承 6-2-2/1.11.4 7-2-2/1.11.4 扩展 - 水润滑轴承
7-2-2/1.11.4(a) 6-2-2/1.11.4(a) 延长到三(3)个月
7-2-2/1.11.4(b) 6-2-2/1.11.4(b) 延长到一年
6-2-2/1.11.5 7-2-2/1.11.5 扩展—油润滑轴承 6-2-2/1.11.5(a) 延长到三(3)个月 7-2-2/1.11.5(a)
7-2-2/1.11.5(b) 6-2-2/1.11.5(b) 延长到一年
7-2-2/1.11.5(c) 6-2-2/1.11.5(c) 延长不超过五(5)年
6-2-2/1.13 7-2-2/1.13 锅炉辅机检验 6-2-2/3 7-2-2/3 平台 – 在大湖服务作业 第六部分 检验 第二章 建造后的检验 第三节 检验的预先计划 6-2-3 7-2-3 检验的预先计划 6-2-3/1 7-2-3/1 特殊检验,入坞检验,代替干坞检验的水下检验 第六部分 检验 第二章 建造后的检验 第四节 年度检验 6-2-4 7-2-4 年度检验 6-2-4/1 7-2-4/1 年度检验-船体 6-2-4/1.1 7-2-4/1.1 所有类型的移动式海上钻井平台 6-2-4/1.1.1 --- 7-2-4/1.1.1 6-2-4/1.1.2 --- 7-2-4/1.1.1 6-2-4/1.1.3 --- 7-2-4/1.1.2 6-2-4/1.1.4 --- 7-2-4/1.1.3 6-2-4/1.1.5 --- 7-2-4/1.1.4 6-2-4/1.1.6 --- 7-2-4/1.1.5 6-2-4/1.1.7 --- 7-2-4/1.1.6 6-2-4/1.1.8 --- 7-2-4/1.1.7 6-2-4/1.1.9 --- 7-2-4/1.1.8 6-2-4/1.3 7-2-4/1.1.10 腐蚀控制系统 6-2-4/1.5 7-2-4/1.1.11 负荷线的变更和位置 6-2-4/1.7 7-2-4/1.3 水面式平台 6-2-4/1.9 7-2-4/1.5 自升式平台 6-2-4/1.11 7-2-4/1.7 柱稳式平台 6-2-4/3 7-2-4/3 年度检验——机械和电气系统 6-2-4/3.1 7-2-4/31. 非自航式平台 6-2-4/3.3 7-2-4/3.3 自航式平台 6-2-4/3.5 7-2-4/3.5 预防性维护技术 6-2-4/3.7 7-2-4/3.7 大修期间的检查
84 ABS海上移动平台入级与建造规范·2012
通知与总信息
6-2-4/3.9 短时间间隔的检查 6-2-4/5 推进器和动力定位系统
建设 第六部分
建造后的检验 第二章
特定周期检验 第五节
6-2-5 特定周期检验 6-2-5/1 特定周期检验—--船体一号 6-2-5/1.1 通则----所有类型的移动式海上钻井平台 6-2-5/1.1.1 --- 6-2-5/1.1.2 --- 7-2-4/3.9 7-2-4/5
7-2-5 7-2-5/1 7-2-5/1.1
7-2-5/1.1.1 7-2-5/1.1.2 7-2-5/1.1.3 7-2-5/1.1.4 7-2-5/1.1.5
6-2-5/1.1.3 --- 7-2-5/1.1.6 6-2-5/1.1.4 --- 7-2-5/1.1.7 6-2-5/1.1.5 --- 7-2-5/1.1.8 6-2-5/1.1.6 --- 7-2-5/1.1.9 6-2-5/1.1.7 --- 7-2-5/1.1.10 6-2-5/1.1.8 --- 7-2-5/1.1.11 6-2-5/1.1.9 --- 7-2-5/1.1.12
7-2-5/1.1.13
6-2-5/1.3 7-2-5/1.3 水面式平台 6-2-5/1.3.1 --- 7-2-5/1.3.1. 6-2-5/1.5 7-2-5/1.5 自升式平台 6-2-5/1.5.1 --- 7-2-5/1.5.1 6-2-5/1.5.2 --- 7-2-5/1.5.2 6-2-5/1.5.3 --- 7-2-5/1.5.3 6-2-5/1.5.4 --- 7-2-5/1.5.4 6-2-5/1.5.5 --- 7-2-5/1.5.5 6-2-5/1.5.6 --- 7-2-5/1.5.6 6-2-5/1.7 7-2-5/1.7 柱稳式平台 6-2-5/3 7-2-5/3 特定检验2号和后续检验 6-2-5/3.1 7-2-5/3.1 通则 6-2-5/3.3 7-2-5/3.9 厚度测量要求 6-2-5/3.5 --- 无损检测 6-2-5/3.5.1 7-2-5/3.5 柱稳式平台 6-2-5/3.5.1i) 7-2-5/3.5i) --- 6-2-5/3.5.1ii) 7-2-5/3.5ii) --- 6-2-5/3.5.1iii) 7-2-5/3.5iii) --- 6-2-5/3.5.1iv) 7-2-5/3.5iv) --- 6-2-5/3.5.1v) 7-2-5/3.5v) --- 6-2-5/3.5.1vi) 7-2-5/3.5vi) --- 6-2-5/3.5.1vii) 7-2-5/3.5vii) --- 6-2-5/3.5.2 7-2-5/3.3 自升式平台 6-2-5/3.5.2i) 7-2-5/3.3i) --- 6-2-5/3.5.2ii) 7-2-5/3.3ii) --- 6-2-5/3.5.2iii) 7-2-5/3.3iii) --- 6-2-5/3.5.2iv) 7-2-5/3.3iv) --- 6-2-5/3.5.3 7-2-5/3.7 记录 6-2-5/3.5.3i) --- 7-2-5/3.7.1 6-2-5/3.5.3ii) --- 7-2-5/3.7.2 6-2-5/5 7-2-5/5 特定周期检验 - 机械 6-2-5/5.1 7-2-5/5.1 和船体特殊周期检验的相互关系 6-2-5/5.3 7-2-5/5.3 需检验的部件
7-2-5/5.5
6-2-5/5.3.1 --- 7-2-5/5.3.1 6-2-5/5.3.2 --- 7-2-5/5.3.2
ABS海上移动平台入级与建造规范·2012 85
通知与总信息
7-2-5/5.3.3 7-2-5/5.3.4
6-2-5/5.3.3 --- 7-2-5/5.3.5 6-2-5/5.3.4 --- 7-2-5/5.3.6 6-2-5/7 7-2-5/7 特定周期检验——电器设备 6-2-5/7.1 7-2-5/7.1 特定周期检验——船体 6-2-5/7.3. 7-2-5/7.3 需检验的部件 6-2-5/7.3.1 --- 7-2-5/7.3.1 6-2-5/7.3.2 --- 7-2-5/7.3.2 6-2-5/7.3.3 --- 7-2-5/7.3.3 6-2-5/7.3.4 --- 7-2-5/7.3.4 6-2-5/7.3.5 --- 7-2-5/7.3.5 6-2-5/7.3.6 --- 7-2-5/7.3.7 6-2-5/7.5 7-2-5/7.5 自航式平台 - 主推进器 6-2-5/7.7 7-2-5/7.7 主要修理 6-2-5/9 7-2-5/9 特定周期检验- 特殊功能(所有类型) 6-2-5/9.1 7-2-5/9.1 和船体危险区域特殊周期检验的相互关系 6-2-5/9.3 7-2-5/9.3 危险区域 6-2-5/9.5 7-2-5/9.5 远程关闭布置 6-2-5/9.7 7-2-5/9.7 自动消防系统 6-2-5/9.9 7-2-5/9.9 主动的消防系统和设备 6-2-5/9.11 7-2-5/9.11 供应 6-2-5/9.13 7-2-5/9.13 管道系统配套的钻井系统 6-2-5/9.15 7-2-5/9.15 自升式钻井单位——桩腿升降系统 6-2-5/11 7-2-5/11 推进器和动力定位系统 6-2-5/13 7-2-5/13 有可伸缩推进器的平台 6-2-5/表 1 水面式平台的厚度测量要求 7-2-5/表 1 6-2-5/表 2 自升式平台的厚度测量要求 7-2-5/表 2 6-2-5/表 3 柱稳式平台的厚度测量要求 7-2-5/表 3
检验 第六部分
建造后的检验 第二章
入干坞检验或等同 第六节
6-2-6 7-2-6 入干坞检验或等同 6-2-6/1 7-2-6/1 需检验的部件 6-2-6/1.1 7-2-6/1.1 水面式平台(船型或驳船型平台) 6-2-6/1.3 7-2-6/1.3 自升式平台 6-2-6/1.3i) 7-2-6/1.3i) --- 6-2-6/1.3ii) 7-2-6/1.3ii) --- 6-2-6/1.3iii) 7-2-6/1.3iii) --- 6-2-6/1.3iv) 7-2-6/1.3iv) --- 6-2-6/1.3v) 7-2-6/1.3v) --- 6-2-6/1.5 7-2-6/1.5 柱稳式平台 6-2-6/1.7 7-2-6/1.7 压舱和预载空间——所有平台 6-2-6/1.7.1 7-2-6/1.7.1 水面式平台 6-2-6/1.7.2 7-2-6/1.7.2 自升式平台 6-2-6/1.7.3 7-2-6/1.7.3 柱稳式平台 6-2-6/1.9 7-2-6/1.9 所有平台 6-2-6/1.9.1 7-2-6/1.9.1 压水舱的内部检查 6-2-6/1.9.2 7-2-6/1.9.2 海水阀 6-2-6/1.9.3 7-2-6/1.9.3 推进装置的外部部分 6-2-6/3 7-2-6/3 代替干坞检验的水下检验(UWILD) 6-2-6/3.1 7-2-6/3.1 条件 6-2-6/3.1.1 7-2-6/3.1.1 6-2-6/3.1.2 7-2-6/3.1.2 厚度测量和无损检测 6-2-6/3.1.3 7-2-6/3.1.3 图纸和数据
86 ABS海上移动平台入级与建造规范·2012
通知与总信息
6-2-6/3.1.4 水下条件 6-2-6/3.3 物理特性 6-2-6/3.3.1 船尾轴承 6-2-6/3.3.2 舵轴承 6-2-6/3.3.3 海水吸入装置 6-2-6/3.3.4 海水阀 6-2-6/3.5 工艺 6-2-6/3.5.1 暴露区域 6-2-6/3.5.2 水下区域 6-2-6/3.5.3 受损区域 6-2-6/3.7 可选性 第六部分 检验 第二章 建造后的检验 第七节 自升式平台在海运后的特殊检验 6-2-7 自升式平台在海运后的特殊检验 第六部分 检验 第二章 建造后的检验 第八节 艉轴检验 6-2-8 艉轴检验 6-2-8i) --- 6-2-8ii) --- 6-2-8iii) --- 6-2-8iv) --- 第六部分 检验 第二章 建造后的检验 第九节 锅炉的检验 6-2-9 锅炉的检验 6-2-9/1 需检验的部件 6-2-9/1.1 --- 6-2-9/1.3 --- 6-2-9/1.5 --- 6-2-9/1.7 --- 第六部分 检验 第二章 建造后的检验 第十节 自动和远程控制系统 6-2-10 自动和远程控制系统 6-2-10/1 年度检验 6-2-10/3 特殊周期检验 6-2-10/3.1 舵机和传动装置 6-2-10/3.3 电气 6-2-10/3.5 无人设备 6-2-10/5 修理或者可选性 第六部分 检验 第二章 建造后的检验 附录 1 搁置或者恢复使用的海上移动钻井平台指南 6-2-A1 搁置或者恢复使用的海上移动钻井平台指南 6-2-A1/1 搁置的海上移动钻井平台指南 6-2-A1/1.1 搁置要求 6-2-A1/1.1i) --- 6-2-A1/1.1ii) --- 6-2-A1/1.1iii) --- 6-2-A1/1.3 安全性和防护 6-2-A1/1.3i) --- 6-2-A1/1.3ii) --- 6-2-A1/1.3iii) ---
7-2-6/3.1.4
7-2-6/3.3 7-2-6/3.3.1 7-2-6/3.3.2 7-2-6/3.3.3 7-2-6/3.3.4 7-2-6/3.5 7-2-6/3.5.1 7-2-6/3.5.2 7-2-6/3.5.3 7-2-6/3.11
6-2-7
6-2-8 6-2-8i) 6-2-8ii) 6-2-8ii) 6-2-8iv)
6-2-9 6-2-9/1
6-2-9/1.1 6-2-9/1.3 6-2-9/1.5 6-2-9/1.7
6-2-10 6-2-10/1 6-2-10/3 6-2-10/3.1 6-2-10/3.3 6-2-10/3.5 6-2-10/5
6-2-A1 6-2-A1/1 6-2-A1/1.1 6-2-A1/1.1ii) 6-2-A1/1.1ii) 6-2-A1/1.1iii) 6-2-A1/1.3 6-2-A1/1.3i) 6-2-A1/1.3ii) 6-2-A1/1.3ii) ABS海上移动平台入级与建造规范·2012 87
通知与总信息
6-2-A1/1.3iv) 6-2-A1/1.3iv) --- 6-2-A1/1.3v) 6-2-A1/1.3v) --- 6-2-A1/1.3vi) 6-2-A1/1.3vi) --- 6-2-A1/1.3vii) 6-2-A1/1.3vii) --- 6-2-A1/1.3viii) 6-2-A1/1.3viii) --- 6-2-A1/1.3ix) 6-2-A1/1.3ix) --- 6-2-A1/1.3x) 6-2-A1/1.3x) --- 6-2-A1/1.3xi) 6-2-A1/1.3xi) --- 6-2-A1/1.3xii) 6-2-A1/1.3xii) --- 6-2-A1/1.3xiii) 6-2-A1/1.3xiii) --- 6-2-A1/1.3xiv) 6-2-A1/1.3xiv) --- 6-2-A1/1.3xv) 6-2-A1/1.3xv) --- 6-2-A1/1.3xvi) 6-2-A1/1.3xvi) --- 6-2-A1/1.5 6-2-A1/1.5 维护和保养 6-2-A1/1.5.1 6-2-A1/1.5.1 船体和甲板设备 6-2-A1/1.5.1(a) --- 7-2-A1/1.5.1(a) 6-2-A1/1.5.1(b) --- 7-2-A1/1.5.1(b) 6-2-A1/1.5.1(c) --- 7-2-A1/1.5.1(c) 6-2-A1/1.5.1(d) --- 6-2-A1/1.5.1(d) 6-2-A1/1.5.1(e) --- 6-2-A1/1.5.1(e) 6-2-A1/1.5.1(f) --- 6-2-A1/1.5.1(f)
6-2-A1/1.5.1(g) --- 6-2-A1/1.5.1(g) 6-2-A1/1.5.1(h) --- 6-2-A1/1.5.1(h) 6-2-A1/1.5.1(i) --- 6-2-A1/1.5.1(i)
6-2-A1/1.5.1(j) --- 6-2-A1/1.5.1(j) 6-2-A1/1.5.1(k) --- 6-2-A1/1.5.1(k) 6-2-A1/1.5.1(l) --- 6-2-A1/1.5.1(l) 6-2-A1/1.5.1(m) --- 6-2-A1/1.5.1(m)
6-2-A1/1.5.1(n) --- 6-2-A1/1.5.1(n) 6-2-A1/1.5.1(o) --- 6-2-A1/1.5.1(o) 6-2-A1/1.5.1(p) --- 6-2-A1/1.5.1(p) 6-2-A1/1.5.1(q) --- 6-2-A1/1.5.1(q) 6-2-A1/1.5.1(r) --- 6-2-A1/1.5.1(r) 6-2-A1/1.5.2 6-2-A1/1.5.2 机械舱室、机械、和钻井设备 6-2-A1/1.5.2(a) --- 6-2-A1/1.5.2(a) 6-2-A1/1.5.2(b) --- 6-2-A1/1.5.2(b) 6-2-A1/1.5.2(c) --- 6-2-A1/1.5.2(c) 6-2-A1/1.5.2(d) --- 6-2-A1/1.5.2(d) 6-2-A1/1.5.2(e) --- 6-2-A1/1.5.2(e) 6-2-A1/1.5.2(f) --- 6-2-A1/1.5.2(f)
6-2-A1/1.5.2(g) --- 6-2-A1/1.5.2(g) 6-2-A1/1.5.2(h) --- 6-2-A1/1.5.2(h) 6-2-A1/1.5.2(i) --- 6-2-A1/1.5.2(i) 6-2-A1/1.5.3 6-2-A1/1.5.3 锅炉 6-2-A1/1.5.3(a) --- 6-2-A1/1.5.3(a) 6-2-A1/1.5.3(b) --- 6-2-A1/1.5.3(b) 6-2-A1/1.5.4 6-2-A1/1.5.4 锅炉炉胆开口 6-2-A1/1.5.5 6-2-A1/1.5.5 电器安装 6-2-A1/1.5.5(a) --- 6-2-A1/1.5.5(a) 6-2-A1/1.5.5(b) --- 6-2-A1/1.5.5(b) 6-2-A1/1.5.5(c) --- 6-2-A1/1.5.5(c) 6-2-A1/1.5.5(d) --- 6-2-A1/1.5.5(d) 6-2-A1/1.5.5(e) --- 6-2-A1/1.5.5(e) 6-2-A1/1.5.5(f) --- 6-2-A1/1.5.5(f)
6-2-A1/1.5.5(g) --- 6-2-A1/1.5.5(g) 6-2-A1/1.5.5(h) --- 6-2-A1/1.5.5(h) 6-2-A1/1.5.5(i) --- 6-2-A1/1.5.5(i) 6-2-A1/1.5.6 6-2-A1/1.5.6 张紧系统和升降补偿 6-2-A1/1.5.7 6-2-A1/1.5.7 搁置点和系泊布置
88 ABS海上移动平台入级与建造规范·2012
通知与总信息
6-2-A1/1.5.7(a) 6-2-A1/1.5.7(a) 搁置点需要注意的事项
6-2-A1/1.5.7(a)i) --- 6-2-A1/1.5.7(a)i) 6-2-A1/1.5.7(a)ii) --- 6-2-A1/1.5.7(a)ii) 6-2-A1/1.5.7(a)iii) --- 6-2-A1/1.5.7(a)iii) 6-2-A1/1.5.7(a)iv) --- 6-2-A1/1.5.7(a)iv) 6-2-A1/1.5.7(a)v) --- 6-2-A1/1.5.7(a)v) 6-2-A1/1.5.7(a)vi) --- 6-2-A1/1.5.7(a)vi) 6-2-A1/1.5.7(a)vii) --- 6-2-A1/1.5.7(a)vii) 6-2-A1/1.5.7(a)viii) --- 6-2-A1/1.5.7(a)viii) 6-2-A1/1.5.7(a)ix) --- 6-2-A1/1.5.7(a)ix) 6-2-A1/1.5.7(a)x) --- 6-2-A1/1.5.7(a)x) 6-2-A1/1.5.7(a)xi) --- 6-2-A1/1.5.7(a)xi) 6-2-A1/1.5.7(b) 6-2-A1/1.5.7(b) 系泊布置需要注意的事项
6-2-A1/1.5.7(b)i) --- 6-2-A1/1.5.7(b)i) 6-2-A1/1.5.7(b)ii) --- 6-2-A1/1.5.7(b)ii) 6-2-A1/1.5.7(b)iii) --- 6-2-A1/1.5.7(b)iii) 6-2-A1/1.5.7(b)iv) --- 6-2-A1/1.5.7(b)iv) 6-2-A1/1.5.7(b)iv)a) --- 6-2-A1/1.5.7(b)iv)a) 6-2-A1/1.5.7(b)iv)b) --- 6-2-A1/1.5.7(b)iv)b) 6-2-A1/1.5.7(b)iv)c) --- 6-2-A1/1.5.7(b)iv)c) 6-2-A1/1.5.7(b)iv)d) --- 6-2-A1/1.5.7(b)iv)d) 6-2-A1/1.5.7(b)v) --- 6-2-A1/1.5.7(b)v) 6-2-A1/1.5.7(b)vi) --- 6-2-A1/1.5.7(b)vi) 6-2-A1/1.5.7(b)vii) --- 6-2-A1/1.5.7(b)vii) 6-2-A1/1.5.7(b)viii) --- 6-2-A1/1.5.7(b)viii) 6-2-A1/1.5.7(b)ix) --- 6-2-A1/1.5.7(b)ix) 6-2-A1/1.5.7(b)x) --- 6-2-A1/1.5.7(b)x) 6-2-A1/1.5.7(b)xi) --- 6-2-A1/1.5.7(b)xi) 6-2-A1/1.5.7(b)xii) --- 6-2-A1/1.5.7(b)xii) 6-2-A1/1.5.7(b)xiii) --- 6-2-A1/1.5.7(b)xiii) 6-2-A1/3 6-2-A1/3 恢复使用的海上移动钻井平台指南 6-2-A1/3.1 6-2-A1/3.1 恢复使用检验状态 6-2-A1/3.1i) --- 6-2-A1/3.1i) 6-2-A1/3.1ii) --- 6-2-A1/3.1ii) 6-2-A1/3.1iii) --- 6-2-A1/3.1iii) 6-2-A1/3.3 6-2-A1/3.3 船体和装备 6-2-A1/3.3.1 6-2-A1/3.3.1 干坞检验 6-2-A1/3.3.2 6-2-A1/3.3.2 执行功能测试和确认操作适用性
6-2-A1/3.3.2i) --- 6-2-A1/3.3.2i) 6-2-A1/3.3.2ii) --- 6-2-A1/3.3.2ii) 6-2-A1/3.3.2iii) --- 6-2-A1/3.3.2iii 6-2-A1/3.3.2iv) --- 6-2-A1/3.3.2iv) 6-2-A1/3.3.2v) --- 6-2-A1/3.3.2v)
6-2-A1/3.3.2vi) --- 6-2-A1/3.3.2vi) 6-2-A1/3.3.2vii) --- 6-2-A1/3.3.2vii) 6-2-A1/3.3.2viii) --- 6-2-A1/3.3.2viii) 6-2-A1/3.3.2ix) --- 6-2-A1/3.3.2ix) 6-2-A1/3.3.2x) --- 6-2-A1/3.3.2x)
6-2-A1/3.3.2xi) --- 6-2-A1/3.3.2xi) 6-2-A1/3.3.2xii) --- 6-2-A1/3.3.2xii) 6-2-A1/3.5 6-2-A1/3.5 机械和钻井设备 6-2-A1/3.5i) --- 6-2-A1/3.5i) 6-2-A1/3.5ii) --- 6-2-A1/3.5ii) 6-2-A1/3.5iii) --- 6-2-A1/3.5iii) 6-2-A1/3.5iv) --- 6-2-A1/3.5iv) 6-2-A1/3.5v) --- 6-2-A1/3.5v) 6-2-A1/3.5vi) --- 6-2-A1/3.5vi) 6-2-A1/3.5vii) --- 6-2-A1/3.5vii)
ABS海上移动平台入级与建造规范·2012
通知与总信息
6-2-A1/3.5viii) --- 6-2-A1/3.5viii) 6-2-A1/3.5ix) --- 6-2-A1/3.5ix) 6-2-A1/3.5x) --- 6-2-A1/3.5x) 6-2-A1/3.5xi) --- 6-2-A1/3.5xi) 6-2-A1/3.5xii) --- 6-2-A1/3.5xii)
6-2-A1/3.5xiii) --- 6-2-A1/3.5xiii) 6-2-A1/3.7 6-2-A1/3.7 电气
6-2-A1/3.7i) --- 6-2-A1/3.7i) 6-2-A1/3.7ii) --- 6-2-A1/3.7ii) 6-2-A1/3.7iii) --- 6-2-A1/3.7iii) 6-2-A1/3.9 6-2-A1/3.9 张力和运动补偿系统 6-2-A1/3.11 6-2-A1/3.11 控制仪表系统 6-2-A1/3.13 6-2-A1/3.13 试验 6-2-A1/3.15 6-2-A1/3.15 文件和证书 6-2-A1/3.15i) --- 6-2-A1/3.15i) 6-2-A1/3.15ii) --- 6-2-A1/3.15ii) 6-2-A1/3.15iii) --- 6-2-A1/3.15iii)
90 ABS海上移动平台入级与建造规范·2012
因篇幅问题不能全部显示,请点此查看更多更全内容
Copyright © 2019- ryyc.cn 版权所有 湘ICP备2023022495号-3
违法及侵权请联系:TEL:199 1889 7713 E-MAIL:2724546146@qq.com
本站由北京市万商天勤律师事务所王兴未律师提供法律服务